Future Metals NL (ASX:FME) is debuting on the Australian Securities Exchange, with plans to list on London's AIM in the near future.
The resources company owns the Panton platinum group metals (PGM) project located 60 kilometres north of Halls Creek in the East Kimberley Region of Western Australia.
Director Justin Tremain told Proactive that Panton is Australia's highest-grade PGM project and is rich in palladium. With PGM prices at record highs, its entry to the sector is timeous. -
Inhalte von externen Seiten werden ohne Ihre Zustimmung nicht automatisch geladen und angezeigt.
Durch die Aktivierung der externen Inhalte erklären Sie sich damit einverstanden, dass personenbezogene Daten an Drittplattformen übermittelt werden. Mehr Informationen dazu haben wir in unserer Datenschutzerklärung zur Verfügung gestellt.
"TORONTO, CANADA, Sept 13, 2021 – Black Iron Inc. (“Black Iron” or the “Company”) (TSX: BKI; OTC: BKIRF; FWB: BIN) has received a number of inbound inquires from shareholders over the past two weeks seeking an update on the Shymanivske Iron Ore Project (the “Project”) and progress with reaching binding offtake, land transfer and Ukraine government investment support agreements.
Further to the press release of the Company on June 30, 2021 and March 8, 2021, solid progress is being made by Wood PLC (“Wood”) on the Project’s feasibility study and Environmental Resources Management (“ERM”) on the Environmental & Social Impact Assessment (“EISA”) which are prerequisites to entering binding agreements for the royalty and construction debt.
ERM continues to advance the EISA with several field site investigations completed. Efforts are currently being made to locate Black Iron’s future processing plant, tailings, waste rock stockpiles and the defence training grounds to minimise the impact on the environmental and local communities while ensuring the Project’s viability.
Similarly, Wood continues to make good progress on the Project’s feasibility study which Black Iron anticipates completing in early 2022. Work is currently focused on finalizing the process design criteria, overall site layout, mine equipment selection and pit shell optimization. The next steps entail finalizing the mass and energy balance and the process flow diagrams, followed by major equipment sizing upon which requests for price quotations will be sent to equipment suppliers.
The following is a brief update on the key binding contracts management is progressing:
Offtake agreement – discussions with Cargill on this very complex binding agreement have been very positive and productive to date with the majority of the commercial terms having been settled and only a few key outstanding items left to resolve. The Company expects to complete these discussions shortly and will provide an update once a binding agreement is executed.
Land transfer – the Deputy Minister of Defence (“MOD”) and Chief of Ukraine’s armed forces who were responsible for Black Iron’s land transfer agreement were both recently replaced which has caused an unexpected delay. The Chief of the armed forces has since been replaced and a replacement for the Deputy Minister responsible to handle Black Iron’s land transfer is anticipated to occur very soon. The MOD land transfer agreement is not expected to impact the ability to enter into any of the other binding agreements, but will be a condition president to funding the Project. The change in Deputy Minister and Chief of Armed Forces could potentially accelerate bringing the land transfer agreement to conclusion as there may be better alignment between these two branches of the armed forces. Engineering designs for the new military training facility are well advanced with layout drawing for new buildings and ranges, initial building designs and cost estimate nearly completed.
Ukraine Government support & tax agreement – Ukraine’s government is still drafting legislation for implementation of this new law and Black Iron is compiling several large documents based on the legislation that has been finalized to date. The Company has entered into a memorandum of understanding on corporation with UkraineInvest which is the branch of Ukraine’s government tasked to negotiate investment agreements.
Royalty & debt financing – the next step is for independent engineers, marketing, tax and legal advisors to be engaged to conduct due diligence on behalf of the investors. This will likely commence prior to year end as further progress needs to be made on the feasibility study and EISA to ensure an efficient review given Black Iron needs to pay the costs for this diligence on behalf of the investors as is customary.
