Beiträge von Blue Horseshoe

    https://www.prnewswire.com/new…nix-zone-a-301483266.html



    Denison Announces Intersection of 24.9% eU3O8 over 4.2 metres extending beyond high-grade domain at Phoenix Zone A



    TORONTO, Feb. 16, 2022 /PRNewswire/ - Denison Mines Corp. ("Denison" or the "Company") (TSX: DML) (NYSE American: DNN) is pleased to announce multiple intersections of high-grade uranium mineralization beyond the previously defined extents of the high-grade domain in the Phase 1 area of the Zone A portion of the Phoenix uranium deposit ("Phoenix") at the Company's effective 95%-owned Wheeler River Uranium Project ("Wheeler River" or the "Project") in northern Saskatchewan. View PDF version.
    Three drill holes were completed during the fall of 2021 to follow up the discovery of high-grade uranium mineralization (22.0% eU3O8 over 8.6 metres) in drill hole GWR-045, which was located outside of the previously defined extent of the high-grade domain of Phoenix Zone A (see Denison's news release dated July 29, 2021). All three follow-up holes returned intervals of high-grade uranium mineralization, including massive uraninite mineralization in GWR-049.

    • 24.9% eU3O8 over 4.2 metres in GWR-049: This drill hole was expected to intersect only a narrow interval of high-grade uranium mineralization along the northwestern boundary of the Phoenix Zone A high-grade resource domain, approximately 17 metres to the northeast of GWR-045. The drill hole intersected a thick interval of high-grade unconformity-associated uranium mineralization that, coupled with the results of GWR-045, is expected to expand the volume of the high-grade domain to the northwest outside of the extents of the same in the current resource model (see Figures 1 and 3).


    • 3.6% eU3O8 over 3.5 metres in WR-787: This drill hole was designed to test the extents of the high-grade mineralization discovered in GWR-049, by targeting the unconformity approximately 6 metres north of the mineralization in GWR-049 (see Figures 1 and 3). Mineralization in WR-787 was encountered at the unconformity, and included a mineralized interval grading 15.2% eU3O8 over 0.7 metres.


    • 1.2% eU3O8 over 2.1 metres in WR-784: This drill hole was designed to test the extents of high-grade mineralization discovered by drill hole GWR-045, by targeting the unconformity approximately 6 metres northwest of the mineralized intersection in GWR-045 (see Figures 1 and 2). The drill hole intersected perched uranium mineralization grading 1.2% eU3O8 over 2.1 metres, lying approximately 6.5 metres above the unconformity.

    Andy Yackulic, P. Geo., Denison's Director, Exploration, commented, "The grade and thickness of mineralization in holes GWR-045 and GWR-049 significantly exceeded what was predicted by the Phoenix block model. We believe these results will support an expansion of the volume of the high-grade mineralized domain in Phase 1 area of Zone A. Follow-up drilling encountered additional uranium mineralization that is also expected to be additive to future updates to the resource model for Phoenix Zone A. Of particular interest is the perched mineralization discovered in WR-784, which presents a style of mineralization that has not been previously encountered at Phoenix. As this intersection is located outside the extents of previous drilling at Phoenix, the potential exists to identify additional perched mineralization along the northwest margin of the Deposit."


    bg bh

    Da die USA von harten Sanktionen profitieren, würden diese bei einem Einmarsch Russlands in die Ukraine umgesetzt. Europa und Russland wären die Verlierer.

    die us demokraten brauchen dringend einen "win". es beginnt bereits, das sie(demokratten) die friedlichkeit russlands als "win" durch ihre sanktionspolitik framen.


    siehe das pelosi transskript:
    https://abcnews.go.com/Politic…osi-sen/story?id=82849151


    Zitat von pelosi

    PELOSI: Well, I think we have to be prepared for it. And that is what the president is -- yes, I do believe that he is prepared for an invasion.
    I also understand why the President of Ukraine wants to keep people calm and that he wants his economy not to suffer. But, on the other hand, if we were not threatening the sanctions and the rest, it would guarantee that Putin would invade. Let's hope that diplomacy works.
    It's about diplomacy deterrence. Diplomacy deterrence. And the president’s made it very clear. There's a big price to pay for Russia to go there. So if Russia doesn't invade, it's not that he never intended to. It's just that the sanctions worked.

