Moin moin,
Keegan wurde schon an anderer Stelle besprochen.
Vielleicht kann Edel ja die Beiträge hierher kopieren?
Properties in Ghana/Westafrika und die Cashposition
deckt fast die aktuelle Marktkapitalisierung.
Potentielles Übernahmeziel z.B. von Endeavour Mining
Die haben vor kurzem AVR übernommen und zwei weitere
Übernahmen angekündigt. Die Aktionäre von AVR haben
neue Aktien von EDR bekommen. 1 x AVR gegen 0,365 EDV.
Nun hat EDV wieder den Kursbereich um 2,40 Can $ erreicht,
bei der sie AVR übernommen haben, und KGN ist nach deutlichem
Anstieg kräftig zurückgekommen.
ZitatAlles anzeigenThe Company has engaged DRA Minerals Projects ("DRA") of Johannesburg,
South Africa to investigate a reduced capacity processing plant that
would use an improved process design. Initial work by DRA investigated
the merits of utilizing a flotation process to enhance the project
economics. In a trade-off study, DRA estimated capital and operating
costs for flotation versus whole ore leach processing and determined
that implementing a flotation process would provide a positive
incremental benefit to the project economics and create favourable
environmental advantages as compared to the whole ore leaching process.
Based on the revised preliminary process flow sheet, DRA completed a
conceptual level capital and operating cost estimate for a 4.0 million
tonne per annum ("Mtpa") processing plant. Preliminary capital cost
estimates indicate that the project capital cost could be reduced to
approximately US$260 million excluding mining equipment. Mining
equipment is expected to be provided as part of an agreement with a
mining contractor.
The Company also engaged Minxcon, a South African based mineral resource
consultancy firm to review the mineral resource estimate and mine plan
for opportunities to improve the minable ore grade and/or reduce the
strip ratio during the early years of production. Minxcon concluded
that there is an opportunity to improve the minable ore grade by using
selective mining methods rather than the bulk mining method as proposed
in the September 2011 Pre Feasibility Study ("PFS"). This work also
suggests that Esaase could be selectively mined at higher ore grades
than the bulk mining plan prepared for the PFS.
Minxcon is currently updating a refined block model utilizing existing
data which the Company expects will more precisely delineate the
mineralized zones within the resource area and produce a resource
estimate for selective mine planning. The Company expects to be able to
release the results of the revised resource estimate in the fourth
quarter of 2012.
The Company intends to continue working with DRA, Minxcon and other
technical advisors over the coming months to further de-risk and enhance
the Esaase project. A revised PFS based on a 4.0 Mtpa flotation plant
is now underway and completion is expected in the first quarter of 2013.
A proposed reduction in plant throughput capacity to 4.0 Mtpa from
7.5-9.0 Mtpa is expected to reduce the project capital cost to
approximately $260 million, a significantly lower amount as compared to
the current PFS, resulting in more financing options for the Company.
Keegan has a current cash balance of approximately $188 million.
Zum Minenbau fehlen also noch ca. 80 Mio. $ für eine Produktion von ca.
130.000 Unzen pro Jahr. Wenn 700 $ pro Unze übrig bleiben, sind die
Kosten nach einem Jahr wieder drin.
Edels RVS könnte auch noch ein Übernahmekandidat sein.
Gruß
Vatapitta