First Majestic Silver Corp./ FR,AG (TSX,NYSE)
-
-
-
Artikel von Charles Wyatt, minesite.com, 22. April 2008
If Everything Continues To Go To Plan First Majestic Could Be A Dividend Payer in 2010When Keith Neumeyer, chief executive of First Majestic Silver, was announcing record silver production for the last quarter of 2007, he may have reflected that he’d made a shrewd move leaving First Quantum back in 2000. This is the African-based copper producer, of which he was the original and founding president, and also instrumental in the acquisition of the Bwana Mkubwa mine in Zambia. Since then he has grown First Majestic to the stage where it produced just over a million ounces of silver equivalent (silver plus lead) in the last quarter of 2007, while First Quantum is forced to contemplate its navel as Zambia introduces its new tax regime on mining and the authorities in DRC are review all contracts with the state mining company. On top of this First Quantum has apparently disclosed that it is suing its investment adviser, HSBC Bank over asset-backed commercial paper – the polite term for sub-prime mortgage rubbish - in which it invested US$11.3 million on the advice of the bank in July 2007.
First Majestic has no such problems as it operates in Mexico which is mining friendly and has resisted any temptation to try to boost investment income. The company has three producing silver mines silver mines in Mexico - La Parrilla, San Martin and La Encantada - and has forecast that production from them will rise to 5.5 million ounces this year and that there will be a further significant increase next, and even more in 2010. And just to emphasize the fact that it has no sub-prime junk hanging round its neck the company has just raised C$45 million from a syndicate of brokers led by CIBC World Markets. Most of this money is going to be used to expand the mill capacities at the three producing mines, but some will be used on development work and exploration. It’s no wild guess to assume that these brokers would not have been involved in the fundraising if the company had already wasted some of its funds on poor investments.
The development work just mentioned is continuing at all three mines in order to provide access to new areas, so that mining can keep pace with production as the mill capacities are increased. Thus reserve and resource development are given priority and in January six rigs were working at La Parrilla, three at San Martin and one at La Encantada. More have been added since then, and the total is now seventeen which, Keith says, is the most of any junior to mid-tier company operating in Mexico. It is interesting to note that Blackmont Capital, one of the brokers involved in the recent fund raising, reckons that La Encantada is the jewel in First Majestic’s crown with its resources having recently doubled to 63.7 million ounces of silver. A number of improvements have been made to the mill over the past year which will ensure that recoveries improve.
Keith Neumeyer doesn’t miss many tricks, and he has also been carrying out evaluation and metallurgical testwork on the old tailings dams. The results indicate that a cyanide circuit would enhance the economics of the operation, and that it might be worth increasing throughput to 3,000 tonnes per day compared with the present 700 tonnes per day. Such a change would only cost $12 million and payback would be very quick. In fact Blackmont reckons that if these changes are made production from La Encantada could increase from an estimated 1.7 million ounces of silver this year to 4 million ounces in 2010.
It is a similar story at La Parrilla, where mill enhancements are already starting to pay off. A year ago a new primary and secondary crushing plant was acquired. A new 800 tonnes per day cyanidation/flotation mill was added shortly afterwards. The upgraded mill is now running close to capacity and it can process both oxide and sulphide silver ores in two parallel circuits. This should support an increase in production from 1.56 million ounces of silver this year to 1.91 million ounces in 2009. The mine has plenty of life left in it, even then. The total silver equivalent resource now stands at 74.1 million ounces, but the new tailings dam should add a further ten years to mine life.
All good news and the same goes for San Martin where an improved performance can be expected as a result of underground development and changes that have been undertaken at the mill. When we last wrote about the company we mentioned that it was the Mexican team under chief operating officer Ramon Davila that was key to First Majestic’s performance. Once the decision was taken at the end of last year to add a 500 tonnes per day flotation circuit in order to deal with the large sulphide resource, things moved fast. The components for this circuit were sourced and it was built by the team in two months at a cost of only $1 million. Difficult for anyone to beat that, as most of the steel parts were manufactured at the mine. A third ball mill is now ready for installation, and this should boost throughput from 1,000 to 1,200 tonnes per day next year with production rising to 1.84 million ounces.
Then come the Chalchuites claims which are only 60 kilometres to the southeast of La Parrilla and comprise a contiguous land package containing four previously operated mines - Perseverancia, San Juan, La Esmeralda and Magistral. Exploration at Perseverancia and San Juan has been encouraging and a new resource can be expected to come in in the 20 to 30 million ounce range. Once this is in the bag it looks like onwards and upwards to a single plant handling ore from both mines at a rate sufficient to produce up to two million ounces of silver a year with significant base metal credits.
Keith, speaking from Mexico, says that the only constraints on production for his company are the mills as he confidently expects to be announcing resources of 300 million ounces by the end of this year. Further improvements are therefore being carried out at the mills, and his personal target, not a forecast, is for First Majestic to produce 10 million ounces of silver equivalent in 2010. This would definitely warrant promotion to the mid–tier and justify the move from the Venture Exchange to a full Toronto listing earlier this year. At the back of his mind is the possibility of a dividend payment, but that would have to await confirmation of the earnings level if the production target is reached. Not many investors would be prepared to bet against Keith getting his way on this one.
-
Ist auser mir noch jemand in FR.
Hier die letzten News zu FR.
19.05.2008 13:27IRW-News: First Majestic Silver
http://www.teligo-ads.de/v3/ww…z=300x250;ord=94fc4c8f1f?