    bg bh

    auch schon im exoplorerfaden,
    https://www.newsfilecorp.com/release/113689



    K9 Intersects Multiple Wide Zones of Gold Mineralization at Stony Lake Project
    Vancouver, British Columbia--(Newsfile Corp. - February 14, 2022) - K9 Gold Corp. (TSXV: KNC) (OTCQB: WDFCF) (FSE: 5GP) ("K9" or the "Company") is pleased to announce highly significant results from its 2021 drill program on its Stony Lake project in the Exploits Subzone Gold Belt in central Newfoundland. Results have recently been received from drill hole JP21-012, drilled on the Jumper's Pond target.
    Highlights:

    • DDH JP-012 intersected seven intervals of gold mineralization with six of the seven zones occurring over a core interval of 134m.
    • The gold mineralization occurs in a steeply dipping structural zone and includes 2.58 g/t over a 3.1m core interval with a maximum grade of 4.34 g/t over a one-meter core interval.
    • The mineralization is hosted in mafic dykes and variably altered mafic volcanic of the Lawrenceton volcanics.
    • The mineralized intervals are characterized by quartz veins, quartz stockworks associated with quartz-pyrite-arsenopyrite-chalcopyrite mineral association. Pyrite-arsenopyrite concentrations are variable and range up to 10% pyrite and 2% arsenopyrite over restricted core intervals. Chalcopyrite is a minor constituent.
    • The mineralization is characterized by silicification, carbonate, chlorite, sericite alteration.
    • The mineralized intervals exhibit a strong spatial association with an estimated 100m wide, near vertical dipping positive chargeability anomaly that can be traced for a horizontal distance of 3,000m in a northeast-southwest direction.
    • The mineralization intersected in DDH JP-012 correlates with several of the mineralized zone intersected in DDH JP-008.

    bg bh

    K9 Intersects Multiple Wide Zones of Gold Mineralization at Stony Lake Project
    Vancouver, British Columbia--(Newsfile Corp. - February 14, 2022) - K9 Gold Corp. (TSXV: KNC) (OTCQB: WDFCF) (FSE: 5GP) ("K9" or the "Company") is pleased to announce highly significant results from its 2021 drill program on its Stony Lake project in the Exploits Subzone Gold Belt in central Newfoundland. Results have recently been received from drill hole JP21-012, drilled on the Jumper's Pond target.
    Highlights:

    • DDH JP-012 intersected seven intervals of gold mineralization with six of the seven zones occurring over a core interval of 134m.
    • The gold mineralization occurs in a steeply dipping structural zone and includes 2.58 g/t over a 3.1m core interval with a maximum grade of 4.34 g/t over a one-meter core interval.
    • The mineralization is hosted in mafic dykes and variably altered mafic volcanic of the Lawrenceton volcanics.
    • The mineralized intervals are characterized by quartz veins, quartz stockworks associated with quartz-pyrite-arsenopyrite-chalcopyrite mineral association. Pyrite-arsenopyrite concentrations are variable and range up to 10% pyrite and 2% arsenopyrite over restricted core intervals. Chalcopyrite is a minor constituent.
    • The mineralization is characterized by silicification, carbonate, chlorite, sericite alteration.
    • The mineralized intervals exhibit a strong spatial association with an estimated 100m wide, near vertical dipping positive chargeability anomaly that can be traced for a horizontal distance of 3,000m in a northeast-southwest direction.
    • The mineralization intersected in DDH JP-012 correlates with several of the mineralized zone intersected in DDH JP-008.

    The gold mineralization is in brecciated and shear zones within intermediate volcanic flows of the Lawrenceton Formation. The grades encountered in these wide zones are comparable with the reported mineral reserve grades from Marathon Gold's Valentine Lake project. Both Valentine Lake and Stony Lake lie within the Exploits Subzone Gold District, along the Cape Ray/Valentine Lake structural trend.
    Jeff Poloni, CEO of K9 Gold commented, "The chargeability anomaly tested by DDH JP-012 is interpreted to represent a broad hydrothermally altered zone containing six intervals of significant gold mineralization. The combination of the mineral associations, variable alteration, multiple host rocks and extensive strike length of the chargeability anomaly suggests the discovery of at least a 3km long hydrothermal system. K9 is eagerly waiting receipt for the gold analyses from 6 drill holes completed along strike of these mineralized intervals.
    It is extremely encouraging to encounter over 65 meters of gold mineralization through out JP21-012.
    The drill cores from the Jumper's Pond drilling indicate significant post sedimentation re-activation and late-stage introduction of significant concentrations of sulphides and multiple zones of gold mineralization in sheared and brecciated Lawrenceton volcanics immediately south of Sokomon's Moosehead gold deposit. Our exploration efforts have located suitable structural hosts exhibiting several factors that suggest potential for higher grade zones of gold mineralization along the shear zones."
    Jumper's Pond area summary:
    The weighted average grade for the intervals of significant gold mineralization is set out below.
    [Blockierte Grafik: https://orders.newsfilecorp.com/files/3395/113689_k9%20table_550.jpg]