About Black Iron Black Iron is an iron ore exploration and development company, advancing its 100% owned Shymanivske Iron Ore Project located in Kryviy Rih, Ukraine. Full mineral resource details and projected project economics can be found in the NI 43-101 technical report entitled “(Amended) Preliminary Economic Assessment of the Re-scoped Shymanivske Iron Ore Deposit” published in March 2020 with an effective date of November 21, 2017 under the Company’s profile on SEDAR at http://www.sedar.com. The Project is surrounded by five other operating mines, including Metinvest’s YuGOK and ArcelorMittal’s iron ore complex. Please visit the Company’s website at http://www.blackiron.com for more information.
Corella significantly expands regional landholding after reporting broad drill intercepts of high purity bright white kaolin at Tampu; Corella Resources Managing Director, Tony Cormack, commented “The new area under application expands our footprint to a truly regional scale in Tampu region where a distinctive granitoid basement responsible for the high purity kaolin exists. With our increased understanding from the recent drilling and a supportive community of landowners who provided guidance to known occurrences, the Company has now secured all known prospective areas for bright white kaolin in the broader Tampu area. Both tenement applications are immediately adjacent to our existing granted tenements where a maiden mineral resource estimate is now being undertaken on the high purity bright white kaolin at the Tampu project. Our recent drilling results demonstrate that we have the highest purity kaolin in Australia and that we have scale to match.
The maiden mineral resource estimate for Tampu is on track with the Company expecting results in late September”
- Two new tenement applications expand landholding by 446%
- Corella has now established a regional scale footprint covering 768km2 (259 blocks) of contiguous ground being highly prospective for bright white kaolin
- Bright white kaolin occurrences associated with distinctive basement geology of the Beacon region – new ELA’s lock up the kaolin potential of the Tampu region
Inhalte von externen Seiten werden ohne Ihre Zustimmung nicht automatisch geladen und angezeigt.
Durch die Aktivierung der externen Inhalte erklären Sie sich damit einverstanden, dass personenbezogene Daten an Drittplattformen übermittelt werden. Mehr Informationen dazu haben wir in unserer Datenschutzerklärung zur Verfügung gestellt.
kanns nich öffnen... was bedeutet das: Mit dieser XML-Datei sind anscheinend keine Style-Informationen verknüpft. Nachfolgend wird die Baum-Ansicht des Dokuments angezeigt. <Error> <Code>AuthenticationFailed</Code> <Message> Server failed to authenticate the request. Make sure the value of Authorization header is formed correctly including the signature. RequestId: ......Time:2021-09-14T14:34:49.1942958Z </Message> <AuthenticationErrorDetail> Signed expiry time [Tue, 14 Sep 2021 13:21:23 GMT] must be after signed start time [Tue, 14 Sep 2021 14:34:49 GMT] </AuthenticationErrorDetail> </Error>
Highlights • Bulk sample test completed on 4,479 tonnes of ore from Wolverine, the largest orebody at Browns Range
• Tests results show a 45% grade increase to the mill and over 95% TREO recovery when feeding a 0.9% TREO Wolverine ore to the ore sorter circuit.
• Bulks sample tests have highlighted additional key factors to consider for ore sorting that are not apparent from small scale tests.
• Initial ore sorting tests on Banshee material shows amenability to sorting, with further testwork planned.
• Effective sorting of the lower grade Banshee material has potential to increase the Browns Range Mineral Ore Reserve estimate
Australian heavy rare earths producer, Northern Minerals Limited (ASX: NTU) (the Company) is pleased to announce that it has progressed its ore sorting project enhancement initiative with the commissioning and testing of the sorter system and is now producing ore sorted material and converting this to a 30% TREO concentrate in its’ Browns Range beneficiation plant. Northern Minerals’ CEO, Mark Tory, said “The construction, commissioning and testing of the ore sorter circuit marks another milestone in the development of the Browns Range Project. “The positive bulk sample tests confirm the effectiveness of the ore sorting circuit on the Wolverine ore to significantly increase the head grade to the mill which is expected to result in higher production rates and lower operating costs for a full scale operation at Browns Range. “It’s also pleasing to see the initial ore sorting tests the Banshee ore showing promise which, if shown to be effective in future tests, has potential to significantly increase the Browns Range Mineral Resource Estimate. “Being able to test and operate the ore sorting circuit in conjunction with the pilot beneficiation plant is providing extremely valuable data that you just can’t get from small bench scale tests and this will feed into our feasibility study for a potential commercial scale heavy rare earth operation at Browns Range”. The ore sorter system was constructed during 2020 and 2021 and commissioned in June 2021.The sorter that was installed is a 2m wide Steinert sorter that uses X-ray Transmission (XRT) and laser detectors to identify rare earth mineralisation. The sorter has been run over two test campaigns which included 41 test runs processing 5,300 tonnes of ore from the ROM stockpiles largely coming from Wolverine ore, and 5 test runs on Banshee ore that was bulk sampled from a surface costean that provided 285 tonnes of Banshee ore.