[Blockierte Grafik: http://www.teligo-ads.de/v3/www/delivery/lg.php?bannerid=864&campaignid=553&zoneid=6&source=&block=0&capping=0&session_capping=0&loc=http%3A%2F%2Fwww.finanznachrichten.de%2Fnachrichten-2008-05%2Fartikel-10853562.asp&referer=http%3A%2F%2Fwww.finanznachrichten.de%2Fnachrichten-aktien%2Ffirst-majestic-silver.asp&cb=94fc4c8f1f]
IRW-PRESS: First Majestic Silver: First Majestic Silver Corp. (News) : Finanzergebnisse des 1. Quartals: neuer Rekord
First Majestic Silver Corp.: Finanzergebnisse des 1. Quartals: neuer Rekord
FIRST
MAJESTIC SILVER CORP. (FR-T) (das Unternehmen) freut sich, die
ungeprüften Finanzergebnisse des Unternehmens für das erste Quartal
bekannt zu geben, das am 31. März 2008 zu Ende ging. Die vollständige
Version des Finanzberichtes ist auf der Website des Unternehmens unter
http://www.firstmajestic.com oder auf SEDAR unter http://www.sedar.com verfügbar.
Keith
Neumeyer, President und CEO, sagte: 2008 legten wir einen
hervorragenden Start hin. Es gibt jedoch noch einige Herausforderungen
und mehrere Verbesserungen, die entweder bereits im Gange sind oder die
wir noch in diesem Jahr in Angriff nehmen werden. Der aktuelle Stand
einer jeden der drei produzierenden Silberminen des Unternehmens ist im
Moment äußerst viel versprechend. Das erste Quartal war das beste
Quartal in der Geschichte des Unternehmens und zugleich das erste
Quartal, in dem pro Aktie ein Gewinn erzielt wurde.
Highlights des 1. Quartals
Gesamteinnahmen
um 28% gestiegen: $ 12,96 Millionen Einnahmen aus den Minenbetrieben
gestiegen: $ 4,7 Millionen Nettoeinnahmen in diesem Quartal $ 1,0
Million Betriebs-Cashflow im Quartal gestiegen: $ 4,8 Millionen
Gesamtes
Äquivalent Silber im Vergleich zum vorherigen Quartal um 5% gestiegen:
1.061.720 Unzen Gesamte Investitionskosten pro Silberunze in diesem
Quartal: US$ 6,51 Gesamte Bergbaukosten pro Tonne in diesem Quartal:
US$ 45,83 Barbestand am 31. März 2008: $ 52,8 Millionen
-
Investitionskosten und Bergbaukosten pro Tonne sind keine GAAP-Maße -
Finanzinformationen in dieser Pressemitteilung basieren auf den
Canadian GAAP
Zusammenfassung der Finanzergebnisse
Der
Umsatzerlös betrug in diesem Quartal $ 12,96 Millionen eine Steigerung
um 28% im Vergleich zum ersten Quartal 2007 ($ 10,16 Millionen). Die
Einnahmen aus den Minenbetrieben betrugen in diesem Quartal $ 4,7
Millionen; im ersten Quartal 2007 waren es $ 0,4 Millionen. Das
Unternehmen erwirtschaftete in diesem Quartal Einnahmen in Höhe von $
1,5 Millionen; im ersten Quartal 2007 gab es einen betrieblichen
Verlust von $ 1,4 Millionen. Das Unternehmen verzeichnete im ersten
Quartal 2008, das am 31. März zu Ende ging, erstmals einen Nettogewinn:
$ 1.065.323 ($ 0,02 pro Aktie); im ersten Quartal 2007 gab es einen
Nettoverlust von $ 3.061.899. Der Nettoertrag dieses Jahres resultierte
aus einer unbaren aktienbasierten Zahlung von $ 1.108.216.
Das
Unternehmen verfügt über einen Barbestand von etwa $ 53 Millionen,
erzeugt beträchtliche Cashflows aus seinen Betrieben und ist
ausreichend kapitalkräftig, um auch in naher Zukunft die Anforderungen
seiner Betriebe erfüllen zu können, sofern es keine größeren Käufe
tätigt oder größere Kapitalprojekte in Angriff nimmt. In diesem Quartal
betrug die gesamte Produktion 1.061.720 Unzen Silberäquivalent,
einschließlich 895.358 Unzen Silber, 240 Unzen Gold und 1.857.897 Pfund
Blei. In diesem Quartal wurden insgesamt 1.019.490 Unzen
Silberäquivalent verschifft. In diesem Quartal leistete das Unternehmen
auf seinen Mineralgrundstücken Investitionsausgaben in Höhe von $
5.593.433 und weitere $ 3.694.972 für die Anlagen und das Equipment.
Die direkten Investitionskosten betrugen im ersten Quartal, das am 31.
März 2008 zu Ende ging, US$ 6,51 pro Unze Silber bei La Parrilla und La
Encantada gemeinsam durchschnittlich $ 4,38. Die Kosten für die
Inbetriebnahme des neuen Flotationskreislaufs und die geringen Gehalte
des Sulfiderzes, mit dem die Mühle bei San Martin im März gespeist
wurde, führten zu einem Anstieg der konsolidierten Investitionskosten
auf US$ 6,51. Man geht davon aus, dass die Kosten angesichts der im
ersten Quartal bei San Martin durchgeführten Änderungen im zweiten
Quartal ansteigen werden.
Ausblick 2008
Angesichts der
weiterhin steigenden Reserven und Ressourcen des Unternehmens, liegt
der Schwerpunkt des Unternehmens nach wie vor auf der Erweiterung
seiner Mühlen- und Verarbeitungsbetriebe, um den Ertrag zu steigern.