    To view an enhanced version of this table, please visit:
    https://orders.newsfilecorp.co…395/113689_k9%20table.jpg.
    Note: the above core intervals do not represent true thickness. Numbers are rounded.
    Follow-up drilling completed in the vicinity of JP21-012, includes seven holes (JP021-013, 019, 020, 021, 022, 023 and 024) drilled from the same drill pad. Two additional drill holes (JP21-014 and JP21-015) were collared approximately 170 m to the west. These holes were designed to test an interpreted ENE-trending positive chargeability anomaly at a horizontal spacing of 10 to 40 metres, and a vertical spacing of 30 to 40 meters. Analytical results from these holes are pending.
    Each of the drill holes completed to test the strike and dip extension of the multiple zones of shearing/faulting in DDH JP-012, intersected similar features, mineral association and variable intensities of alteration. Clasts are typically subhedral and polymictic, with a bleached alteration halo. These volcanic breccias usually exhibit moderate chlorite alteration throughout the units. Locally chaotic/splayed quartz veinlets resembling hydrothermal breccias are present. Within the volcanic breccias and quartz veins, and along the contacts between the volcanics and quartz veins, pyrite mineralization is commonly disseminated and/or blebby, with local concentrations up to 20%, and is typically associated with lesser amounts of arsenopyrite and stibnite. This could be indicative of late-stage hydrothermal activity.
    A map showing the locations of the Jumper's Pond drill holes can be seen on the Company's website, https://k9goldcorp.com/images/projects/stony_lake_gold/K9Gold_NothernDrillPlan_20211201.jpg.
    Seven of the drill holes for which analytical results have been received, returned multiple, narrow, intervals of low-grade gold mineralization over core intervals ranging from 0.10 to 1.24 g/t gold over core intervals ranging from 0.37m to 3.00m.


    https://www.newsfilecorp.com/release/113689


    bg bh

    https://es.sharecast.com/news/…uranium-ban--7112610.html


    Aura Energy fordert Schweden auf, das Uranverbot aufzuheben


    Aura Energy hat Schweden eine schriftliche Notifizierung gemäß dem Vertrag über die Energiecharta vorgelegt, teilte das Unternehmen am Freitag mit.


    Das an der AIM notierte Unternehmen teilte mit, dass Uran in Schweden seit dem 1. August 2018 verboten ist, und erklärte, dass es eine Entschädigung für den finanziellen Verlust aufgrund dieser Entscheidung fordert.


    Aura Energy habe Schweden auf der Grundlage des Vertrages schriftlich von seiner Forderung in Kenntnis gesetzt.


    Der Vertrag über die Energiecharta ist ein multilateraler Rechtsrahmen zur Förderung der grenzüberschreitenden Zusammenarbeit im Energiesektor, der von 54 Unterzeichnern unterzeichnet wurde, wobei davon ausgegangen wird, dass die Unterzeichner die grundlegenden Rechtsprinzipien einhalten.


    Daher sieht Aura Energy den Vertrag als gleiches Spielfeld mit Regeln, die alle teilnehmenden Regierungen einhalten müssen, um die Risiken im Zusammenhang mit energiebezogenen Investitionen und Handel zu mindern.


    "In dem Aktivierungsschreiben hat Aura Energy Schweden um eine einvernehmliche Lösung gebeten, die gemäß Artikel 26 des Vertrags über die Energiecharta innerhalb von drei Monaten zum Abschluss gebracht werden soll", so der Vorstand des Unternehmens in seiner Erklärung.


    Das Unternehmen sagte, es werde den Markt zu gegebener Zeit informieren.



