Developer -- die Suche nach Alpha

  • Ich wette GMIN wird eines der besten Erfolgsgeschichten im Junior-Sektor werden!


    Sie sind immer noch ein ungeschliffener Diamant, der kaum Beachtung findet. Das gefällt mir an denen so:


    Kein Marketing-Blabla, sonderm einfach nur saubere Ausführung!

  • Cerrado Gold Announces First Gold Pour at Its Las Calandrias Project in Santa Cruz, Argentina
    https://www.accesswire.com/766…t-in-Santa-Cruz-Argentina

    • First gold poured from the Las Calandrias heap leap project
    • Las Calandrias is now ramping up to full production, expected in Q3 2023
    • MDC (Brazil) Feasibility Study in the final optimization stage

    TORONTO, ON / ACCESSWIRE / July 10, 2023 / Cerrado Gold Inc. [TSX.V:CERT][OTCQX:CRDOF] ("Cerrado" or the "Company") is pleased to announce that it has poured its first gold from its new heap leach gold production project at the Las Calandrias area in Argentina. Mining and stacking operations are at planned capacity, and gold production is expected to steadily increase as the retention period for the stacked ore is reached, allowing the project to reach design capacity during the third quarter of this year.
    Las Calandrias heap leach gold pour


    [Blockierte Grafik: https://www.accesswire.com/users/newswire/images/766370/screenshot%202023-07-09%20192258.png]


    The Company also wishes to report it is in the final stages of completing its Feasibility Study for Serra Alta deposit at the Monte Do Carmo ("MDC") project in Tocantins, Brazil. Together with its consultants, the project team are conducting final optimizations, design trade offs and sequencing of the mine plan and we expect to complete the feasibility shortly.

    "You`ll own nothing - And you`ll be happy" [wef.ch]

  • Neues Interview mit dem GMIN CEO Louis Pierre Gignac.


    Highlights aus dem Inetrview:


    - Wollen in 2-3 Jahren mit 2 bis 3 neues Assets ein Mid-Tier-Produzent mit 500k Unzen/Jahr werden
    - Sehen sich nicht als Übernahmekandidat sondern eher als Übernehmer
    - Keine Dividenden, da der FCF besser in Wachstum geseteckt wird


    Externer Inhalt www.youtube.com
    Inhalte von externen Seiten werden ohne Ihre Zustimmung nicht automatisch geladen und angezeigt.
    Durch die Aktivierung der externen Inhalte erklären Sie sich damit einverstanden, dass personenbezogene Daten an Drittplattformen übermittelt werden. Mehr Informationen dazu haben wir in unserer Datenschutzerklärung zur Verfügung gestellt.

  • RUPICE NORTHWEST DEPOSIT–FINAL ASSAYS FOR MAIDEN RESOURCE ESTIMATE
    HIGHLIGHTS
    •Final assays for inclusion in the Rupice Northwest (‘RNW’) 2023 resource estimate have been received.
    •RNW Lower Zone continued to be extended with high grades persisting e.g., 6.10m @1,735.6g/t AgEq or55.80% ZnEq including 665.6g/t Ag, 14.57% Zn, 9.85% Pb, 3.80g/t Au, 2.64% Cu, <1.0% BaSO4, 0.56% Sb inholeBR-27-23.
    •High grade gold and copper intersections continue to be returned from the RNW Lower Zone with maintained high Zn, Pb, Ag grades including,5.50m at 1,326.9g/t AgEq or 42.66% ZnEq containing 389.8g/t Ag, 10.17% Zn, 9.02% Pb, 4.93g/t Au, 1.73% Cu, <1.0% BaSO4 and 0.08% Sb in hole BR-28-23.
    •Infill drilling of RNW Main Zone successfully maintains equivalent grades and widths in-between originally drilled holes e.g., 23.40m at 767.2g/t AgEq, 24.66% ZnEq including 253.4g/t Ag, 9.60% Zn,5.20% Pb, 0.90g/t Au, 0.43% Cu, 30.3% BaSO4, 0.08% Sb in hole BR-29A-23.
    •Exploration drilling will continue post the release of the 2023 Rupice and RNW resource estimate. Extension of RNW Main and Lower Zones will continue westwards and to the southeast towards Rupice.
    •Focus on Rupice Main returns with the staged relocation of drillrigs from RNW to Rupice to test for near-surface extensions (up-dip) of Rupice as of July.
    •Rupice West regional exploration drilling started in June with positive intersection of Zn rich gossan that corresponds with surface geochemical anomalism and a ground gravity target.
    •Q3 and Q4 2023 is committed to meeting strategic objectives of drill testing the Semizova Ponikva prospect and advanced exploration drilling across the Droskovac historic mining area for extensions of Pb-Zn-Ag mineralisation.
    https://www.investi.com.au/api…ents/adt/d0f8daed-ef9.pdf

    "You`ll own nothing - And you`ll be happy" [wef.ch]

  • Marathon Gold Provides Second Quarter 2023 Construction Report
    https://ceo.ca/@globenewswire/…quarter-2023-construction
    Two full quarters of construction have now been completed at the Project since major mobilization commenced in January 2023. During June 2023, the Project exceeded 500,000 hours of site work completed without a lost time incident. At the end of the second quarter, overall completion at the Project stood at 35%, with engineering at 87%, procurement at 60%, and construction at 15%. The Project remains on track for first gold production in the first quarter of 2025. Currently, 454 Marathon employees and contractors are employed or providing services to the Project, 80% of whom are residents of Newfoundland and Labrador.