Das Management von First Majestic legt sein Hauptaugenmerk auf die
Fortsetzung der laufenden Verbesserungen bei jedem Betrieb, um die
Produktions- und Ressourcenziele für 2008 zu erreichen. Das Unternehmen
peilt für das Jahr 2008 eine Silberäquivalentproduktion von 5,3
Millionen und eine Steigerung der Silberressourcen gemäß NI 43-101 an.
Der Schwerpunkt des Unternehmens liegt auf der Errichtung von
langfristigen und nachhaltigen Bergbaubetrieben; die Aktionäre können
davon ausgehen, dass das Management von First Majestic ein Wachstum und
profitable Bergbaubetriebe anpeilt.
Zu den bisher im Jahr 2008
durchgeführten Verbesserungen zählen: der Abschluss des
Flotationskreislaufs bei San Martin; das Austauschen des sekundären
Brechers bei La Encantada; und zwei neue Filterpressen bei La Parrilla.
Ein
wichtiger Teil bei der Verbesserung der Bergbaueffizienz und -kosten
sind die 20 Stück Untergrund-Equipment, die für das Jahr 2008 bestellt
wurden; zwölf davon sind bereits eingetroffen. Dieses neue Equipment
beinhaltet Schaufelbagger, Untergrund-LKWs und Jumbos.
Weitere
Verbesserungen befinden sich entweder in der Planungsphase oder sind
für den Rest des Jahres geplant und beinhalten: Mühlenerweiterungspläne
bei La Encantada, die voraussichtlich im zweiten Quartal umgesetzt
werden; ein umfassendes geophysikalisches Programm ist für das
Grundstück La Encantada geplant; Änderungen bei San Martin sind im
Gange, um die Tonnagen zu steigern und die Kosten pro Tonne zu senken;
die Erweiterung der Mühle San Martin befindet sich im frühen
Planungsstadium; das Projekt Chalchihuites wird einem umfassenden
Erschließungsprogramm unterzogen, welches auch Diamantbohrungen
beinhaltet, um im Juli einen Bericht gemäß NI 43-101 veröffentlichen zu
können; auf dem Projekt Cuitaboca wird ein Explorations- und
Erschließungsprogramm während des gesamten Jahres fortgesetzt, um bis
Jahresende einen Bericht gemäß NI 43-101 zu veröffentlichen; im Laufe
des Jahres werden für die Silberminen La Parrilla, La Encantada und San
Martin jeweils aktualisierte Berichte gemäß NI 43-101 veröffentlicht
werden.
Die Erschließung von Reserven und Ressourcen hat für das
Unternehmen weiterhin höchste Priorität. Zurzeit sind 20 Bohrgeräte in
Betrieb: fünf bei La Parrilla und drei bei Chalchihuites, neun bei San
Martin und drei bei La Encantada.
Die Pläne des Unternehmens für 2008 sehen auch Bohrungen auf über 82.000 m und Untergrunderschließungen auf über 46.000 m vor.
First
Majestic ist ein produzierender Silberförderer, der sich auf Mexiko
konzentriert und aggressiv sein Ziel verfolgt, durch Entwicklung seiner
vorhandenen Vermögenswerte und den Erwerb weiterer Projekte, die zu den
Wachstumszielen des Unternehmens passen, zu einem führenden
Silberproduzenten zu werden.
Weitere Informationen erhalten Sie
von info@firstmajestic.com, oder auf unserer Website unter
http://www.firstmajestic.com oder unter unserer gebührenfreien Rufnummer
+1.866.529.2807.
FIRST MAJESTIC SILVER CORP.
unterzeichnet
Keith Neumeyer, President & CEO
Diese
Pressemitteilung enthält bestimmte Prognosen für die Zukunft im Sinne
des Abschnitts 21E des US-Wertpapiergesetzes (US Securities Exchange
Act) von 1934 in der geltenden Fassung. Alle Aussagen, die sich nicht
nur auf Tatsachen der Vergangenheit beziehen, beispielsweise Aussagen
zu potentiellen Mineralisierungen und Reserven, Explorationsergebnissen
und zukünftigen Plänen und Zielen der First Majestic Silver Corp. sind
Prognosen mit verschiedenen Risiken und Unsicherheiten. Es kann nicht
zugesichert werden, dass diese Aussagen exakt sind, und die
tatsächlichen Ergebnisse und zukünftigen Ereignisse könnten wesentlich
von den Erwartungen in diesen Aussagen abweichen.
Für die Richtigkeit der Übersetzung wird keine Haftung übernommen! Bitte englische Originalmeldung beachten!Waren auch nicht die schlechtesten News.
Miner2007
-
-
Meiner einer ist auch noch dabei mit -23%
Aber in letzter Zeit scheint sich ja die Situation zu verbessern. Schaun mer mal.Sieht auch heute wieder gut aus im augenblick 4,94 can$ + 4% = 3,18 Euro.
-
-
-
Gute Zahlen von FR
Z.B. wurden die Cash-Kosten pro Unze weiter gesenkt (La Parilla: 3.61 USD, La Encantada:3.67 USD)First Majestic Silver Corp.: Second Quarter Financial Results
VANCOUVER, BRITISH COLUMBIA--(Marketwire - Aug. 15, 2008 ) - FIRST MAJESTIC SILVER CORP. (the "Company") (TSX:FR)(PINK SHEETS:FRMSF)(FRANKFURT:FMV) (WKN:A0LHKJ) is pleased to announce the unaudited financial results for the Company's second quarter ending June 30, 2008. The full version of the financial statements can be viewed on the Company's web site at http://www.firstmajestic.com or on SEDAR at http://www.sedar.com.