    Übersetzt mit http://www.DeepL.com/Translator (kostenlose Version)

    hallo @LuckyFriday @Edel Man sorry fürs nochmalige fragen, gibt es schon eine antwort?
    eigentlich kam es mir so vor als würde es heute etwas "gschmeidiger" laden aber
    ich war vorhin leider zu blöd um einen beitrag abzuspeichern und die auto safe funktion hatte auch nicht gegriffen.
    na mal sehen wenn ich zeit habe schreib ich das vllt nochmal(vgl uran/ölmarkt).


    ich denke im übrigen auch, ich wäre nicht der einzige der sich mit einer kleinen spende ans forum engagieren würde, sollte es nötig sein [smilie_denk]


    bg bh

    Je nach Kontenstand darf Goldhut dann mit dem Porsche fahren, oder aber nicht.....
    Es wird alles verknüpft und vernetzt, dann hat das erwählte Volk es endlich geschafft, die Luft zum atmen zu besteuern...

    das hinkt nur insofern, als das @Goldhut in der lage ist co2 credits zu erwerben, oder eben so zu investieren das man diese als bonus erhält(zb. biofuels, öööökostrom, aufforstung).


    nicht vergessen, in soziallistischen systemen gibt es keine gleichheit oder wie orwell es in "animal farm" titulierte -
    alle sind gleich, nur einige sind gleicher ["all animals are equal! - some are even more equal!"]


    bg bh

    die situation im uranmarkt ist eine etwas andere als im ölmarkt.


    1. restart dauer, was meinst du wie lange es dauert bis mcarthur river wieder auf 100% produktionsauslastung kommen kann - dies ist nicht innerhalb eines jahres möglich - selbst wenn sie wollten.
    2. sie müssen restarten, zumindest partiell da:
    a. neue contracs abgeschlossen wurden und diese nicht aus dem spotmarkt bedienbar sind
    b. bestehenden contracts nicht mehr aus dem SPOTMARKT zu bedienen sein werden.
    3. der gap zwischen demand(auch zukünftigem) und supply, ist im uranmarkt nicht mit dem ölmarkt zu vergleichen.


    sie können ja nicht einfach force majeure(auf die contracts) geltend machen, weil sie minen auf c&m haben.

    Klingt nett, so ähnlich wie grad die Opec mit Öl sparsam und diszipliniert die Preise durch Mangelangebot hochtreibt...

    beschäftige dich doch mal mit dem markt, wenn du das getan hättest, würdest du wissen das eine wiederproduktionsaufnahme erst verkündet wird, sobald genug neue long term contracts eingegangen wurden.


    bg bh

    verblüfft mich ein wenig das es im forum noch nicht geschrieben wurde,


    restart von mcarthur river



    Cameco restarts Canadian uranium operation
    09 February 2022




    Cameco has announced plans to restart uranium production at McArthur River/Key Lake, idled since 2018. The company plans to ramp up production at the operation in northern Saskatchewan to produce 15 million pounds U3O8 (5770 tU) per year starting in 2024, but aims to maintain "supply discipline", reducing production at Cigar Lake to 25% below its licensed capacity.