The technical information in this news release has been prepared in accordance with the Canadian regulatory requirements set out in National Instrument 43-101 and reviewed and approved by Richard Kusmirski, P.Geo., M.Sc., Skyharbour’s Head Technical Advisor and a Director, as well as a Qualified Person.
About Skyharbour Resources Ltd.:
Skyharbour holds an extensive portfolio of uranium exploration projects in Canada's Athabasca Basin and is well positioned to benefit from improving uranium market fundamentals with six drill-ready projects covering over 240,000 hectares of land. Skyharbour has acquired from Denison Mines, a large strategic shareholder of the Company, a 100% interest in the Moore Uranium Project which is located 15 kilometres east of Denison's Wheeler River project and 39 kilometres south of Cameco's McArthur River uranium mine. Moore is an advanced stage uranium exploration property with high grade uranium mineralization at the Maverick Zone that returned drill results of up to 6.0% U3O8 over 5.9 metres including 20.8% U3O8 over 1.5 metres at a vertical depth of 265 metres. The Company is actively advancing the project through drill programs.
Skyharbour has a joint-venture with industry-leader Orano Canada Inc. at the Preston Project whereby Orano has earned a 51% interest in the project through exploration expenditures and cash payments. Skyharbour now owns a 24.5% interest in the Project. Skyharbour also has a joint-venture with Azincourt Energy at the East Preston Project whereby Azincourt has earned a 70% interest in the project through exploration expenditures, cash payments and share issuance. Skyharbour now owns a 15% interest in the Project. Preston and East Preston are large, geologically prospective properties proximal to Fission Uranium's Triple R deposit as well as NexGen Energy's Arrow deposit.
The Company also owns a 100% interest in the South Falcon Uranium Project on the eastern perimeter of the Basin, which contains a NI 43-101 inferred resource totaling 7.0 million pounds of U3O8 at 0.03% and 5.3 million pounds of ThO2 at 0.023%. Skyharbour has signed a Definitive Agreement with ASX-listed Valor Resources on the Hooke Lake (previously North Falcon Point) Uranium Project whereby Valor can earn-in 80% of the project through $3,500,000 in total exploration expenditures, $475,000 in total cash payments over three years and an initial share issuance.
Skyharbour's goal is to maximize shareholder value through new mineral discoveries, committed long-term partnerships, and the advancement of exploration projects in geopolitically favourable jurisdictions.
Three holes ML21-06, -10 and -11 were drilled as a follow up to historic drilling in the Esker Target area located approx. five kilometres NE of the Main Maverick Zone where anomalous uranium geochemistry was intersected in historical holes MT-04 and MT-10 drilled in the 1980’s. Hole ML21-06 was lost prior to intersecting the target and the unconformity. Hole ML21-10 and -11 intersected significant graphitic conductors associated with faulting and pelitic rocks. The final geochemical assay results will be reported once received and fully evaluated.