-----------------------------------------------------------------
2nd Quarter Highlights
-----------------------------------------------------------------
Gross Revenue $15,905,718
-----------------------------------------------------------------
Net Revenue $11,436,889
-----------------------------------------------------------------
Mine Operating Earnings $2,180,671
-----------------------------------------------------------------
Cash Cost per ounce US$4.84
-----------------------------------------------------------------
Silver Equivalent Production 1,271,141
-----------------------------------------------------------------
Silver Equivalent Oz. Sold 892,406
-----------------------------------------------------------------FINANCIAL HIGHLIGHTS
- Sales revenues for the quarter (after smelting charges) were $11.4 million; an increase of 6% compared to $10.8 million for the quarter ended June 30, 2007. Gross revenues for the quarter, prior to smelting charges were $15.9 million.
- A marked improvement to direct cash costs per ounce of silver produced during the quarter ended June 30, 2008 was achieved primarily due to the improvements underway at the San Martin Silver Mine which amounted to US$4.84 per ounce compared to the previous quarter ended March 31, 2008 of US$6.51.
- Mine operating earnings for the quarter amounted to $2.2 million, compared to $1.1 million for the quarter ended June 30, 2007.
- Smelting charges for the quarter increased significantly to $4.47 million as a result of a new agreement signed with Penoles. The most impacted mine was the La Encantada as 100% of its production is in the form of concentrates. The present expansion program underway at La Encantada is converting the mill from concentrate production to dore production which will come into effect in early 2009. As a result of higher charges affecting all mining companies in Mexico who sell their concentrates to Penoles, management is reviewing its alternatives to mitigate the smelting charges going forward. The adoption of new technologies which may affect the amounts and qualities of concentrates produced are being investigated as well as establishing new buyers for concentrate production.
- Total quarterly production consisted of 1,271,141 ounces of silver equivalents, including 1,109,821 ounces of silver, 482 ounces of gold, and 1,987,551 pounds of lead. The Company shipped 892,406 payable ounces of silver equivalent in the quarter resulting in an increase of 11% over the 801,324 payable ounces of silver equivalent sold in the quarter ended June 30, 2007. The remaining silver produced in the quarter was in inventory at the end of the period.
- The Company realized a price of US$17.38 (CDN$17.82) per ounce of silver sold in the quarter which is higher than the average trading price of US$17.17 per ounce.
- The Company generated an operating loss of $0.6 million for the quarter, compared to an operating loss of $1.5 million for the quarter ended June 30, 2007.
- The Company generated a net loss of $0.3 million for the quarter ended June 30, 2008, compared to a loss of $0.7 million for the quarter ended June 30, 2007. The net income for this quarter was after deducting a non-cash stock-based compensation expense of $670,616 (2007 - $ 775,532).
- The Company has been extracting ore from the Del Toro Silver Mine (formerly referred to as the Chalchihuites Group of Properties) over the past two quarters. As a result of the material volumes being extracted during this quarter and as is anticipated going forward, Del Toro is now considered to be in the early stage of production. The ore extracted is being shipped, processed and blended at the La Parrilla mill. For the second quarter ending June 30, 2008, 15,261 tonnes were extracted from Del Toro, resulting in production of 117,120 ounces of silver equivalents, and allowing quarterly production to increase at La Parrilla to 72,650 tonnes (95% of capacity). Production and the resulting costs associated with mining activity at Del Toro are included in La Parrilla's costs and operating results.
- The Company currently has more than $46 million in its treasury, is generating significant cash flows from operations, and has sufficient capital to support its operating and current requirements and current expansion plans.
- During the quarter, the Company invested $12,096,777 in capital expenditures on mill expansions, mine development, exploration and equipment throughout its operations and projects.
OPERATIONAL HIGHLIGHTS
The Company continues to focus its efforts on production growth, Resource and Reserve growth and reducing costs in order to improve profitability. Mill expansions are presently underway at each operation with the largest expansion program taking place at the La Encantada Silver Mine. Management is very much focused on executing its business plan by continuing the ongoing improvements at each mine, and achieving production and resource targets going forward. In addition to increasing production and improving profitability, continued increases in NI 43-101 compliant silver Resources is a key goal. As at the latest NI 43-101 Reports, the Company has defined a global Resource of 184 million ounces of Silver equivalents. Twenty two drill rigs are presently focused on further Resource development. Each of the Company's NI 43-101 Reports will be updated by year end and are expected to show substantial increases. The Company's primary focus is to build long term sustainable and profitable mining operations.
La Parrilla Silver Mine
As part of the ongoing improvements at the La Parrilla, during the quarter within the mill, two new filter presses were delivered and installed. Also, construction of two new leaching tanks and one additional thickener tank commenced. Recoveries and capacity are expected to improve once these new tanks come online in the third quarter. At the mine, preparation of the lower levels within the Rosarios area and the addition of a long hole drilling machine is now allowing for an increase in production and improved grades from the sulphides area. Seven drill rigs are presently active which are focusing on drilling out NI 43-101 compliant Resources. A new updated NI 43-101 report is expected to be released prior to year end.
San Martin Silver Mine
At San Martin during the quarter the primary focus was a change in mining methods that has resulted in productivity improvements and reduction in costs. The changes have allowed for a reduction of development and improvement in the use of the underground fleet of equipment. In addition, a new portable screen was installed at the mine in order to take advantage of some of the backfill and dumps left from previous years of operation. Another focus has been; in order to achieve certification as a "clean industry" at the mill, reinforcement of older leaching tanks is in process, construction of a complete spillage control system was completed, a new dust collector within the crushing area was installed and a fumes control system was installed within the smelter area. Also, the flotation circuit continues to be expanded and improved with the installation of the two new thickeners and filters. Once completed, it is anticipated that a higher quality concentrate will be produced. Nine drill rigs are presently exploring and developing Resources at San Martin. An updated NI 43-101 is expected to be released prior to year end.
