Beiträge von Pesche10

    aktuell +23% :)


    https://www.getchellgold.com/n…n-and-intersects-juniper/


    Getchell
    Gold Corp. Drills Best Colorado SW Hole to Date with Over 200 Metre
    Zone of Gold Mineralization, and Intersects Juniper Zone Grading 4.7 g/t
    Au over 25.9 m at Fondaway Canyon, NV
    Toronto, Ontario – August 25, 2021 – Getchell Gold Corp. (CSE: GTCH) (OTCQB: GGLDF) ("Getchell" or the "Company") is pleased to present the results from FCG21-08, the second drill hole of the 2021 drill program at the Company’s flagship Fondaway Canyon Gold Project in Nevada (“Fondaway” or “Project”).
    Key Highlights

    • FCG21-08 intersected the Colorado SW Zone for over 200 metres with mineralized intervals that included: 4.2 g/t Au over 27.5m, 2.8 g/t Au over 24.5m, 1.4 g/t over 30.7m and 1.3 g/t Au over 16.8m;
    • The high-grade Juniper zone was also intersected by FCG21-08 returning 4.7 g/t Au over 25.9m, that included 11.4 g/t Au over 5.5m, within 100 metres of the surface; The FCG21-08 Colorado SW intercepts are greater than 40 metres distance from FCG20-02 (1.9 g/t Au over 43.5m) and 55 metres on strike to the NW from hole FCG20-06 (1.5 g/t Au over 37.7m and 1.1 g/t Au over 38.3m). The Colorado SW Zone remains open along strike and to depth; and
    • Hole FCG21-08 is the seventh consecutive hole in the Central Area that has intersected substantive gold mineralization by the Company.

    Vancouver, British Columbia--(Newsfile Corp. - August 17, 2021) - Precipitate Gold Corp. (TSXV: PRG) (OTCQB: PREIF) (the "Company" or "Precipitate")
    is pleased to announce it has secured, by a combination of staking and
    property option agreements, exclusive rights to acquire a 100% interest
    in mineral exploration licenses totalling 12,350 hectares making up the Motherlode Gold Project (the "Motherlode Project" or the "Project") located within the Burin Peninsula of southern Newfoundland, Canada.
    Motherlode Project Highlights: *
    Select Historical Sampling Results

    • High grade gold rock grab samples: 25.0 g/t Au, 15.7 g/t Au, 11.6 g/t Au, 6.3 g/t Au & 4.5 g/t Au
    • Trench/Channel Results: 0.5m of 4.5 g/t Au, 1.5m of 10.1 g/t Au, 6.2m of 3.6 g/t Au (incl. 0.9m of 7.7 g/t Au)
    • 2007 Diamond Drill Results (8 holes, 902m): 0.7m of 3.2 g/t Au, 10.4m of 0.82 g/t Au, 1.5m of 2.8 g/t Au

    Gold Mineralization, Geology, Regional Geochemistry

    • 11 historical mineral occurrences, including 8 gold showings;
    • District-scale potential within an estimated 16.5-kilometre-long exploration trend hosted in late Proterozoic-age Burin Group volcanic and ultramafic rocks;
    • Major northeast trending, sub-vertical dipping shear-fault zones up to 30 metres wide;
    • Gold enriched quartz veins and quartz-silica stockworks are strongly associated with 'high strain' rocks (i.e. shears, schists, folds) with a generally low pyrite content;
    • Project regional government till, lake & stream sample geochemistry anomalies include gold, arsenic, antimony, copper, nickel and zinc.



    https://ceo.ca/@newsfile/preci…acquire-100-of-motherlode

    Wie es weitergeht ist wohl entscheidender:


    Guidance für H2 2021


    Die Goldproduktion für H2 2021, einschließlich Juli, wird voraussichtlich im Bereich von 27 bis 32 koz Au liegen, wobei die Gehalte und Durchsätze gegen Ende des Jahres stetig steigen. Die Cash Costs1 für das vierte Quartal, das erste vollständige Quartal der kommerziellen Produktion, werden voraussichtlich im Bereich von 1.025 bis 1.125 USD pro Unze liegen. Der AISC1 für das vierte Quartal wird voraussichtlich zwischen 1.600 und 1.750 USD pro Unze liegen. Mit Blick auf das Jahr 2022 wird erwartet, dass die Produktion steigt und die Cash Costs und AISC deutlich sinken werden, angetrieben durch höhere Gehalte und Durchsatz in Verbindung mit geringeren Investitionen in die Kapitalentwicklung und andere nachhaltige Kapitalprogramme. Diese Dynamik steigender Produktion und sinkender Kosten wird voraussichtlich 2022 und darüber hinaus anhalten, da sich die Gehalte im Allgemeinen verbessern, wenn der Abbau tiefer und in Richtung Zone 8 voranschreitet, wie in der Machbarkeitsstudie 2019 beschrieben.