    "We see a market where fundamentals are shifting in our favour," Cameco President and CEO Tim Gitzel told investors in the company's conference call. Cameco's planned and unplanned production cuts, inventory reduction and market purchases, have since 2016 removed more than 190 million pounds U3O8 from the spot market, he said. The company has added 70 million pounds of long-term contracts to its portfolio since the start of 2021.
    Coupled with increasing recognition around the world that nuclear energy will play a key role in achieving decarbonisation goals, it is easy to conclude that the uranium demand output is "durable and bright", he said.
    "However, the uranium supply-side story paints a much different picture," he said. Persistently low prices have led to planned production curtailments at existing capacity, increased investment risk for new capacity, and the end of life of some mines. Secondary uranium supplies have in past filled market gaps, but such capacity is now declining significantly. This is further amplified by unplanned supply chain disruptions caused by the COVID-19 pandemic, global supply chain and economic challenges, while increased interest by investors sequestering large amounts of material has contributed to further thinning of the spot market. Increased interest in long-term contracting is emerging: Cameco has added some 70 million pounds of long-term contracts to its portfolio since the start of 2021, Gitzel noted.
    "It is time for Cameco to proceed with the next phase of our supply discipline decisions," Gitzel told investors, operating McArthur River/Key Lake and Cigar Lake operating at less than licensed capacity starting in 2024. "We are taking a portfolio approach to our supply discipline. In 2021, we were operating at about 75% below productive capacity (100% basis), which came at a significant cost to our business. By 2024, we plan to be operating at about 40% below productive capacity (100% basis). This will remain our production plan until we see further improvements in the uranium market and have made further progress in securing the appropriate homes for our unencumbered, in-ground inventory under long-term contracts, once again demonstrating that we are a responsible supplier of uranium fuel," Gitzel said.
    "Starting in 2024, it is our plan to produce 15 million pounds per year (100% basis) at McArthur River/Key Lake, 40% below the annual licensed capacity of the operation. At that time, we plan to reduce production at Cigar Lake to 13.5 million pounds per year (100% basis), 25% below its annual licensed capacity, for a combined reduction of 33% of licensed capacity at the two operations. In addition, we plan to keep our tier-two assets on care and maintenance, and production at Inkai will continue to follow the 20% reduction until the end of 2023 unless Kazatomprom further extends its supply reductions."
    It will take some time to transition McArthur River/Key Lake from care-and-maintenance, Gitzel said. However, the operation could produce up to 5 million pounds U3O8 this year, depending on the completion of operational readiness activities including automation, digitisation and other projects, maintenance work and recruitment and training, and managing the potential risks from the pandemic and related supply chain challenges. Cameco will continue to meet sales commitments from a combination of its lower-cost production inventory and purchases, he added.
    The company expects Cigar Lake production to be 15 million pounds U3O8 in 2022 (on a 100% basis).
    McArthur River/Key Lake is described by Cameco as the world's largest high-grade uranium operation. Ore from underground mining operations at McArthur River is trucked 80 km south to be milled at Key Lake. Mining operations at Key Lake ended in 2002. Cameco is the majority owner and operator of McArthur River (69.8%) and the Key Lake mill (Cameco 83%), with Orano Canada owning 30.2% of McArthur River and 16.7% of Key Lake.
    Nicolas Maes, CEO of Orano Mining, said the company is "fully confident" in Cameco's ability bring McArthur River/Key Lake into production on schedule. "Given the continued unbalanced uranium market conditions, the restart of McArthur gives us the opportunity to reduce production at Cigar Lake, extending the life of this asset and postponing the need for new projects in northern Saskatchewan," he said.
    Orano Canada President and CEO Jim Corman said he was "optimistic" about the longevity of the Saskatchewan's uranium industry. "Following on the heels of our approval to expand the tailings management facility at McClean Lake, we now have a solid plan for uninterrupted production," he said.


    bg bh

    https://d2ysp6t8sg26jc.cloudfr…fa4eeab860d4e29411fb.html


    Tiris Uranium Resource Enhancement Programme



    KEY POINTS:
    · The Company will commence a regional exploration and Resource Enhancement Programme at the Tiris Uranium Project during the first half of 2022 with a focus on:
    o Resource Upgrade - Targeting expansion of the Measured / Indicated Resources base within the Tiris East project area.
    o Completion of a proposed Resource Estimate for vanadium to produce a JORC compliant resource statement for vanadium (V2O5) contained within the Tiris uranium resource.
    · The Resource Enhancement Programme aims to build further shareholder value as the Company continues to advance towards low emission uranium production at Tiris.
    Aura Energy Limited (ASX:AEE, AIM:AURA) ("Aura", the "Company") a company focused on the development of the low capex, low operating cost Tiris Uranium Project ("Tiris", or the "Project") in Mauritania, is pleased to announce that the Company will commence programme of regional exploration with a focus on resource enhancement at Tiris during the first half of the 2022 calendar year.
    Commenting on the Resource Enhancement Program, acting CEO, Dr Will Goodall said: "We are excited to announce the proposed Resource Enhancement Programme, seeking to expand the Tiris uranium resources whilst concurrently progressing towards uranium production. We will focus on expanding the existing Measured and Indicated Resources and locate additional exploration targets that have been underexplored.
    We look forward to commencing the programme as soon as the necessary approvals are in place, as we continue to advance towards low emission uranium production at Tiris."
    Resource Upgrade Programme
    The Resource Upgrade Programme aims to expand the Measured / Indicated Resource base within the Tiris East project area.
    A drilling programme will focus on portions of the current Inferred Resource within the catchment area of the proposed plant site at Tiris East, to reduce drillhole spacing sufficiently to upgrade the classification of the Resource to Measured/Indicated status. Aura will cover the Tiris West resources in a separate future program. Figure 1 shows the substantial areas of Inferred Resource in which closer spaced drilling will be conducted to enable upgrading of the resource classification to a higher category. The previous resource drilling programme in 2017 focused on converting sufficient Inferred Resource to Measured and Indicated status to support the Tiris Definitive Feasibility Study, with the areas omitted from the 2017 program reasonably anticipated to be upgraded following similar drilling in the new programme.
    Aura is currently liaising with drilling contractors aiming to complete the programme by mid-year 2022.