La Encantada Silver Mine
Construction of the new 3500tpd cyanidation mill is going well at the La Encantada. Three flat bed trucks of equipment have arrived since construction commenced and 17 trailers are presently waiting at the US border. In addition to this major construction project, several additional pieces of underground equipment were added to the operations and improvements in the underground electric installations were completed. Three drill rigs commenced drilling during the quarter from underground and are showing good signs of early successes. In addition to exploration successes during the quarter, development has been going well with several new areas within the mine being opened for production. Within the mill, the replacement of the secondary crusher was completed and an upgrade to the flotation cells has allowed a better quality of the lead concentrate production which has helped to compensate the increase the increase in smelting costs. An updated NI 43-101 is expected to be released prior to year end.
(...)---
VG heron -
Finanzergebnisse für das Jahr 2008
Bruttoeinnahmen 2008 $56,1 Mio.
Nettoeinnahmen 2008 $44,3 Mio.
Nettoeinnahmen 4. Quartal $9,1 Mio.
Einnahmen aus dem Minenbetrieb 2008 $7,5 Mio.
Verluste aus dem Minenbetrieb 4. Quartal $1,1 Mio.
Betriebs-Cashflow 2008 (vor Änderungen im Betriebskapital) $4,6 Mio.
gesamte äquivalente Silberproduktion 2008 4.229.998 Unzen
gesamte Cash-Kosten pro Unze Silber im Jahr US$5,87
gesamte Minenkosten pro Tonne im Jahr US$43,08
aktueller Barbestand $32,2 Mio. -
First Majestic Silver Corp. hat im ersten Quartal, das am 31. März 2009 zu Ende ging, 1.040.117 äquivalente Unzen Silber produziert.
Die äquivalente Silberproduktion belief sich im ersten Quartal auf 929.964 Unzen Silber, was im Vergleich zum ersten Quartal 2008 eine Steigerung um 4 % und im Vergleich zum vierten Quartal 2008 einen leichten Rückgang um 156 Unzen Silber darstellt. In diesem Quartal wurden 1.828.739 Pfund Blei produziert, um 2 % weniger als im ersten Quartal 2008 und um 13 % (265.248 Pfund) weniger als im vierten Quartal 2008. In diesem Quartal wurden 491 Unzen Gold produziert, eine Steigerung um 105 % im Vergleich zum ersten Quartal 2008 und eine Steigerung um 22 % im Vergleich zum vierten Quartal 2008.
Das Erz, das von den drei Silberminen des Unternehmens (La Parrilla, San Martin und La Encantada) verarbeitet wurde, betrug in diesem Quartal 216.047 Tonnen - eine Steigerung um 36 % im Vergleich zum selben Quartal 2008 und eine mäßige Steigerung um 401 Tonnen im Vergleich zum vierten Quartal 2008.
Der insgesamte durchschnittliche Silbergehalt der drei Minen stieg auf 222 g/t Silber; im vierten Quartal 2008 waren es 207 g/t Ag.
Die gesamten kombinierten Silbergewinnungen bei den drei unternehmenseigenen Mühlen beliefen sich auf 60 %; im vorherigen Quartal waren es 65 %. Beim La-Encantada-Betrieb führten hohe Manganwerte im Erz sowie ein erhöhter Durchsatz der Mühle zu geringen Gewinnungen. Beim San-Martin-Betrieb hatte das hochgradige kohlehaltige Erz Auswirkungen auf die Metallurgie, was jedoch durch höhere Gehalte wettgemacht wurde. Bei La Encantada werden Maßnahmen gesetzt, um die Gewinnungen zu verbessern; doch bis die neue Cyanidationsanlage mit einer Kapazität von 3.500 tpd im Juni dieses Jahres fertiggestellt wird, rechnet man nur mit etwas höheren Gewinnungen.
Das Unternehmen hat im vierten Quartal 2008 die Explorations- und Erschließungsprogramme bei jedem seiner Betriebe reduziert. Das Unternehmen wird weiterhin seine Ausgaben analysieren, um die Betriebe zu optimieren und die Rentabilität zu verbessern.
In diesem Quartal wurden Untertageerschließungen auf 4.610 Metern durchgeführt; im ersten Quartal 2008 waren es 6.006 Meter, im vierten Quartal 2008 insgesamt 5.847 Meter. Dieses Programm ist von großer Bedeutung, da es den Zugang zu neuen Gebieten innerhalb unterschiedlicher Minen öffnet und die Minen auf ein kontinuierliches Wachstum der Silberproduktion vorbereitet. Das Unternehmen reduzierte vor kurzem sein Bohrprogramm auf zwei Bohrgeräte, die nur bei San Martin im Einsatz sind. Im ersten Quartal wurden 31 Bohrlöcher abgeschlossen, womit die im vergangenen Jahr begonnenen Bohrprogramme beendet werden konnten. In diesem Quartal wurden Diamantbohrungen auf insgesamt 5.048 Meter durchgeführt; im ersten Quartal 2008 waren es 10.256 Meter, im vierten Quartal 2008 insgesamt 4.193 Meter. -
LOL Puscherle
-
-
bin in den letzten tagen mit mehreren käufen reingegangen! erwarte eine deutliche aufwärtsbewegung mit dem steigenden gold- und silberpreis in den nächsten tagen!
