Beiträge von pascal1291

    http://www.finanznachrichten.d…8-04/artikel-10633704.asp



    LONDON (Thomson Financial) - Griffin Mining Ltd. (News) said it has agreed to acquire Canada-based Yukon Zinc Corp. (News), and added it will offer one share for every nine Yukon Zinc shares held.
    The company said the transaction needs the approval of two-thirds of Yukon Zinc's shareholders, and added Yukon Zinc has agreed to pay a break fee of C$2.5 million.
    Griffin said the shares to be issued as payment would be valued at 45.31 million pounds based on the closing price of Griffin's shares of 89.5 pence on April 21.
    After completion, Griffin will have a 60 percent interest in the low-cost Caijiaying zinc-gold-silver-lead mine in the People's Republic of China and a 100 percent interest in the high grade advanced zinc-silver-copper-gold-lead Wolverine project in Yukon Canada.
    When the Wolverine project achieves full production status, projected annual zinc production in concentrates from Caijiaying and Wolverine is expected to be above 150 million pounds and annual payable silver production above 4.5 million ounces, along with significant production of copper, gold and lead.

    http://www.rohstoff-welt.de/news/artikel.php?sid=4858




    Mexican Silver Mines Ltd. meldet ein Explorations-Update seines Projektes Iguana
    30.01.2008 | 19:59 Uhr | IRW-Press


    Mexican Silver Mines Ltd. ("Mexican Silver" oder "MSM") freut sich, ein Update bezüglich der Explorationsaktivitäten auf seinem Projekt Iguana, auf der Konzession Ral, bekannt zu geben. Die Diamantbohrungen auf diesem Projekt begannen im vierten Quartal 2007. Mit dem unternehmenseigenen mobilen Bohrgerät Longyear 44 von MSM wurden bisher insgesamt 911 Meter bebohrt. Für das Phase-I-Bohrprogramm bei Iguana sind insgesamt sieben Bohrlöcher geplant, von denen bis dato drei Bohrlöcher abgeschlossen wurden. Bohrloch IG-04 wird zurzeit in einer Tiefe von 200 Meter bebohrt. Sämtliche Ergebnisse der Probentnahmen des Bohrkerns sind noch ausständig.


    Das Projekt Iguana befindet sich auf der Konzession Ral von MSM, welches ein Gebiet von 10.160 Acres umfasst. Hochgradige Silber-Blei-Zink-Mineralisierungen wurden als Verdrängungsmantos und Skarne innerhalb von Kontaktzonen mit Granodioriten aus dem Tertiär gefunden, die in Kontakt mit Kalksteinen aus der Kreidezeit stehen. In einigen Minenanlagen erstreckt sich die hochgradige Mineralisierung auf über einhundert Meter und äußert sich als Verdrängung eines einzelnen Kalksteinhorizontes.


    Bei Iguana wiesen sowohl Oberflächen- als auch Untergrundgesteinssplitterproben – vor allem im Gebiet der Mine Guadalupe – auf hochgradige Zonen mit Silberwerten im Kilogramm-pro-Tonne-Bereich hin. Gesteinssplitter- und Bodenproben wurden auf dem ganzen Projekt durchgeführt. Diese beinhalteten auch ein Gebiet mit einer Oberflächenalteration, das mit dem Gebiet der historischen Bergbautätigkeiten übereinstimmt. Im Rahmen des Kartierungsprogramms wurden günstige Intrusions-/Kalksteinkontakte definiert, welche potenzielle Zielgebiete aufweisen, die nun bebohrt werden.


    Eine geologische Interpretation der Lithologie dieser Bohrung weist darauf hin, dass in der gesamten Zone der Oberflächenalteration auf dem Projekt Iguana sowohl senkrechte Intrusionserdwalle als auch intrusive Lagergänge vorhanden sind. Ton-, Quarz-, Serizit- und Pyritalterationen wurden in einer Reihe von dazwischen liegenden Intrusionen im Bohrkern beobachtet. Zudem wurden Bleiglanz und Sphalerit in unterschiedlichen Mengen entdeckt; diese stehen in räumlichem Zusammenhang mit den Intrusionen und den Karbonathorizonten.