    https://app.sharelinktechnolog…949c2e31835ae90c62e24a776


    IperionX Limited (formerly ‘Hyperion Metals Limited’) (ASX: HYM) (“IperionX” or “Company”) advises that a
    General Meeting of Shareholders was held today, 9 February 2022, at 10.00am (AWST).
    The resolution voted on was in accordance with the Notice of General Meeting previously advised to the Australian
    Securities Exchange (“ASX”).
    The resolution was decided on and carried by way of a poll.
    In accordance with Section 251AA of the Corporations Act 2001 and ASX Listing Rule 3.13.2, the details of the poll
    and the proxies received in respect of the resolution are set out in the attached summary.
    Change of Name
    Following shareholder approval at the General Meeting held today, the Company’s name has been changed to
    ‘IperionX Limited’.
    A certificate of change of company name from the Australian Securities and Investment Commission (“ASIC”) is
    attached.
    The ASX code for the Company will change to “IPX” in due course


    @Edel Man wäre es dir möglich den thread titel entsprechend anzupassen? danke!


    bg bh

    Osisko hangelt sich weiter die Fahnenstange hoch. Ich habe die Gelegenheit zum Verkauf für 4,865 C$ genutzt.


    Die gibts vermutlich nochmal billiger. Anlass waren die Insiderverkäufe.

    die insiderverkäufe waren doch großteils nur trades... der verkauf von aktien für optionen? muss ich nochmal einen blick in die sedar filings werfen.


    ich habe allerdings nach 400% diesmal auch einen freiläufer generiert.


    news von heute
    https://ceo.ca/@nasdaq/osisko-…ng-outlines-lynx-600-bulk


    Osisko Infill Drilling Outlines Lynx 600 Bulk


    5000 tonnes Averaging 36.7 g/t Au (Capped Grade)


    350% Higher Than 2022 MRE M&I Resource Average Grade


    TORONTO, Feb. 08, 2022 (GLOBE NEWSWIRE) -- Osisko Mining Inc. (OSK:TSX "Osisko" or the "Corporation") is pleased to provide an update from the ongoing exploration program at its 100% owned Windfall gold project located in the Abitibi greenstone belt, Urban Township, Eeyou Istchee James Bay, Québec.


    New analytical results from 12.5 metre infill drilling targeting the Lynx 600 level bulk sample (the “Triple Lynx” bulk sample) area are presented below. The infill program was completed in support of a revised block model for the sample, predicting approximately 5,000 tonnes with an average capped grade of 36.7 g/t Au in the planned sample area. This capped grade is 350% higher than the average grade of the recently published Windfall mineral resource estimate (“MRE”) (see Osisko news release dated January 10, 2022) measured and indicated average grade of 10.5 g/t Au and demonstrates the potential for areas of the deposit to host a significant number of additional ounces.


    The infill intercepts are located inside defined January 2022 MRE blocks but were not included in the MRE (as they were received subsequent to the closure of the data base). Results include 25 intercepts in 22 drill holes (1 from surface, 21 from underground) and 3 wedges.


    Chief Executive Officer John Burzynski commented: “We are highly encouraged with these initial results from the planned Lynx 600 bulk sample area. We expect to extract the sample in the coming month, and to process it during the second quarter. These infill results continue to follow a general trend we have seen at Windfall, where detailed work in high-grade areas results in excellent and often positive confirmation of the high-grade zones. Our expectation is that we may again see a positive reconciliation once the sample is processed, based on the results of the first two Windfall bulk samples which returned 126% and 189% positive reconciliations (see respective Osisko news releases dated December 18, 2018 and December 11, 2019.)”