Uranium Market Commentary and Update:
The uranium market has recently shown notable signs of recovery with increasing uranium prices and improving sentiment, and this recovery appears to be accelerating amid recent news and several sector-specific developments. Analysts that cover the sector have stated that this could be a sustained upswing as they are currently seeing some of the best fundamentals since pre-Fukushima which should be supportive of higher uranium prices as a major supply-side response is playing out while the sticky demand-side continues to improve. Primary mine supply has been declining and amounted to approx. 125 million lbs U3O8 in 2020 while demand continues to rise and amounted to over 180 million lbs in 2020. The spot uranium price has risen to approx. $40 / lb U3O8 but it is still below the price needed to incentivize new development to ensure sustainable and secure supply to meet growing global demand. More recently, financial entities like the Sprott Physical Uranium Trust have been purchasing millions of pounds of uranium providing upward pressure on the price.
There are 443 operable nuclear reactors and 51 new reactors under construction globally with hundreds more planned in the pipeline. China and India continue to be at the forefront of demand growth and have the largest reactor pipelines making up a significant portion of the global growth. More recently, an important emerging market for nuclear and uranium demand in small modular reactors has gained notable positive press and momentum. As the global push for decreasing carbon emissions continues, nuclear energy will play a vital role in providing base-load, carbon emissions-free, low-cost electricity generation.
On the supply-side, mine closures and production curtailment continue to dominate headlines which was exacerbated by the pandemic clearly illustrating the risks to global primary mine supply. Major production cuts and depleting mine reserves appear to be working their way into the uranium market and driving prices higher. The two largest producers, Cameco and Kazatomprom, have announced large supply cuts over the last several years and have been actively buying uranium directly in the spot market to fulfill their contract deliveries as their production profiles have decreased.
Moore Uranium Project Overview:
In June 2016, Skyharbour secured an option to acquire Denison Mine's Moore Uranium Project, on the southeastern side of the Athabasca Basin, in northern Saskatchewan and has fulfilled its earn in. The project consists of 12 contiguous claims totalling 35,705 hectares located 42 kilometres northeast of the Key Lake mill, approx. 15 kilometres east of Denison’s Wheeler River project, and 39 kilometres south of Cameco’s McArthur River uranium mine. Unconformity style uranium mineralization was discovered on the Moore Project at the Maverick Zone in April 2001. Historical drill highlights include 4.03% eU3O8 over 10 metres including 20% eU3O8over 1.4 metres, and in 2017, Skyharbour announced drill results including 6.0% U3O8 over 5.9 metres including 20.8% U3O8 over 1.5 metres at a vertical depth of 265 metres. In addition to the Maverick Zone, the project hosts other mineralized targets with strong discovery potential which the Company plans to test with future drill programs. The project is fully accessible via winter and ice roads which simplifies logistics and lowers costs. Large proportions of the property are accessible in the summer as well.
Drill hole ML21-01 was drilled just west of hole ML20-12 which had intersected 0.28% U3O8 over 17.9 metres in the winter of 2020. Hole ML21-01 intersected a broad interval of uranium mineralization returning 0.07% U3O8, beginning at 268.8 metres and extending 18.2 metres to encompass both sandstone and basement lithologies. This hole migrated well into the footwall and intersected structurally disrupted and clay altered to replaced sandstone and granite, along with uranium mineralization. The hole did return a typical footwall geochemical signature, with intense boron enrichment (up to 8,060 ppm) in the sandstone as well as elevated uranium, nickel and other pathfinders in the sandstone and basement.
Hole ML20-02 was drilled to test for continuity of the uranium mineralization within the central portion of the Maverick East Zone. The mineralized intercept in ML21-02 occurs in a broad zone that returned 0.19% U3O8 over an 11.7 metre interval from 271.8 to 283.5 metres downhole. This mineralization straddles the unconformity with approximately two thirds of the interval within basement rocks comprised of sheared, clay-altered to -replaced felsic intrusives. This hole once again intersected the main Maverick Fault towards the footwall side and the geochemistry is indicative of that with highly anomalous boron within the basement and the sandstone. The intercept confirms continuity within the central portion of the Maverick East Zone.