    https://ceo.ca/@newsfile/getch…ersects-30-gt-au-over-330


    Getchell Gold Corp. Intersects 3.0 G/t Au over 33.0 Metres in First Hole of the 2021 Drill Program at Fondaway Canyon, Nevada


    Toronto, Ontario--(Newsfile Corp. - August 10, 2021) - Getchell Gold Corp. (CSE: GTCH) (OTCQB: GGLDF) ("Getchell" or the "Company") is pleased to present the results from the first drill hole of the 2021 drill program at the Company's flagship Fondaway Canyon Gold Project in Nevada ("Fondaway" or "Project").
    Key Highlights

    • 3.0 g/t Au over 33.0m in FCG21-07, the first hole of the 2021 drill program at Fondaway Canyon;
    • Represents a higher-grade gold mineralized interval than adjacent holes;
    • Establishes lateral continuity of the Colorado SW Extension gold zone;
    • Is the sixth consecutive hole in the Central Area that has intersected substantive gold mineralization by the Company;
    • Results for hole FCG21-08, testing the extent of the Colorado SW Extension zone on strike to the NW in an area not previously drilled, are pending;
    • Drill holes FCG21-07 and FCG21-08 were designed to start joining and demonstrate continuity of the previously drilled and widely spaced Colorado SW Extension mineralized zone drill intercepts along its 800m down-dip modelled length; and
    • The Colorado SW Extension zone remains open along strike and to depth.

    ceo.ca/@newswire/argonaut-gold-announces-record-quarterly-production-cb0af


    M.M. nach Starke Zahlen, einzig die AISC könnten tiefer sein.


    Argonaut Gold Announces Record Quarterly Production of 63,749 Gold Equivalent Ounces, Record Quarterly Revenue of $120.2 Million and Provides Second Quarter 2021 Operating and Financial Result


    TORONTO, Aug. 10, 2021 /CNW/ - Argonaut Gold Inc. (TSX: AR) (the "Company", "Argonaut Gold" or "Argonaut") is pleased to announce its operating and financial results for the second quarter ended June 30, 2021. The Company reports record quarterly production of 63,749 gold equivalent ouncesi("GEO" or "GEOs"), record quarterly revenue of $120.2 million, cash flow from operating activities before changes in non-cash operating working capital of $39.3 million, net income of $21.8 million or earnings per basic share of $0.07 and adjusted net incomeii of $24.4 million or adjusted earnings per basic shareii of $0.08. All dollar amounts are expressed in United States dollars, unless otherwise specified (C$ refers to Canadian dollars).

    https://www.minenportal.de/art…onszahlen-fuer-Q2-21.html



    McEwen Minig Inc. veröffentlichte gestern die konsolidierten Produktionszahlen der Monate April bis Juni 2021. Im Vergleich zum zweiten Quartal 2020 ergab sich den Angaben zufolge ein deutlicher Anstieg der Gold- und Silberproduktion.


    Insgesamt förderte das Unternehmen in den drei Monaten 31.700 oz Gold und 611.800 oz Silber. Dies entsprach basierend auf einem Gold/Silber-Verhältnis von 68:1 rund 40.800 oz Goldäquivalent. Im Vorjahreszeitraum waren es 15.700 oz Gold und 359.400 oz Silber (19.200 oz Goldäquivalent).


    Für die einzelnen Minen wurden folgende Zahlen gemeldet:


    • Black Fox, Kanada (100% unternehmenseigen): 7.100 oz Goldäquivalent;
    • El Gallo, Mexiko (100% unternehmenseigen): 1.300 oz Goldäquivalent;
    • San José, Argentinien (49% unternehmenseigen): 18.300 oz Goldäquivalent zurechenbar;
    • Gold Bar, Nevada (100% unternehmenseigen): 14.100 oz Goldäquivalent.


    Im Gesamtjahr rechnet McEwen nach wie vor mit einer Produktion von 141.000–160.400 Unzen Goldäquivalent.