    The bulk sample is situated in wireframe 3161 of the January 2022 MRE. The revised block model (informed by the 12.5 metre spaced infill drill program) used the same parameters as the January 2022 MRE, including the same capping methods. The revised block model predicts 4,977 tonnes averaging 36.7 g/t Au and estimates 5,872 ounces of gold from the sample area.


    The planned sample is located 600 metres below surface (level 0600). Access is planned via levels 0580 and 0600 which are accessible from the exploration ramp. Mining will begin with 65 metres of longitudinal development (4 metres high x 4 to 6 metres wide) along the mineralized corridor on each level. The 20 metre high long-hole stope (floor to floor) between levels is estimated to be 12.5 metres long x 6.5 metres wide. The proposed volume of approximately 4,977 tonnes to be mined includes the stope and the corresponding undercut segment of 12.5 metres of conventional development from level 0600.


    Mineralization in the sample area is characterized by a two to seven metre wide zone of alteration with trace to 10% pyrite stingers, sericite and silica +/- fuchsite, which crosscuts gabbro and felsic dykes. Grey quartz veins with pyrite veinlets, trace sphalerite and local visible gold are associated with high-grade areas.


    vollständig unter obigem link
    bg bh

    https://www.prnewswire.com/new…marban-pit-301477380.html


    O3 Mining Reports Positive Metallurgical Results from Marban Engineering; 96% Gold Recoveries at Marban Pit


    Highlights From the Cyanidation Test Work

    • Overall gold extraction at Marban Pit South of 96.7%; Marban Pit North of 95.8%; Norlartic Pit of 91.2%; versus Preliminary Economic Assessment ("PEA") overall gold extraction of 93.7%
    • Enhanced Gravity Recovery Gold testing resulted in 61%-65% recovery of gold
    • Recovery of gold achieved after 24 hours of leach time; versus PEA 28 hours
    • Average Bond ball mill work index at 13.2 kWh/t.

    sprott:
    https://sprott.com/media/4846/220201-scp-oiii-drilling.pdf


    REC. (unc): BUY TARGET (unc): C$5.95/sh RISK RATING (unc): HIGH


    2021 exploration drilling now complete at Marban ahead of 1Q22 MRE; 12.7m @ 4.2g/t
    O3 reported results from 12 holes (2 Marban / 10 Norlartic) with highlights from infill drilling at Marban
    12.7m @ 4.2g/t Au (incl. 1.8 @ 25.0g/t) from 262m and Norlartic 51.6m @ 2.0g/t from 47m. Additional
    drilling 30m east of Norlartic PEA pit shell hit 40.7m @ 2.9g/t from 91m and 31.8m @ 1.5g/t from 139m
    in a single hole. 2021 infill drilling is now complete at Marban, with updated MRE expected in 1Q22.
    Alongside greenfield exploration at Marban, the 2022 focus will shift towards advancing engineering
    studies ahead of the 3Q22 PFS.
    Why we like O3
     Large holding on global top-three Archean belt straddling the Cadillac Break around Val d’Or
     Existing ‘base load’ 2.5Moz resource / 1.8Moz inventory / 134koz pa Y1-10 scenario at Marban
     27% ownership of 8.4Moz Moneta where Garrison provides base-load while Highway lifts grade
     ‘Get it done, fast’ including +150km drill program underway speeds equity ROI
    Catalysts
     1Q22: Results from 2021 drill program
     1Q22: Marban MRE update
     3Q22: Marban PFS
     2022: 73,000m drill program in Alpha-Marban corridor

    Fehler: Verbindung fehlgeschlagen



    Beim Verbinden mit http://www.goldseiten-forum.com trat ein Fehler auf.



    _


    für ein stündliches backup müsste ja nur die db gesichert werden.
    der prozeß eines db dumbs darf auf keinen fall zu ausfallzeiten führen...


    @Edel Man gibt es eventuell eine antwort vom hoster über @David M. Reymann ?


    danke!


    _


    so seit knapp einer halben stunde erreichbarkeitsprobleme, auch über diverse hochkarätige vpn verbindungen - kein unterschied. zwei posts weg(zur oxidation), weder zeit noch lust auf eine wiederholung :evil:


    bg bh