    Nach dem Abschluss dieses Phase-I-Bohrprogramms bei Iguana wird – abhängig von der Verbreitung und Intensität der Alteration unterhalb der Oberfläche – eine IP-Untersuchung in geringen Abständen in Betracht gezogen, um weitere potenzielle Ziele zu definieren.


    Alle Bohrkernproben werden an ALS Chemex Laboratory ("Chemex") zur Analyse verschickt. Chemex besitzt ein ISO 9001:2000-Zertifikat als internationale Standardorganisation und ist von Mexican Silver unabhängig. Die geteilte Bohrkernprobe wurde zerkleinert, und eine Sub-Probe (aliquot) wurde abgespalten, pulverisiert und mit einem 150 Mesh-Screen überprüft. Die Analysen wurden mittels eines Säureaufschlusses und spektrographischer Techniken durchgeführt.


    Mexican Silver hält sich an ein strenges Qualitätssicherungs-/Qualitätskontrollprogramm, welches das Hinzufügen von Standard- und Doppelproben zu der an Chemex verschickten Probensequenz beinhaltet. William Dynes, P.Geol., der Projektsupervisor des Bohrprogramms von Mexican Silver auf dem Grundstück Vallecillo, ist die vom Unternehmen ernannte qualifizierte Person, die für die Beaufsichtigung und Qualitätskontrolle der auf diesen Grundstücken durchgeführten Programme verantwortlich ist. William Dynes hat die technischen Informationen dieser Pressemitteilung überprüft und verifiziert.

    heute up + 38% auf 0.57C$, bin jetzt gerade auf einstandskurs, hoffe es geht weiter so :)




    Mexican Silver Mines Ltd. Announces Exploration Results From the Magnolia Mine Area Within the Vallecillo Ag-Pb-Zn Mining District
    Monday January 28, 12:36 pm ET


    CALGARY, ALBERTA--(Marketwire - Jan. 28, 2008) - Mexican Silver Mines Ltd. ("Mexican Silver" or "MSM") (TSX VENTURE:MSM - News; FRANKFURT:MS2 - News) is pleased to announce additional information regarding exploration at the Magnolia mine area within the Vallecillo Ag-Pb-Zn mining district. MSM's Phase I exploration program at the Vallecillo district consisted of surface mapping, sampling and initial diamond drilling on multiple targets located along a five kilometer long structure that hosts mineralization within the Vallecillo district. These multiple targets are known as the Dolores mine, the Santa Maria mine, the Magnolia mine and the Coronel mine. The Magnolia mine area is located approximately three kilometers west of the Dolores shaft, the main historic producer in the district.


    ADVERTISEMENT
    Detailed surface mapping and rock chip sampling within the Magnolia mine area has been completed with positive results. Multiple vein systems have been identified from the historic workings and have been sampled both on the surface and in underground stopes. These samples averaged from 0.2 to 0.8 meters in width with assay results ranging from 10 to 100 gm/tonne silver. Lead assays averaged from 0.5% to 5.0%. Potential targets at Magnolia include both lateral extensions to the mineralization at depths to 30 meters where the historic workings are located and within the stratigraphic sequence beneath the workings which provide significant upside to the project.


    A single drill hole, V-12, was drilled 50 meters to the east of the Magnolia shaft and, as previously reported, intersected 1.3 meters of calcite/sulphide vein material that assayed 374 gm/tonne Ag and 12.35% Pb. This mineralized interval was located at down hole depth of 146.5 to 147.8 meters. Additionally, an intercept of one meter assaying 24 g/t Ag was drilled from 38.7 to 39.7 meters. Historically, the underground stopes and mine workings at Magnolia are estimated to have been developed to depths of only 30 meters. This intercept of 11 oz/t Ag and 12% Pb at 146 meters depth represents a newly discovered zone of mineralization that will be further evaluated in the Phase II drilling program at Vallecillo. The Eagle Ford formation hosts the majority of the mineralization in the district and is the host for the intercepts encountered in drill hole V-12.