-
Finanzbericht 1. Quartal
1. Quartal
Bruttoeinnahmen $ 17,5 Millionen
Nettoeinnahmen $ 14,4 Millionen
Einnahmen aus Minenbetrieben $ 4,5 Millionen
Nettogewinn nach Steuerabzug $ 0,9 Millionen
Direkte Investitionskosten pro Unze US$ 4,94
Silberäquivalentproduktion 1.040.117 oz Ag-Äq.
Verkaufte Unzen Silberäquivalent 996.595 oz Ag-Äq -
Hier niemand mehr an Board ? Sieht doch ganz gut aus...
[Blockierte Grafik: http://www.abload.de/img/2lxf5.png]
-
News Releases - Thursday, April 08, 2010
La Encantada Achieves Commercial Production =======================================================================First Majestic Silver Corp. (the "Company") is pleased to announce that the Company's new 3,500 tpd cyanidation plant at its La Encantada Silver Mine in Coahuila, Mexico has reached commercial production effective April 1st, 2010.
The throughput since April 1st has averaged 2600 tpd while the average throughput for the month of March was 1450 tpd. Full capacity at 3,500 tpd is expected to be reached in May 2010 resulting in production at an annualized rate of over 4 million ounces of silver doré bars per year.
The new plant is now 98% complete with the only item remaining being the delivery and installation of the 'Induction Furnaces'.The completion of this new world-class cyanidation plant is beginning to have a significant impact on the Company's production growth. The Company plans to release its first quarter production results on April 12, 2010.
This plant is currently producing silver precipitates which are being shipped regularly to the smelter until the new induction furnaces are installed later this quarter. Once these furnaces are operating, the Company will be producing its own doré bars which will further reduce third party smelting and refining charges.
The last major items installed in the first quarter were the tailings filter-presses which are allowing for the recirculation of 84% of the water circulating in the system. These filters are some of the latest mining technologies available resulting in First Majestic setting an important standard for sustainable operational practices. The plant is using much less water than originally expected and much less than a traditional operation of this type. This state-of-art process is also opening the possibility for immediate reclamation of permanent rejuvenated open space.
The use of this filter press technology will play a central role in achieving superior operational performance in the areas of water use, cyanide use, land use and environmental impact. These three large, heavy duty, 2m x 2m automatic filter presses are dewatering the tailings to 16% moisture levels resulting in substantial savings in pumping, cyanide consumption and power generation. Additionally, the remaining tailings cake is being dry-stacked which eliminates the need for conventional tailings ponds and promotes ongoing reclamation and re-vegetation of the area.
Ongoing daily improvements are underway and being focused in the areas of daily tonnage, recoveries, quality of precipitate production and other plant optimizations.
Ramon Davila, Chief Operating Officer, stated; "To have a plant of this size deemed commercial within five months of being inaugurated is an impressive achievement and something our team deserves a lot of credit for. These are exciting times for First Majestic".
In addition to the completion of the new cyanidation plant, the Company also invested in improving the old flotation plant by installing several new flotation cells and ancillary equipment. Improvements in recoveries resulted immediately and will be evident in future production and financial results going forward.
Keith Neumeyer, CEO & President stated; "As this major milestone comes to its completion, this will result in our production of silver exceeding 6 million ounces this year and we can now look forward to other exciting challenges ahead. Congratulations should go out to all of our management, staff and construction crew for their professionalism and commitment to our growth strategy. This team is now readying itself for our next stage of expansion. Stay tuned."
First Majestic is a producing silver company focused in Mexico and is aggressively pursuing its business plan to become a senior silver producer through the development of its existing assets and the pursuit through acquisition of additional assets that contribute to achieving its significant corporate growth objectives.
FOR FURTHER INFORMATION contact info@firstmajestic.com, visit our website at http://www.firstmajestic.com or call our toll free number 1.866.529.2807.
-
Hier niemand mehr an Board ? Sieht doch ganz gut aus...
(....)
FR war vor Jahren hier ein absoluter Hit, auch bei mir. Eine Anzahl Verwässerungen warfen den Kurs zurück, dann folgte der berüchtigte Einbruch va. der Silberaktien.
Bin mit Stoploss (besser Stopwin) heraus. Es gibt sicher noch Mitglieder hier, die durchhielten, ich bin in andere herein:"Das Bessere ist der Feind des Guten".
Kleine Goldminen un -Explorer liefen iÜ. bedeutend besser, aber das stört Silberbugs weniger....
Grüsse
-
-
FR war vor Jahren hier ein absoluter Hit...
Nun , so lange bin ich bei FR noch nicht an Board. Inzwischen hat K.Neumeyer ja einige der gesteckten Ziele erreicht und man hat die Produktion ordentlich ausgeweitet. Meines Erachtens steckt noch einiges an Potential in dem Wert und ich könnte mir vorstellen, dass FR auch auf dem Radar einiger Top-Tier-Producer in Sachen Übernahme ist. Wenn die eigene Guideline in Sachen Gewinn in etwa 'ausgeschöpft' wird, (35 - 40 Cents je Aktie) hat FR eine PE/e von roundabout 9...etwas vergleichbar bewertetes habe ich unter den Minen bisher nicht gefunden. Ein Verdoppler scheint mir jedenfalls leicht möglich, um nicht zu sagen wahrscheinlich zu sein.
