Da könnte was gehen
23. November 2024, 00:31
Da könnte was gehen
Lotan (Insider) kauft bei CBG kräftig zu
Q3 HIGHLIGHTS
Vares Silver Project, Bosnia & Herzegovina:
• Underground development rates increasing significantly. The first ore
drive was reached at the end Q2 and ore is being stockpiled.
• Phased commissioning of the Vares Processing Plant has commenced
and is expected to continue for approximately 8 weeks.
• First concentrate production now anticipated in January 2024 due to
delays in equipment delivery and electricity connection.
• The delay will provide an opportunity for an increased stockpile and
improved grade management in the ramp-up to nameplate capacity.
• The Company remains fully funded to Project completion.
• 24.5km haul road construction and refurbishment of the railhead and
railway line will be completed by mid-November.
• Staff headcount increased to 271, contractor headcount totalled 486 at
the end of Q3.
Nach Sabina verschwindet mit Marathon Gold der nächste interessante Developer von der Kursliste; noch dazu unter Wert
Kommt nicht so gut im Markt an.
Global Atomic Announces Q3 2023 Results, Provides Corporate Update and Re-engagement by Development Banks
𝐓𝐎𝐂𝐀𝐍𝐓𝐈𝐍𝐙𝐈𝐍𝐇𝐎: 𝐂𝐨𝐧𝐬𝐭𝐫𝐮𝐜𝐭𝐢𝐨𝐧 𝐔𝐩𝐝𝐚𝐭𝐞 🚧
G Mining Ventures recently provided an update on key developments on our 100% owned Tocantinzinho Gold Project. Located in Para State, Brazil, the Tocantinzinho Gold Project is a permitted, construction-ready, open- pittable gold deposit containing 2.0 million ounces of reserve.
15 months after the Corporation made a formal construction decision (announced on September 12, 2022), the Project is 64% complete and remains on track and on budget for commercial production in H2- 2024.
Several recent construction progress highlights include:
✔️ Site infrastructure substantially complete. ✔️ The following ancillary facilities have been constructed and commissioned: dorms, permanent kitchen and all related facilities, potable water treatment plant and sewage treatment plant, initial truck shop, warehouse, administration office, mill workshop, mill office, fuel storage, aggregate plant, 13.8kV site distribution lines, reagent storage buildings and assay lab ✔️ The following ancillary facilities are continuing to progress: permanent truck shop ✔️ Process plant construction 18% complete: primary crusher installation complete, and mechanical stabilized earth wall erection initiated. Coarse ore stockpile concrete tunnel construction in progress. SAG mill and ball mill foundations, pedestals sole plate installation complete. CIL tanks assembled and hydro-tested. Detox and process water tanks assembled and hydro-tested. Fusing of tailings and return water pipelines in progress. ✔️ Flotation Tailings Storage Facility construction well advanced: On track for completion in early Q1-24. Main dam recently reached final elevation. Filter installation initiated. Spillway construction and rock fill activity planned for H2-23. ✔️ CIL Tailings Storage Facility construction advanced: On track for completion in early Q4-23. Floor excavation ongoing and underdrains are being installed. Liner materials to be fully installed by end of 2023.
For more information regarding the Tocantinzinho project, please refer to our latest corporate presentation:
Skeena FS Update
Eskay Creek 2023 DFS Highlights:
https://skeenaresources.com/news/skeena-completes-definitive-feasibility-study-for-eskay-creek/
Danke, Sorgenfrei
Diesen Beitrag zu der interessantn Aktie FOM kopiere ich in deren Thread:
Grüsse
Edel
Osino ist ein Developer aus Namibia mit einer relativ hohen Rentabilität und attraktiven Bewertung.
Bisher habe ich mich auf Unternehemen aus den sicheren Ländern Australien und Kanada konzentriert.
Könnte als Ergänzung interessant sein.
WKN: A2NB4J ISIN: CA68828L1004
Aus der September Präsentation
[Blockierte Grafik: https://i.ibb.co/gMGDm4C/Vergleich.png]
[Blockierte Grafik: https://i.ibb.co/PNPLkBM/Osino-Rentabilit-t.png]