Drill hole ML21-03 was drilled to test for continuity of the mineralization within the eastern half of the Maverick East Zone, ten metres northeast of hole ML20-09 which returned 0.72% U3O8 over 17.5m. Hole ML21-03 intersected one of the highest grade intercepts to date on the Maverick East Zone including the highest grades discovered to date in the basement rocks at the zone. The hole returned 2.54% U3O8 over 6.0 metres from 276.0 to 282.0 metres including 6.80% U3O8 over 2.0 metres from 278.5 to 280.5 metres. This mineralization is predominantly basement-hosted and accompanied by intense clay alteration of pelitic assemblages below the unconformity as well as up to 0.83% Cu and 0.73% Ni in half metre sample intervals. This high grade zone of mineralization is open down plunge.
Drill holes ML21-04 and ML21-05 were collared to test for continuity between holes ML20-04 and -13. Hole ML21-04 was lost just above the target and the unconformity in the Maverick Fault at 238 metres. ML21-05 successfully tested the unconformity, but did not intersect significant uranium mineralization. The basement lithologies in this hole are typically intrusive in character within clay-altered to -replaced granites throughout. The sandstone is enriched in pathfinder elements, primarily boron, as is typical of footwall holes along the Maverick Fault.
Holes ML21-12 and -13 were drilled as follow up holes within the eastern end of the Maverick East Zone. Both holes were completed to depth and intersected the expected prospective faulting and geology that has been identified in the Maverick East to date. Final geochemical assay results are pending and will be reported on once received and correlated with the noted geological features.
Grid 19 Zone Drilling:
Three holes ML21-07 to -09 were drilled on the newly emplaced Grid 19 Target area located approx. ten kilometres NE of Main Maverick Zone, where two sub-parallel north trending conductors were identified by the winter SML-EM program. Holes ML21-07 and -09 were drilled along strike, 400 metres apart on the westernmost of these conductors. These holes intersected significant graphitic conductors and sulphides, basement faults, and in the case of hole ML21-07, anomalous radioactivity. Hole ML21-08 also intersected prospective basement geology. The unconformity in the Grid 19 Target area occurs at a shallow depth of approximately 190 metres. The final geochemical assay results are pending for these holes and will be reported once received and fully evaluated.
Skyharbour Intersects High Grade Uranium Mineralization at Maverick East Zone with Drill Results of 2.54% U3O8 over 6.0m including 6.80% U3O8 over 2.0m; Additional Assays Pendingand Drilling to Continue
Vancouver, BC - Skyharbour Resources Ltd.(TSX-V: SYH)(OTCQB: SYHBF) (Frankfurt:SC1P) (the “Company”) is pleased to announce the initial set of diamond drill results from its 2021 summer diamond drilling program at its 100% owned, 35,705 hectare Moore Uranium Project, located approximately 15 kilometres east of Denison Mine’s Wheeler River project and proximal to regional infrastructure for Cameco’s Key Lake and McArthur River operations in the Athabasca Basin, Saskatchewan. Drillhole ML21-03 intersected additional high grade, basement hosted uranium mineralization at the Maverick East Zone. This hole returned 2.54% U3O8 over 6.0 metres including 6.80% U3O8 over 2.0 metres. Furthermore, drilling on the regional Grid 19 target identified several prospective geological features that are indicative of uranium mineralizing systems.
Hole ML21-03 was drilled within the eastern half of the Maverick East Zone. This hole intersected predominantly basement-hosted uranium mineralization and returned 2.54% U3O8 over 6.0 metres from 276.0 to 282.0 metres, including 6.8.0% U3O8 over 2.0 metres from 278.5 to 280.5 metres. The uranium mineralization is accompanied by intense clay alteration of pelitic assemblages below the unconformity as well as up to 0.83% Cu and 0.73% Ni in half metre sample intervals.
The mineralized intercept in hole ML21-02 occurs in a broad zone that returned 0.19% U3O8 over an 11.7 metre interval from 271.8 to 283.5 metres downhole. This mineralization straddles the unconformity, with most of the interval within basement rocks comprised of sheared, clay-altered to -replaced felsic intrusives. The intercept confirms continuity within the central portion of the Maverick East Zone.