-
Do, 07.10.10 13:53
IRW-News: First Majestic SilverIRW-PRESS: First Majestic Silver: First Majestic Silver Corp.: Weiterer neuer Rekord bei Silberproduktion; 1.823.370 Unzen Silber wurden im dritten Quartal produziert
First Majestic Silver Corp.: Weiterer neuer Rekord bei Silberproduktion; 1.823.370 Unzen Silber wurden im dritten Quartal produziert
Highlights
 Silberproduktion steigt im Vergleich zum vorherigen Quartal um 18 % auf einen Quartalsrekord von 1.823.370
 Menge der äquivalenten Silberproduktion belief sich in diesem Quartal auf 1.920.498 Unzen
 Menge der Silberproduktion betrug 95 % der gesamten äquivalenten Silberproduktion
 Insgesamt verarbeitetes Erz stieg in diesem Quartal um 7 % auf einen Rekord von 434.221 Tonnen im Vergleich zum vorherigen Quartal
First Majestic Silver Corp. (First Majestic oder das Unternehmen) freut sich bekannt zu geben, dass die Produktion im dritten Quartal, das am 30. September 2010 zu Ende ging, auf 1.920.498 äquivalente Unzen Silber gestiegen ist, was eine Steigerung um 16 % im Vergleich zum vorherigen Quartal sowie um 76 % im Vergleich zum dritten Quartal 2009 darstellt.
Die gesamte äquivalente Silberproduktion belief sich in diesem Quartal auf 1.823.370 Unzen Silber, was eine Steigerung um 18 % im Vergleich zum vorherigen Quartal darstellt, auf 1.248.086 Pfund Blei, was einen Rückgang um 16 % im Vergleich zum vorherigen Quartal darstellt, und auf 377 Unzen Gold, was einen Rückgang um 36 % im Vergleich zum vorherigen Quartal darstellt. Die gesamte Silberproduktion bei den Betrieben stieg im Vergleich zum dritten Quartal 2009 um 95 %.
Bei den drei aktiven Silberminen des Unternehmens La Encantada, La Parrilla und San Martín wurde in diesem Quartal ein neuer Rekord von insgesamt 434.221 Tonnen Erz verarbeitet, was eine Steigerung um 7 % im Vergleich zum vorherigen Quartal darstellt.
Tabelle der Produktionsdetails: http://www.irw-press.com/dokumente/FR_Tables_061010.pdf
Weitere Entwicklungen
Die untertägigen Erschließungsarbeiten des Unternehmens im dritten Quartal beliefen sich auf 6.207 Meter im Vergleich zu 5.063 Meter im vorherigen Quartal. Diamantbohraktivitäten in diesem Quartal umfassten 7.819 Meter im Vergleich zu 3.090 abgeschlossenen Metern im vorherigen Quartal. Das erweiterte Bohrprogramm bestand aus Definitionsbohrungen zur Unterstützung der Bergbauaktivitäten, der Hochstufung der Ressourcen sowie Explorationen auf den drei Minen des Unternehmens.
Da die Mine La Encantada mittlerweile die vollständige Kapazität erreicht hat, wird sich das Unternehmen in den nächsten 15 Monaten auf folgende Maßnahmen konzentrieren: 1) die Erweiterung des unternehmenseigenen Betriebs bei La Parrilla, 2) das Treffen einer endgültigen Entscheidung bezüglich Größe und Zeitplan einer neuen Mühlenkonstruktion bei der unternehmenseigenen Silbermine La Toro, und 3) die Erweiterung der NI 43-101 konformen Reserven / Ressourcen bei jedem der fünf unternehmenseigenen Projekte (Silbermine La Encantada, Silbermine La Parrilla, Silbermine San Martin, Del Toro Silbermine und das Silberprojekt Real de Catorce).
Bei der Silbermine La Encantada:
Die neue Cyanidationsmühle mit einer Kapazität von 3.500 Tagestonnen erreichte in diesem Quartal eine vollständige Produktion. Der durchschnittliche Durchsatz erreichte 3.477 Tagestonnen bei insgesamt 295.328 Tonnen (Trockengewicht) im Vergleich zu 2.908 Tagestonnen im zweiten Quartal. Die vollständige Kapazität basiert auf einem Jahresbetrieb mit 330 Tagen (85 Tage für das dritte Quartal), was 297.500 Tonnen entspricht und bestätigt, dass die Mühle mit einer Kapazitätsauslastung von 99% betrieben wird.
Kosteneinsparungen sollen im Vergleich zum zweiten Quartal verbessert werden, da der Durchsatz im dritten Quartal die vollständige Kapazität erreicht hat.
Im Juli wurde der Hauptzugang zur Mine von Muzquiz, Coahuila, durch den Hurrikan Alex unterbrochen. In Kooperation mit anderen Bergbauunternehmen aus der Gegend vereinte man die Bemühungen, um die Straßen wieder für den Verkehr zu öffnen. Die Unterbrechung war nur kurzfristig und führte zu minimalen Verzögerungen beim Transport der Betriebsmittel. Weitere Arbeiten zur Verbesserung der Infrastruktur vor Ort bzw. zur Verhinderung von zukünftigen Unterbrechungen sind im Gange.
Da der Durchsatz in der Mühle mittlerweile die vollständige Kapazität erreicht hat, wird der Schwerpunkt im vierten Quartal darauf liegen, die Arbeitsabläufe im Bereich der Gewinnungen, der Schmelze sowie anderen Bereichen, in denen eine Kostenoptimierung und Effizienzsteigerung erwartet wird, zu verbessern.