    The mineralization found at the Magnolia mine area, both in drill hole V-12 and in the underground workings, is situated on the crest of the northwesterly trending Vallecillo anticline. This anticlinal feature is a favorable structural location for mineralization to be emplaced. All of the mines located within the Vallecillo structural zone are present on this anticline. The Dolores and Santa Maria mines are on the eastern limb of the anticline; the Magnolia mine area is on the crest of the anticline and the Coronel mine area is located on the western limb. Mexican Silver is evaluating the use of a variety of ground geophysical techniques to augment the exploration program in the district prior to the start of Phase II drilling.


    The Vallecillo district has been the site of silver-lead mining activities dating back to 1776, where mineralization is hosted within structures and mantos in a sequence of interbedded limestones and silty carbonates. The largest historic mine in the district, the Dolores mine, has a known depth of 100 metres. The Vallecillo district is located in the southern part of the Mexican Silver's 100-per-cent-owned Providencia concession.


    All drill core samples were shipped to ALS Chemex Laboratory ("Chemex") for analyses. Chemex has an International Standard Organization rating of ISO 9001:2000 and is independent of Mexican Silver. The split drill core sample was crushed and a sub-sample (aliquot) split off, pulverized and screened through a 150 mesh screen. Analyses were performed using standard acid digestion and spectrographic techniques. Mexican Silver follows a rigorous Quality Assurance/Quality Control program consisting of inserting standards and duplicates into the sample stream submitted to Chemex for analyses. Mr. William Dynes, P. Geol., the project supervisor of Mexican Silver's drilling program on the Vallecillo Property, is the Corporation's nominated Qualified Person responsible for monitoring the supervision and quality control of the programs completed within the its properties. Mr. Dynes has reviewed and verified the technical information contained in this news release.


    This news release contains forward-looking information including but not limited to comments regarding the timing and content of upcoming work programs, geological interpretations and potential mineral recovery processes. Forward-looking information includes disclosure regarding possible future events, conditions or results of operations that is based on assumptions about future economic conditions and courses of action, and therefore, involves inherent risks and uncertainties. When used in this news release. The words "estimated", "plan", "anticipated", "expected", "intend", "believe", and similar expressions are intended to identify forward-looking statements. These statements involve known and unknown risks, uncertainties and other factors that may cause the actual results, performance or achievements of Mexican Silver to be materially different from any future results, performance or achievement expressed or implied by such forward-looking statements. For any forward-looking information given, management has assumed that the analytical results it has received are reliable, and has applied geological interpretation methodologies which are consistent with industry standards. Although management has a reasonable basis for the conclusions drawn, there can be no assurance that forward-looking statements will prove to be accurate and actual results may differ materially from those currently anticipated in such statements. For such statements, we claim safe harbour.


    About Mexican Silver Mines


    Mexican Silver Mines is a silver focused junior resource company developing three former silver producing properties in north-eastern Mexico. To learn more about Mexican Silver Mines, please visit: http://www.mexicansilvermines.com.


    ON BEHALF OF THE BOARD OF MEXICAN SILVER MINES LTD.


    Feisal Somji, B.Sc., MBA, President and Chief Executive Office


    The TSX Venture Exchange has not reviewed and does not accept responsibility for the adequacy and accuracy of this information.



    Contact:


    Feisal Somji
    Mexican Silver Mines Ltd.
    President & CEO
    (403) 236-5089
    (403) 398-0693 (FAX)
    Email: info@mexicansilvermines.com
    Website: http://www.mexicansilvermines.com


    Jamie Mathers
    Ascenta Capital Partners Inc.
    Investor Relations



    http://biz.yahoo.com/ccn/080128/200801280438648001.html?.v=1
    (604) 684-4743 ext. 236 ro Toll Free: 1-866-684-4209
    Email: jamie@ascentacapital.com


    ja, jetzt wo endlich die Produktion beginnt

    Bei mehr traden hätt man sehr gute Ergebnisse erzielen können, einige laden ja dazu ein wie Sabina, FR und auch SRLM........
    Hab ich aber sein lassen aus Steuergründen.