Substantial portions of the 4.7 kilometre long Maverick corridor remain to be systematically drill tested leaving robust discovery potential along strike as well as at depth in the basement rocks.
Drill holes ML21-07, -08 and -09 were the first holes drilled within the regional Grid 19 target area, where two prospective EM conductors were identified by this winter’s SML-EM geophysical program. All three holes intersected highly prospective altered, graphitic and sulphide bearing basement lithologies. The pending geochemical results will further define the prospectivity of this area for winter follow-up when frozen conditions will facilitate additional drilling.
Final assay results are pending for seven more drill holes.
Additional drilling of 1,500 to 2,000 metres in four to five holes has commenced at Moore.
Jordan Trimble, President and CEO of Skyharbour Resources, stated: “We are thrilled with the first batch of drill results announced herein highlighted by drill hole ML21-03 which returned the best intercept to date in the basement rocks at the Maverick East Zone. Our geological team is continuing to explore for higher grade uranium mineralization along strike and down plunge at this zone with an expanded drill program. We are successfully increasing the size of the high grade zones at the Maverick corridor and these results illustrate the notable discovery upside potential at the Project especially in the basement rock feeder-zones which have had limited drill-testing historically. Furthermore, there is good progress being made at regional targets at Moore and we intend to follow up on other high-priority targets throughout the Project. The remaining assay results from the drill program are pending which will provide additional news flow in the months to come amidst a significant resurgence in the uranium market.”
Summary of 2021 Drilling Program to Date:
Drilling to date in 2021 on the Moore Project has totalled 4,578 metres in thirteen holes. Seven holes (ML21-01 to -05 and ML21-12 and -13) were drilled on the Maverick East Zone, three on the Esker Target (ML21-06, -10, -11) and three on the Grid 19 Target conductors (ML21-07 to -09). Complete results for holes ML21-01 to -05 have been received and reported herein, while samples for the latter seven holes have been delivered to the SRC Geoanalytical Laboratories in Saskatoon. After a short break in the drill program, field crews have remobilized to Moore and an anticipated 1,500 to 2,000 metres in four to five holes are yet to be drilled. This expanded drill program will test targets identified by prior modelling down plunge of the Maverick East zone, an untested gap between the Main Maverick and the Maverick East Zones as well as targets at the west end of the Main Maverick Zone where the geochemistry (pathfinders) and geology are strongly indicative of a potentially uraniferous mineralizing system.
.... gut auskennen würde ich nicht sagen. Ich nehme nur viele Infos auf und mach mir darüber meine Gedanken. Da ich sehr viele Aktien habe, mache ich nicht immer eine tiefgehende DD und entscheide vieles auch aus dem Bauch raus. soviel vorweg!
Es ist teilweise sehr schwierig Infos zu finden, welche Aktienstückzahlen damals 2007 die Unternehmen hatten. Teilweise gab es die Unternehmen gar nicht oder haben sich umbenannt. Ist eine Sisyphusarbeit....
Hohes Potential sehe ich bzw. mein Schwergewichte (Kazatomprom ausgenommen (ist größter Urani)) sind derzeit:
Blue Sky Uranium (standen mal bei 131 CAD-$ -derzeit 0,32, 175 Mio Stücke, MC 57 Mio CAD-$) ist mein Favorit Azincourt Vimy Energy Fuels Vanadian Energy (Maximalzock ! CAVE!!!) Denison A-Cap Energy Elevate 8 Fission
LG Mio
Alles anzeigen
Vielen Dank für deinen Einblick @Mio. Ich gehe so ähnlich vor, also mit vielen Infos, aber doch aus dem Bauch heraus entscheiden. Denke mal wenn man keine endlose "Rechenknechterei" betreibt kann man ja auch nicht viel anderes machen?!