Bei der Silbermine La Parrilla:
Laut der Pressemitteilung vom 8. Juli 2010, in der eine Erweiterung des Betriebs bei La Parrilla besprochen wurde, wird der Abschluss der endgültigen konstruktiven Gestaltung und der Planung im vierten Quartal erwartet. Genehmigungen werden im ersten Quartal 2011 erwartet und unmittelbar danach soll mit der Förderung begonnen werden. Der gegenwärtige Plan besteht darin, diesen Betrieb von seiner gegenwärtigen Kapazität von 850 Tagestonnen auf 1.600 Tagestonnen zu erweitern, wobei die Produktion vom gegenwärtigen Niveau ausgehend bis Ende 2011 verdoppelt wird. Sobald die endgültigen Pläne fertiggestellt sind, wird das Unternehmen weitere Details bekannt geben.
Während dem Quartal erwarb das Unternehmen weitere 16.630 Hektar durch Abstecken, wodurch ein angrenzender Grundstücksblock von 69.867 Hektar rund um den Parrilla Minenbetrieb entstanden ist. Mehrere größere geophysikalische Anomalien sind nun im Grundbesitz von First Majestic beinhaltet. Geophysikalische regionale Explorationsarbeiten und Kartierungen werden derzeit durchgeführt, um ein umfassendes Diamantbohrprogramm, welches für 2011 geplant ist, zu definieren.
Bei der Mine San Martin:
Das Diamantexplorationsbohrprogramm an der Oberfläche 2010 begann im zweiten Quartal. Die Ader La Esperanza, die Mitte 2009 entdeckt und erprobt wurde und parallel zur Hauptader Zuloaga verläuft, ergab an der Oberfläche äußerst anomale Silberwerte und ist daher ein vorrangiges Ziel bei San Martín. Bisher wurden die Bohrungen in sieben Löchern 2.757 Metern abgeschlossen und lieferten gute Ergebnisse. Gehalte im Bereich von 100 g/t bis zu mehr als einem Kilo (1.000 g/t) wurden durchschnitten. Das Bohrprogramm wird im vierten Quartal fortgesetzt und eine Fortsetzung bis 2011 wird evaluiert werden.
Bei der Silbermine Del Toro:
Die Erschließung wurde im Monat September wieder aufgenommen. Der gegenwärtige 1.000 Meter Rampenbau wurde geplant, um in einer Tiefe von ungefähr 300 Metern auf den dritten Erzkörper zu treffen (siehe Pressemitteilung vom 28. Oktober 2008). Das Ziel besteht darin, Mengenproben von ungefähr 5.000 Tonnen zu sammeln und diese Proben in der La Parrilla Mühle einem Test zu unterziehen, um metallurgische Testarbeiten durchzuführen. Diese Testarbeiten werden die Feinabstimmung und Gestaltung des endgültigen Fließdiagramms für eine neue Flotationsanlage, mit deren Konstruktion im Jahr 2011 begonnen werden soll, ermöglichen. Die optimale Abbaumethode wird ebenfalls von Mengenprobentnahmen und der Erschließung bestimmt werden. Wie bereits in vorherigen Pressemitteilungen angedeutet, wurden bereits sämtliche Genehmigungen für die Errichtung einer neuen Anlage bei Del Toro erteilt.
Herr Keith Neumeyer, President und CEO, sagte: Der Betrieb von First Majestic übertrifft die budgetierten Niveaus. Dies verdeutlicht die Bemühungen unseres Managements und unserer Mitarbeiter in allen Bereichen unseres Unternehmens. Es ist erfreulich, die glänzenden Leistungen unseres Unternehmens zu beobachten, da weiterhin neue Rekorde gebrochen werden.Ramon Davila, Ing., Chief Operating Officer von First Majestic, ist die qualifizierte Person, die diese Pressemitteilung geprüft und die Minenbetriebe beaufsichtigt hat.
Mal gucken, wie der Kurs die nächsten Tage weiter so reagiert. Bin selbst seit Mai dort investiert
Gruß,
JohnPain -
Hi,
diese feine Aktie ist bisher seit Mai ein Riesenspaß in meinem Depot (jed. zuwenige gekauft)
Aber der Kursverlauf schaut mir mittlerweile ein wenig bedrohlich aus.
Ich überlege daher, beim derzeitigen Stand (+164,92%) mal ein wenig Gewinn zu realisieren und umzuschichten.Brauche auch mal ein paar GPR....
Was meint ihr?
Gruß,
JohnPain -
FR war lange eine meiner bevorzugten Minen..
Sie ist mE. sehr überkauft, im Chart klafft eine große Abrißlücke bei 8,5 C$.
Wenn ich sie hätte, würde ich erhebliche Gewinnmitnahmen machen.GPR hat ein ähnliches Bild, auch mit Abriß, tja Charts, ist aber mE. nicht allzu hoch bewertet.
Grüsse
Edel -
Hi,
diese feine Aktie ist bisher seit Mai ein Riesenspaß in meinem Depot (jed. zuwenige gekauft)
Aber der Kursverlauf schaut mir mittlerweile ein wenig bedrohlich aus.
Ich überlege daher, beim derzeitigen Stand (+164,92%) mal ein wenig Gewinn zu realisieren und umzuschichten.Brauche auch mal ein paar GPR....
Was meint ihr?
Gruß,
JohnPainDen Gedanken hatte ich Anfang der letzten Woche auch und hatte für 50% meiner Position eine STOP LOSS @ 7.10 und eine SELL - Order @ $9.99 eingestellt - letztere ging dann Freitag durch. Das gleiche hatte ich mir auch für USSIF überlegt (+344% seit May), letzlich habe ich die jedoch nicht nur behalten sondern noch welche für $.58 nachgekauft (auf die nächsten 300% ...).
-