    Mal wieder was neues:


    Highlights include:

    • - A high-grade intercept of 1,776 g/t silver and 2.55 g/t gold over 1.52 meters, within a 7.62-meter interval that averaged 563 g/t silver and 0.73 g/t gold in hole SO-C-21-73 (see table 1 and map below). This is in the same area where previous drilling intercepted values to 1,129 g/t silver and 1.33 g/t gold over 8 m within a 28 m interval of 350 g/t silver and 0.45 g/t gold (see news release of May 26, 2020) and 1,032 g/t silver and 1.51 g/t gold over 3 m within 12 m of 407 g/t silver and 0.55 g/t gold (see news release of February 16, 2021)


    • - Additional intercepts include: 546 g/t silver and 1.16 g/t gold over 3.05 meters, within a 13.72-meter interval averaging 233 g/t silver and 0.47 g/t gold in hole SO-C-21-74 and; 477 g/t silver and 1.47 g/t gold over 3.05 meters, within a 7.62-meter interval averaging 273 g/t silver and 0.74 g/t gold in hole SO-C-21-79


    • - Drill holes SO-C-20-69, SO-C-21-72A and SO-C-21-79 have extended the down-dip, higher-grade mineralization an additional 250 meters to the north of Mount Diablo pit, with select silver equivalent grades that greatly exceed the historical average grade of 88 g/t of silver mined by Kinross and its predecessors in the open pits.


    • - Drill holes intercepts have also expanded the along-strike, potential open-pit mineralization 100 meters and 500 meters to the east and west of the Mount Diablo pit, respectively. Mineralization remains open along strike


    https://ceo.ca/@thenewswire/si…1776-gt-silver-and-255-gt

    http://www.aurcana.com/news/index.php?content_id=481


    Der Produktions Start erfolgt ende Juni.
    Gibt es für die viel (zurecht) gescholtene Aurcana und deren Aktionäre doch noch ein Happy End?
    Mit einer Mkt Cap von nur 250 Mio C$ sehr günstig bewertet!



    Vancouver, BC - 4. Mai 2021 - Die Aurcana SILVER Corporation ("Aurcana" oder das "Unternehmen") (TSXV: AUN, OTCQX: AUNFF) freut sich, ein Konstruktionsupdate und einen Produktionsausblick für den Rest des Jahres 2021 für ihre Einnahmen vorlegen zu können Virginius Mine (RV) in der Nähe von Ouray, Colorado.



    Minenentwicklung



    Die unterirdische Minenentwicklung verläuft planmäßig, wobei drei Erhöhungen vertikal von der Haupttransportstufe 2000 von 800 Fuß auf die Stufe 1200 gefahren werden (siehe Abbildung 1 unten).
    Die Nr. 1 Alimak Raise schreitet mit einer durchschnittlichen Geschwindigkeit von mehr als 16 Fuß pro Tag vertikal voran und soll bis Ende Mai fertiggestellt sein. Danach werden das Hub- und Schachtholz für den dauerhaften Zugang von Männern und Material installiert.
    Die Alimak-Erhöhung Nr. 2 hat die Stufe 1500 erreicht und wird vorübergehend für den Transport von Männern und Materialien von der Stufe 2000 auf die Stufe 1800 und 1500 verwendet, bis die Alimak-Erhöhung Nr. 1 abgeschlossen ist.
    Die vertikale Entwicklung Nr. 3 Alimak Raise begann im Mai und soll in der dritten Maiwoche das Niveau von 1800 erreichen.
    Nach Abschluss der Alimak-Erhöhung Nr. 1 werden die Alimak-Erhöhungen Nr. 2 und Nr. 3 Erz- und Abfallerhöhungen gewidmet.
    Die (horizontale) Entwicklung des Niveaus hat auf dem Niveau von 1800 begonnen, um die Virginius-Ader zu kreuzen, die in der dritten Maiwoche stattfinden soll. Im Anschluss daran wird die Entwicklung fortgesetzt, indem Drifts sowohl nach Norden als auch nach Süden auf einer Ader über 1000 Fuß gefahren werden, um die Entwicklung der Stops vorzubereiten.
    Die Stope-Entwicklung auf dem Niveau von 1800 wird voraussichtlich Ende Juni mit dem ersten Erz zur Mühle Anfang Juli beginnen.
    Die Erzentwicklung auf 1800-Ebene liegt im Zeitplan, um im Juli das erste Erz an die Verarbeitungsanlage zu liefern. Zwei Stopps (Bergbaublöcke) auf der Ebene von 1800 stellen die anfängliche Erzversorgung bereit, während Stopps auf der Ebene von 1500 entwickelt werden.
    Es wird erwartet, dass bis Ende 2021 vier Stopps zur Verfügung stehen (zwei Stopps pro Ebene), um die Verarbeitungsanlage zu versorgen. Es sind jedoch nur zwei Stopps erforderlich, um die 270 Tonnen pro Tag bereitzustellen, die in der Machbarkeitsstudie 2018 („2018 FS“) angegeben sind, die gemäß National Instrument NI 43-101 - Offenlegungsstandards für Mineralprojekte („NI 43-101“) erstellt wurde ”). Eine Kopie des FS 2018 wird auf der Website des Unternehmens unter http://www.aurcana.com veröffentlicht und ist auch im Unternehmensprofil auf SEDAR unter http://www.sedar.com verfügbar.