    [Blockierte Grafik: https://ml.globenewswire.com/Resource/Download/9bf944a0-4a17-47bf-82f3-b2f158f3d32a]


    [Blockierte Grafik: https://cdn-ceo-ca.s3.amazonaws.com/1icfgpn-Screenshot%202023-07-31%20at%2016.19.01.png]


    [smilie_denk]

    "You`ll own nothing - And you`ll be happy" [wef.ch]

  • [Blockierte Grafik: https://media.licdn.com/dms/im…7t1sJB2N6Hp_QAeSWzX9K0aTE]



    Adriatic Metals PLC (LSE:ADT1, ASX:ADT, OTCQX:ADMLF) has unveiled encouraging results from its ongoing exploration at Rupice Northwest (RNW), part of the Vares project in Bosnia & Herzegovina.


    The westward exploration of RNW has revealed high-grade extensions of silver (Ag), zinc (Zn), lead (Pb), gold (Au), and copper (Cu), surpassing the projections of the July 2023 Rupice Mineral Resource Estimate (MRE).
    Further enhancing the site's potential, structural analyses have identified faulting and folding at RNW's western boundary. This geological development has led to a vertically continuous domain of thickened high-grade mineralisation.
    One of the standout results from the exploration includes a 33.4-metre (m) stretch from RNW's step-out drilling to the west, showing an impressive 1,197 grammes per tonne (g/t) silver equivalent (AgEq) or 38.5% zinc equivalent (ZnEq).
    This segment alone comprises 409g/t Ag, 11.7% Zn, 8.9% Pb, 2.6g/t Au, 1.2% Cu, 9% barium sulphate (BaSO4), and 0.2% antimony (Sb) in the BR-30-23 hole.
    Moreover, the RNW extension of the Main Zone has recorded a 15.2m segment at 1,502g/t AgEq, 48.3% ZnEq. This includes 499g/t Ag, 7.7% Zn, 13.9% Pb, 4.2g/t Au, 2.2% Cu, 24.6% BaSO4, and 0.3% Sb in the BR-36-23 hole. A subsection of this, measuring 9.2m, registered an even higher 2,269g/t AgEq, 73% ZnEq.


    Adriatic Metals has confirmed that exploration at RNW will continue with two diamond drill rigs in operation until the end of September
    https://cdn-api.markitdigital.…35c2d45a094df02a206a39ff4

    "You`ll own nothing - And you`ll be happy" [wef.ch]

  • Habe sie schon ewig im Depot aber die Aktien kommen einfach nicht aus dem Quark ?)

    Tretminen reissen ein Bein ab, Wasserminen versenken Schiffe, Goldminen vernichten viele Anleger. :!:

  • G Mining Ventures Provides Tocantinzinho Project Update on Anniversary of Construction Decision

    VRIFY | Market. Meet. Engage.

    G Mining Ventures is pleased to provide an update on key developments on our 100% owned Tocantinzinho Gold Project. Located in Para State, Brazil, the Tocantinzinho Gold Project is a permitted, construction-ready, open-pittable gold deposit containing 2.0 million ounces of reserve.
    On the one-year anniversary since the Corporation made a formal construction decision (announced on September 12, 2022), the Project is 51% complete and remains on track and on budget for commercial production in H2-2024. Construction is 46% complete, with work initiated on almost all Project areas. In addition, total spend to date is $281 million with open commitments of $82 million for a total committed to date of $363 million (79% of project total) and is tracking in line with the Feasibility Study.

    "You`ll own nothing - And you`ll be happy" [wef.ch]

  • Marathon Gold - Presentation by Matt Manson at Beaver Creeek:

    https://www.gowebcasting.com/e…oration/play/stream/36789

    https://staticcdn1.gowebcastin…ent_00003769_jukBDtvX.pdf


    Mit 52 WT - Teilkauf zu 0,69 C$

    Zukauf zu 0,53 C$.

    Haben wir den Verkaufshöhepunkt gesehen?

    TradingView Chart
    www.tradingview.com

    Marathon Gold: Nearly Mining in Newfoundland
    Over at Motherlodetv.net, I followed Marathon Gold (MOZ.T) for years as it went from an interesting Newfoundland gold exploration play to a full blown…
    jaycurrie.substack.com

    "You`ll own nothing - And you`ll be happy" [wef.ch]

Schriftgröße:  A A A A A