    Grüße
    Tschonko[/quote]


    hallo zusammen


    welche eignen sich sonst noch zum traden?

    Pressemitteilung 19. Dezember 2007


    Update zu den Operationen der Gesellschaft




    TWIN HILLS MINE
    Silberpulver Produktion


    Die Produktion von Silberpulver lag im November bei 10’400 Unzen und im Dezember wurden bis jetzt 32’500 Unzen Silber produziert. Die Produktion im Dezember ist hauptsächlich wegen der Einführung einer dauerhaften Schicht in der Gewinnungsanlage signifikant höher. Dort lagern momentan 41'800 Unzen an Silberpulver.


    Ein Wet von einem Silberpreis von 16 AUD ausgehend ca. 700 000 AUD


    Wir erwarten, dass die Produktion steigen wird, weil wir nun auch die 150’000 t Erz auf dem Laugungshaufen mit Zyanid behandeln werden und in nächster Zeit mehr zerkleinertes Erz aus dem vergrößerten Zerkleinerungskreislauf verfügbar wird.


    Verbesserungen bei der Erzbehandlung


    Für die Gewinnung von Silber aus der Lauge wird eine Merril Crowe Anlage notwendig, sobald die Menge an Silber in der Lauge unter das Level fällt, welches eine effiziente Operation ermöglicht. Die Konstruktion einer solchen, modular aufgebauten Anlage wird im Januar beginnen. Sobald das erste Modul in Betrieb genommen wurde, werden weitere folgen, sofern das erforderlich ist. Die Kosten für das erste Modul schätzen wir auf etwa 150'000 $.


    Erzförderung und Konstruktion von Laugungshaufen


    Die Bergbauaktivitäten bestehen derzeit hauptsächlich aus der Zerkleinerung von Erz, wobei wir Ende November 95’000 t zur direkten Zerkleinerung und weitere 109’700 t an niedrig gradigerem Erz auf Halde gelagert haben. Dies ermöglicht es uns, einen Teil der Bergbauausrüstung für Erdarbeiten zur Konstruktion des nächsten Laugungshaufens westlich der bestehenden Haufen und Becken einzusetzen.


    Dieser neue Laugungshaufen wird eine Kapazität von etwa 400'000 t an Erz haben. Der Bereich des Laugungshaufens und die damit verbundenen Abläufe werden mit einer hochdichten Polyethylenfolie ausgekleidet und kann Ende März 2008 mit Erz befüllt werden.


    Das im Moment zerkleinerte Erz wird auf den bestehenden Laugungshaufen aufgebracht, welcher eine Höhe von 8 m hat und rund 200'000 t an Erz aufnehmen kann.


    Zerkleinerungskreislauf – Kapazitätserhöhung Stufe 1


    Ein Kontrakt über die Installation und den Betrieb weiterer Förderananlagen wurde unterzeichnet und diese Maßnahme erfordert die Einstellung eines erfahrenen Aufsehers, dessen Ankunft wir für den Januar 2008 erwarten. Aufgrund der enormen Arbeitsauslastung erwartet das beauftragte Unternehmen, die Arbeiten nicht vor dem 15. Mai 2008 abschließen zu können, wenngleich wir alles unternehmen, um diese Arbeiten früher zu beenden.


    Die zusätzlichen Fördereinrichtungen werden feines Material (kleiner als 4mm) direkt zu den Laugungsanlagen transportieren. Dies wird den gesamten Erzausstoß erhöhen und die Kosten reduzieren, da die Zerkleinerungsanlage derzeit durch den Rückfluss von sehr feinem Material negativ beeinflusst wird.


    Ein weiterer Vorteil dieser erhöhten Zerkleinerungskapazität ist die Möglichkeit, Sprengungen in geringeren Abständen vorzunehmen um kleinere Erzbrocken zu gewinnen, welche schneller verarbeitet werden können.