Von deinen genannten habe ich nur die 2 Produzenten Kazatomprom und Energy Fuels. Die anderen schau ich mir jetzt mal genauer an und guck ob ich da noch irgendwas machen kann
Sorry, aber wenn man nach 5 Jahren noch Ersatzteile bekommt ist das Glück und alles längerfristige Illusion. Wir leben in der lifecycle-durchkonzipierten Welt von 2020+ und da bin ich schon in Privaten froh um jedes Gerät das die Gewährleistungsdauer übersteht.
So ist es leider. Und wenn das Zeug länger hält ist es wahrscheinlich schon viel älter und es steht "Made in W.Germany" drauf
wie @Blue Horseshoe auch geschrieben hat, die Flut hebt alle Boote (gefällt mir ). Ich denke, wenn sich dieser Bullrun weiter fortsetzt (wovon ich zu 99% überzeugt bin) wird auch Peninsula weiter steigen.Ob die weitere 7000% steigen hängt von vielen Faktoren ab. Was ich immer prüfen würde, ob es Verwässerungen gegeben hat usw. Da die fast alle keine Umsätze in den vergangenen Jahren hatten, mussten viele kapitalverwässernde Massnahmen getroffen werden. Daher haben viele Firmen eine wesentlich höhere Anzahl Aktien als noch zu den Höchstkursen im Bullrun 2004-2007.
Ich denke, dass Peninsula ebenfalls ordentlich steigen wird (bin auch selbst in der Aktie investiert), gehe aber eher von 5-10x aus statt 70x.
Du kennst dich offenbar sehr gut aus, kannst du sagen welche Aktien am wenigsten "verwässert" wurden, bzw. wo du dahingehend größeres Potenzial siehst?
- Simon Ridgeway, President and CEO of Volcanic Gold (TSX.V:VG – OTC:VLMZF) joins us to recap the two most recent news releases each highlighting high grade gold drill results from the La Peña vein on the Holly Project, in Guatemala. Some of the high results include 6.52meters of 16.31g/t Au and 15.55meters at 7.67g/t Au.
We have Simon outline the scale of this zone and how it fits into the bigger picture strategy for the Project. We also have Simon look ahead to the exploration that is ongoing and the upcoming catalysts for the Company.
Dann musst Du sehr jung sein und sehr viel Zeit für sinnlose Dinge verschwenden können. mir geht es mit solchen Poppies eher so, das ich sie schnell loslasse. Die Gründe stehen hier:
Meine Seele hat es eilig ....
Aber genau darum geht es doch! Ich hab es auch Eilig! Und deswegen stört es mich auch nicht mir eine Sekunde ein Bild oder Gif anzugucken, weil ich in der nächsten Sekunde dabei bin links zu öffnen und per "STRG+C" und "STRG+V" alle für mich relevanten Infos kopiere. Worauf kann ich Investment-Entscheidungen sonst treffen? Doch nur auf Zahlen, Daten, Fakten... also will ich davon möglichst viel... Präsentationen, Artikel, News, Dokumente usw... den ganzen shit trage ich in meine Datenbank ein und pflege diese.
Wenn mal jemand was zu einer bestimmten Firma diskutieren möchte -immer gerne... Aber in der Regel kommt da ja bei den meisten Firmen und Foristen eh nicht viel. Aber Egal. Genau deswegen ist jemand wie Popeye so wertvoll, weil er einen mit dem ganzen Zeug zukacken kann (nicht negativ gemeint, weil das alles echt gute Unternehmen sind). Und der Erfolg gibt ihm Recht -ist ja in diversen Foren nachprüfbar. Ich sehe das also ähnlich wie @Boersi, alles was man zunächst mal braucht ist bei Popeyes posts vorhanden.
