Auch neue BE:
Skeena Intersects 16.64 g/t Au over 5.10 m in 200 Footwall at Snip
NR: 20-01
Vancouver, BC (January 9, 2020) Skeena Resources Limited (TSX.V: SKE, OTCQX: SKREF) (“Skeena” or the “Company”) is pleased to announce the remaining analytical results from the 2019 Phase I surface exploration drilling program at the 100% owned Snip gold project (“Snip”) located in the Golden Triangle of British Columbia. The 2019 exploration program consisted of 10 surface drill holes totaling 1,934 m which tested the 200 Footwall Corridor (“200 Footwall”). Reference images are presented at the end of this release as well as on the Company’s website.
2019 Phase I Snip Project Drilling Highlights:
- 16.64 g/t Au over 5.10 m (S19-035)
- Including: 96.20 g/t Au over 0.50 m
- And 39.80 g/t Au over 0.85 m
- 57.90 g/t Au over 0.65 m (S19-041)
- 57.00 g/t Au over 0.50 m (S19-041)
- 12.00 g/t Au over 1.35 m (S19-043)