    Vorbereitung der Verarbeitungsanlage



    Alle Upgrades der Verarbeitungsanlage, einschließlich der Installation zusätzlicher Flotationskapazität, des Austauschs von Zyklonen durch Kalibrierungssiebe, der Installation einer Stabmühle, der Installation von Brechern und Förderbändern sowie eines neuen Instrumentensteuerungssystems, werden bis Mitte Juni abgeschlossen sein. Die Inbetriebnahme der Aufbereitungsanlage mit Wasser ist für die letzte Juniwoche mit dem ersten Erz durch die Aufbereitungsanlage in der zweiten Juliwoche geplant.
    Die letzten Arbeiten an der Übergangsrutsche vom Groberzbehälter zum neuen Primärpfannenförderer sollen bis zum 10. Juli 2021 abgeschlossen sein und den vollständigen Betrieb der Aufbereitungsanlage ermöglichen.
    Der Durchsatz wird im Laufe des Juli auf 111 Tonnen pro Tag (tpd) im August und dann auf das volle Produktionsniveau von 270 tpd im September erhöht.
    Konzentratlieferungen werden in 100-Tonnen-Losen erfolgen und voraussichtlich Anfang August beginnen. Trafigura Trading LLC ist der Abnehmer von 100% der Konzentrate und zahlt den Wert von 95% der enthaltenen Metalle basierend auf den Konzentrat-Assays des Minenstandorts zum Zeitpunkt des Versands, wobei die endgültige Abrechnung auf der Grundlage der Schmelzerenditen erfolgt.
    Die zu zahlende Produktion von Silberäquivalenten1 für den Zeitraum von August bis Dezember 2021 wird voraussichtlich 1.300.000 bis 1.600.000 Unzen betragen, bei geschätzten Betriebskosten zwischen 10,00 USD und 12,00 USD / Unze Silber nach Nebenproduktgutschriften2.

    http://www.excellonresources.c…Presentation-May-2021.pdf


    Vorallem das Kilgore Projekt könnte interessant werden:


    ASSUMPTIONS
    Gold Price $1,300/oz
    PRODUCTION PROFILE
    Total Leach Tons Mined
    54.0 million
    Total Waste Tons Mined
    60.0 million
    Head Grade - Crushed
    0.72 g/T (0.02 opt)
    Head Grade - ROM
    0.24 g/T (0.007 opt)
    Mine Life
    5.0 years
    Tons per Day Mined - Crushed
    15,000 tons per day
    Tons per Day Mined - ROM
    15,300 tons per day
    Strip Ratio (Waste: Mineralized Material)
    1.1:1
    Average Au Recovery – Crushed / ROM
    82% / 50%
    Total Gold Ounces Mined
    752,200
    Total Gold Ounces Recovered
    558,700
    Average Annual Gold Production
    111,700 oz
    Peak Annual Gold Production
    119,600 oz in year 1
    UNIT OPERATING COSTS
    Total Operating Cash Costs
    $780/oz
    All-In Sustaining Cost
    $832/oz


    Initial Cap-ex
    $81 million
    Pre-tax NPV5%/ After-tax NPV5%
    $144.0 million/$110.4 million
    Pre-tax IRR/ After-tax IRR
    40.6%/34.0%


    + die weiteren Projekte und dies bei einer Mkp von ca 112 Mio C$