bin mal die PEA durchgegangen und hier mal das was mir positiv aufgefallen ist:
1. Exploration potential for the property is deemed as high. Since 1994, when the surface exploration was terminated, the glaciers surrounding the Red Mountain gold project have significantly receded exposing considerable area that was previously inaccessible. The intrusion system that hosts the current resource has a broad areal extent and surface prospecting, mapping, geochemistry, geophysics and drilling have the potential to discover similar deposits. Additional drilling also has the potential to expand the current resource zones.
2. Further work is recommended for the Red Mountain gold project. ACS recommends that a feasibility study be prepared to evaluate the potential economic nature of the Red Mountain deposit. Contingent on positive results of the feasibility study, ACS recommends that IDM carry out a 7,500 m underground definition drilling program to help convert additional inferred mineral resource to indicated and measured and to expand the mineral resources down dip on the AV and JW zones.
und sonst so:
Grade: High-grade underground gold deposit, 7.0 g/t Au life of mine, fully diluted [/b]
Permitting: EA and permitting well advanced, EA Certificate expected in early 2018
•FS: Feasibility study underway
•Bulk mineable: low cost mining: average stope thickness 16 meters
•Pro-mining jurisdiction: Stewart is home turf for the McLeod family
•Rapid Payback and Expansion Potential: low cost mining, low capex and significant expansion potential
•Fast Tracked: Near-term production; investment decision in 2018
•Ease of Development: Close to work force, port, grid power and highway
•Golden Triangle: Valley of Kings, Eskay Creek, Premier, KSM in same belt
•Potential: Impressive Exploration upside along 16km mineralized trend
•Expandable: Existing Resource wide open to expansion
•Affordable: Sub $100 million Capex
•Strategic Shareholders: 79% with 11 major shareholders
[/b]
Near Term Deliverables
Red Mountain Resource Update – Q1 2017
Commence Underground Drilling – Q1 2017
Publish 43-101 Feasibility Study – Q2 2017
File Project Application EA Report – Q2 2017
Surface exploration and drilling – Spring/Summer 2017
Environmental Assessment Certificate received – Early 2018
mal schauen was kommt...