    Der Aufseher des beauftragten Unternehmens wird den Betrieb und die Entwicklung in der gesamten Zerkleinerungsanlage leiten und überwachen und weitere Verbesserungsvorschläge unterbreiten.


    Exploration und die Akquisition weiterer Projekte


    Wie im letzten Update bereits erwähnt, fährt das Unternehmen damit fort, seinen Anteil an Silber-/Zink-/Bleiprojekten in ganz Queensland auszuweiten, um ein weiteres Wachstum und die Ausweitung der Operationen zu ermöglichen. Diese Strategie untermauert die langfristige Ausrichtung des Unternehmens, Silberprojekte hoher Qualität auszuwählen und zu entwickeln. Im folgenden findet sich eine Zusammenfassung der letzten Änderungen bezüglich der Explorationsliegenschaften des Unternehmens.


    Zentral Queensland


    Tally Ho Projekt


    Die Genehmigung 15168 zur Exploration nach Mineralien (EPM15168 – Connors Range), (s. Pressemitteilungen vom 9. Mai 2006 & 13. September 2006) wurde am 16. November 2007 zugeteilt. Die Connors Range EPM umgibt das kürzlich durch Bohrungen getestete Tally Ho Silberprojekt und deckt den südöstlichen Teil des Tally Ho Intrusive Komplex (THIC) ab.


    Die Zuteilung der Connors Range EPM ebnet den Weg für die Fortsetzung der Exploration entlang der Streichlänge (in beide Richtungen) der bereits identifizierten Mineralisation im Tally Ho Silberprojekt. Weitere Bohrungen werden eine Reihe an Zielen in beide Richtungen testen, sowie Bereiche, welche an die bereits identifizierte Mineralisation angrenzen und sollen in der ersten Hälfte des Jahres 2008 beginnen.


    Eine zweite Genehmigung zur Exploration nach Mineralien (EPM15775 – Denison Creek), welche den nördlichen Teil des THIC abdeckt und sich an die EPM 15168 anschließt, wurde am 30. Oktober 2007 erteilt. Diese EPM wurde in der Pressemitteilung vom 13. September 2006 als “Pisgah” bezeichnet.


    Die Erteilung der EPMs für die Connors Range und Denison Creek erlaubt es Macmin, eine regionale Exploration des THIC durchzuführen, von welchem wir annehmen, dass er weitere, bislang nicht bekannte, mineralisierte Systeme beherbergt.


    Mt Scott Projekt


    Die Genehmigung 15854 zur Exploration nach (EPM15854 – Mt Scott) wurde erstmals in der Pressemitteilung vom 13. September 2006 erwähnt.


    Aufgrund der ersten, positiven Ergebnisse der Bohrungen im Tally Ho Silberprojekt konnten wir durch ein Studium der vorhandenen Unterlagen eine Reihe von weiteren Zielen (Mt. Scott, Mt. Scott South und Kelvin’s), welche mit dem Mt. Scott Granit in Verbindung stehen, identifizieren. Gemäß den Aufzeichnungen weisen diese Ähnlichkeiten zu dem mineralisierten System in Tally Ho auf und haben bislang nur eine geringe oder gar keine Exploration erfahren.


    Die Mt. Scott EPM deckt diese Ziele ab und eine erste Begutachtung vor Ort wird Anfang 2008 vorgenommen, mit dem Ziel, geeignete Explorationsarbeiten vorzunehmen.


    Zusätzlich zu den regulären Quartalsberichten wird das Unternehmen Updates zu den Operationen geben, sobald Fortschritte gemacht wurden.



    Hochachtungsvoll
    MACMIN SILVER LTD


    Garry Edwards
    CHIEF EXECUTIVE OFFICER


    http://forum.finanzen.net/foru…?thread_id=246768&page=26

    Habe mal ein mail an KXL gemacht , betreffend der weiteren entwicklung der Firma.


    Hier die antwort:


    Dear



    Thank you for your interest in Kodiak Exploration Limited. In regards to your question, we will do what is in the best interest of the shareholders; all our options are open at this point.