Nobel Resources Provides Next Phase Diamond Drilling Plan, Algarrobo Copper-Gold Project, Chile and Announces Marketed Offering and Concurrent Non-Brokered Private Placement; David Gower, P.Geo., CEO of Nobel noted: “The work to date has generated very compelling geophysical anomalies with large scale. Particularly, given the context that there is high grade copper mineralization that extends for kilometers in the vicinity of these anomalies. It is unusual in my experience to be doing the basic geological and geophysical surveys in an area with so much evidence of extensive copper mineralization, and located within the Chilean copper belt, one of the most prolific copper producing areas in the world.”; Vernon Arseneau, P.Geo, COO of Nobel stated: “The geophysical surveys have identified high priority targets where large scale magnetic features are directly coincident with IP anomalies comprising chargeability highs and resistivity lows which is the correct response for a mineralized system with large scale potential. We expect to be coring on September 10, 2021. We are mobilizing a track-mounted diamond drill that is capable of traversing the sandy terrain in the dune covered area at the central target”
1. The Central Target: This target is the most prominent feature identified by Nobel’s work on the Project. This large target extends approximately 4 km with an arcuate shape and is approximately 2-2.5 km wide. The target comprises coincident magnetic and IP anomalies and is situated directly in the area where two highly copper mineralized structural trends (The Northeast Trend where copper mineralization is documented over 6 km by artisanal mining and the Gloria Trend in the south) intersect. This target is completely sand-covered and the area has never been explored or prospected by the artisanal miners as a result. Due to the very large scale of this target, drill holes could extend up to 500 meters deep and will require several holes per selected section to test the anomaly. On the IP pseudo sections, the chargeability anomaly appears to form along the contact of what is interpreted to be a barren intrusive body which is similar to the geological setting at the Michilla Mine.
2. The Northeast Target: The NE target occurs close to the area where the majority of artisanal mining has occurred on the Project. High grade copper has been identified in these workings along a distance of approximately 6 km. The target is approximately 2.5 km long and 750 meters wide. The IP has identified what is interpreted to be a sulfide-rich zone at depth below the oxide layer. This would manifest as copper oxides closer to surface.
3. Gloria Target: The anomaly occurs within the Gloria mineralized trend, adjacent to the north, of the area where high grade copper oxide mineralization has been identified in drill holes. This target extends in a NW direction towards the Central Target and is approximately 2 km long 600 meters wide.
4. Southwest Target: This target comprises a strong magnetic and coincident IP anomaly in an area not previously explored. It is a well defined one line anomaly situated on what may be the continuation of the Central target or the Northeast Mineralized Trend.
First Test Minerals to Exclusively Support Suvo’s Development of Trawalla Halloysite Kaolin Deposit ; Commenting on the appointment, Suvo’s Executive Chairman, Robert Martin said “Trawalla is unique and offers Suvo the opportunity to be the first halloysite producer in Australia utilising the existing production infrastructure at Pittong. FTM are global leaders in the industry, and we are grateful to have their 100% support and commitment in helping Suvo develop this asset. The Trawalla deposit was not our focus in the recent acquisition but has quickly become very important as it opens a range of new and exciting markets not only with traditional application but also new energy and LiB related applications. Each of these new applications has the potential to present unlimited global development demands and opportunities, and could fundamentally add more value to our existing operations at Pittong, which is the only hydrous kaolin production facility in Australia”; Frank Hart form First Test Minerals commented, “I am delighted to be working with Robert Martin and the Suvo team, particularly with Eileen Hao, and Dr. Ian Wilson who have been working in the kaolin industry for many years. I look forward to contributing to developments at both Pittong and Trawalla in Victoria and the White Cloud Project in Western Australia, all of which have enormous potential for commercial success in a number of high value applications. An exciting time ahead!”
- Suvo signed an exclusive agreement with First Test Minerals in the United Kingdom, a global leader in the testing and product development of halloysite kaolin deposits
- First Test Minerals to help support the development of Suvo’s Trawalla Halloysite kaolin deposit
- Samples already dispatched to First Test Minerals for preliminary test work
- Initial test work led by FTM will concentrate on physical properties, understanding morphology, rheology of Trawalla Halloysite kaolin, to identify the most suitable process and develop products for both traditional halloysite use and new applications
- Meanwhile, BGRIMM will continue focusing on testing and using Trawalla halloysite kaolin in battery technology development, coatings and nanomaterial engineering to develop nanotubes for hydrogen storage and carbon capture http://www.investi.com.au/api/announcements/suv/989f7f61-de0…