Silvercrest Metals / SIL, SILV (TSX, ASE)

  • SilverCrest Announces Results from 2021 Infill and Expansion Drilling in the Babicanora Area

    • 3.0m (ETW) Grading 3,319 gpt AgEq
    • 3.6m (ETW) Grading 2,815 gpt AgEq
    • 0.4m (ETW) Grading 7,249 gpt AgEq

    VANCOUVER, BC – September 9, 2021 - SilverCrest Metals Inc. (“SilverCrest” or the “Company”) is pleased to announce that its 2021 planned infill drilling for the Babi Vista Vein (“Babi Vista”), Babi Vista Vein Splay (“Splay”), and Granaditas Vein 1 Vein (“Granaditas") is nearing completion, along with continuation of expansion drilling in the Babicanora Area of its Las Chispas Project (“Las Chispas” or the “Project”) located in Sonora, Mexico (see following Tables and attached Figures). The objective of this drilling program is to increase drill density in an area proximal to current and planned underground development. This drilling is targeting conversion of an estimated 15.4M oz AgEq grading 9.97 gpt Au and 707.9 gpt Ag, or 1,574 gpt AgEq (86.9:1 Au:Ag ratio, see note below tables) of Inferred Resources (as stated in the “2021 Feasibility Study”1) to higher confidence Indicated Resources to support an updated Mineral Reserve and Life of Mine Plan (“LOM”) in 2022.
    Highlights:

    • Infill Drilling - During the first seven months of 2021, a total of 80,632 metres in 176 drill holes have been completed at Las Chispas. This includes a total of 52,035 metres in 141 infill drill holes in the Babi Vista, Splay, and Granaditas veins with approximately 20% of infill holes intersecting grades greater than 1,000 gpt AgEq (see attached Figures:(

      • Confirmation of Targeted Areas – The infill program increased estimated drill density to 25 to 35 metres (from 45 to 50 metres) over a strike length of 1.3 kilometres and successfully confirmed the grades and approximate footprint of Inferred Resources reported in the 2021 Feasibility Study.
      • Delineation of High-Grade “Shoot 201” - Infill drilling confirmed a multi-kilogram per tonne (AgEq basis) zone now named “Shoot 201” in the Splay, which surrounds the previous high-grade results in hole BV20-201, 203 and 207 (see News Release November 16, 2020). This zone has now been better defined with 11 additional holes that have an average uncapped, undiluted grade of 30.04 gpt Au and 2,429.4 gpt Ag, or 5,040 gpt AgEq, over an estimated true width (“ETW”) of 1.4 metres, within a high-grade footprint of approximately 100 metres by 75 metres. Shoot 201, along with the balance of the Splay and Granaditas, are currently not in the reserves or LOM and will be considered for conversion in an updated study in 2022.
    • Expansion Drilling - 16 expansion holes totalling 8,118 metres were completed in the renamed Babi Vista FW Zone (multiple veins) and the Babicanora Norte HW Vein (see attached Figures);

      • Babi Vista FW Vein Becomes Babi Vista FW Zone - A total of 18 new intercepts having an ETW of 0.57 metres grading 5.54 gpt Au and 680.2 gpt Ag, or 1,162 gpt AgEq have expanded the Babi Vista FW Vein, which is now renamed the Babi Vista FW Zone to incorporate the presence of several new sub-parallel and semi-continuous veins between the Splay and Babicanora Norte veins.
      • Babicanora Norte HW Vein – This vein has been expanded by approximately 300 metres along strike (see 2021 Feasibility Study). Ten new intercepts have an ETW of 0.40 metres grading 2.0 gpt Au and 260 gpt Ag, or 434 gpt AgEq.
    • H2, 2021 Focus on Infill, Expansion and Exploration – With infill drilling complete on Babi Vista, Splay, and Granaditas, the Company is working to complete other infill drilling on Babicanora Norte NW while transitioning to expansion and new exploration drilling within the Babicanora Area...
  • Update zu ihrer Las Chispas Mine. Es läuft alles nach Plan :thumbup:



    SilverCrest Metals Las Chispas Project Construction Remains on Schedule and Budget



    https://www.juniorminingnetwor…-schedule-and-budget.html



    Höhepunkte

    • Bauarbeiten liegen weiterhin im Zeitplan - Am Ende des dritten Quartals 2021 ("Q3, 2021") waren die Bauarbeiten bei Las Chispas zu 54 % abgeschlossen, verglichen mit einer geplanten Gesamtfertigstellung von 48 %. Die Bauarbeiten kamen im Quartal weiterhin gut voran, wobei die Hauptzufahrtsstraße, die Detailplanung der Anlage und die Betonarbeiten nun abgeschlossen sind, der Brückenbau zu 88 %, der Anlagenbau zu 49 %, die Stromleitung zu 47 % und die unterirdische Infrastruktur im Gange sind. Der Baufortschritt profitierte weiterhin davon, dass es keine Verzögerungen aufgrund von COVID-19 oder aus anderen Gründen gab.
    • Gute Entwicklung der Kapitalausgaben im Vergleich zum Budget - Bis zum dritten Quartal 2021 wurden 68 % der in der Durchführbarkeitsstudie* geschätzten Kapitalkosten in Höhe von 137,7 Mio. $ gebunden, wovon 57 % in allen Bereichen der Kapitalkosten angefallen sind, was dem Budget entspricht. Am Ende des dritten Quartals 2021 sind bis zur Inbetriebnahme noch etwa 59,0 Mio. $ an Kapitalkosten zu tätigen. Eine Reihe von wichtigen Infrastrukturaufgaben sind nun abgeschlossen oder stehen kurz vor dem Abschluss, wodurch das Risiko einer Kosteninflation begrenzt wird.
    • Untertägige Erschließung vor dem Zeitplan- Da die untertägige Erschließung am Ende des ersten Halbjahres 2021 vor dem Zeitplan lag, schritt die Erschließung im dritten Quartal 2021 weiter gut voran, sodass seit Beginn der untertägigen Erschließung im ersten Quartal 2019 insgesamt 15,7 km fertiggestellt wurden. Die Einheitskosten für den Untertagebau liegen weiterhin leicht unter dem Budget und die Erschließungsmeter liegen im bisherigen Jahresverlauf deutlich über dem Budget der Machbarkeitsstudie (1,6 km).
    • Sicherheit am Standort hat weiterhin oberste Priorität - Ende des dritten Quartals 2021, nach 1,33 Millionen Arbeitsstunden am Standort, lag die Häufigkeit von Unfällen mit Ausfalltagen ("LTI") bei 0,60. Die Bemühungen zur COVID-19-Risikominderung wurden im Quartal erfolgreich fortgesetzt, wobei weitere 4.800 COVID-19-Tests durchgeführt wurden und die Positivitätsrate niedrig blieb. Das Unternehmen nahm auch an einem lokalen Impfprogramm teil, das das Bundesprogramm ergänzte. Im Rahmen dieses lokalen Programms wurden 220 Mitarbeiter und Auftragnehmer vollständig geimpft und weitere 110 Mitarbeiter und Auftragnehmer mit der ersten Dosis geimpft.
    • Baufinanzierung, kurzfristiger Cashflow - Zum 30. September 2021 verfügte SilverCrest über Barmittel und Barmitteläquivalente in Höhe von 199,0 Millionen $ und 60,0 Millionen $, die im Rahmen einer Projektfinanzierungsfazilität in Höhe von 120,0 Millionen $ (die "Kreditfazilität") verbleiben. Nach dem Vollbetrieb und unter Verwendung von Base-Case-Metallpreisen (1.500 $/Unze Au und 19,00 $/Unze Ag), die etwa 17 % bzw. 22 % unter den aktuellen Preisen liegen, schätzte die Machbarkeitsstudie den freien Cashflow des Projekts nach Steuern auf etwa 160,0 Millionen $ im Jahr 2023 und einen geschätzten Durchschnitt von 110,0 Millionen $ pro Jahr von 2023 bis 2029. Da mehr als 80 % der anfänglichen Kapitalkosten voraussichtlich bis Ende 2021 gebunden sein werden, geht SilverCrest davon aus, für die Inbetriebnahme und den Hochlauf im Jahr 2022 gut finanziert zu sein und gleichzeitig die Flexibilität zu behalten, um weitere Explorationen, weitere Optimierungsarbeiten und Wachstumsmöglichkeiten zu verfolgen.
      * Technischer Bericht und Machbarkeitsstudie gemäß NI 43-101 für das Projekt Las Chispas vom 4. Januar 2021 ("Machbarkeitsstudie")

