Big Pond Area Diamond Drilling Highlights Potential for New Discoveries
Highlights
• First significant intercepts from reconnaissance greenfield diamond drilling of the Big Pond Area indicates potential for structurally controlled gold mineralisation:
- 1 metre at 6.7 g/t Au and 1 metre at 1.9 g/t Au (CRD296)
- 3 metres at 2.8 g/t Au and 3 metres at 2.1 g/t Au and 1 metre @ 2.3 g/t Au (CRD288)
• WGH Mineral Resource Infill drilling: 1 metre at 12.8 g/t Au and 9 metres at 1.1 g/t Au (CRD226)
• WGHG Margin: 2 metres at 5.6 g/t Au (CRD287), 1.2 metres at 6.7 g/t Au (CRD289), 4.2 metres at 2.1 g/t Au and 2 metres at 2.3 g/t Au (CRD291)
• Assays are pending for 31 diamond holes (4,241 metres) across four target areas