    Pierre Beaudoin, COO, bemerkte: "Unser Team und die Auftragnehmer machen, beflügelt durch ihren bisherigen Erfolg, weiterhin stetige Fortschritte beim sicheren Vorantreiben der Konstruktion des Projekts Las Chispas. Da das Projekt die Hälfte der Bauzeit und der Investitionskosten überschritten hat, werden die Bauarbeiten ihren Höhepunkt erreichen, und wir konzentrieren uns verstärkt auf den Betriebsbereitschaftsplan zur Vorbereitung der Inbetriebnahme der Anlage (voraussichtlich im 2. Quartal 2022) und des Produktionshochlaufs im 2. Parallel dazu werden wir uns weiterhin auf die Risikominderung konzentrieren und den weiteren Aufbau der oberirdischen Halde sowie die Weiterentwicklung der unterirdischen Erschließung vorantreiben. Das Bauteam strebt weiterhin an, bis Ende 2021 etwa 80 % des gesamten Baufortschritts zu erreichen, wobei die Inbetriebnahme der Anlage wie geplant im 2. Quartal 2022 erfolgen soll.


    N. Eric Fier, CPG, P.Eng. und CEO, sagte: "Die hervorragenden Bemühungen unseres Teams und der Auftragnehmer in Mexiko und Kanada wurden auch im dritten Quartal 2021 fortgesetzt, wobei in einer Reihe von Schlüsselbereichen des Projekts, einschließlich der Verarbeitungsanlage, der Zufahrtsstraße, der Stromleitung und der Brücke, beachtliche Fortschritte erzielt wurden. Der Bau des Projekts Las Chispas liegt weiterhin im Zeit- und Budgetrahmen und unsere starke Betriebskapitalposition ermöglicht es uns, unsere Wachstums- und Optimierungspläne voranzutreiben und gleichzeitig das Risiko zu verringern.
    Übersetzt mit http://www.DeepL.com/Translator (kostenlose Version)

    "Glück ist, was passiert, wenn Vorbereitung auf Gelegenheit trifft."
    Lucius Annaeus Seneca (1 - 65 n. Chr.)

    • Offizieller Beitrag

    SIL war einer der 5 Bestperformer der letzten Wochen. Der Chart zeigt den fulminanten Kursanstieg nach vorherigem Abfall auf Jahrestief. [smilie_blume]


    "Last week’s five TSX-listed mining stocks that saw the biggest gains are as follows:

    • Advantage Energy (TSX:AAV)
    • Suncor Energy (TSX:SU)
    • St. Augustine Gold and Copper (TSX:SAU)
    • Silver Elephant Mining (TSX:ELEF)
    • SilverCrest Metals (TSX:SIL).....

    SilverCrest Metals konzentriert sich auf neue Entdeckungen, wertsteigernde Akquisitionen und die angestrebte Produktion in den historischen Edelmetallgebieten Mexikos. SilverCrest ist das erste Unternehmen, das das historische, hochgradige Silber-Gold-Projekt Las Chispas, ein ehemaliger Edelmetallproduzent, durch Bohrungen erprobt.


    Das Unternehmen teilte letzten Dienstag mit, dass der Bau des Las Chispas-Projekts weiterhin im Zeit- und Kostenplan liegt. Die Aktien von SilverCrest Metals stiegen um 11,64 % und wurden zum Ende der Woche mit 10,93 C$ gehandelt...."


    https://investingnews.com/dail…rest-construction-update/
    Übersetzt mit http://www.DeepL.com/Translator (kostenlose Version)


    Grüsse
    Edel

    • Offizieller Beitrag

    Tw. sehr gute Bohrungen mit einigen kg Si / t, aber der Kurs schwächelt ...


    "N. Eric Fier, CPG, PEng, und Chief Executive Officer, bemerkte dazu: "Unser Bohrprogramm 2021 wurde konzipiert und erfolgreich abgeschlossen, um das Risiko zu senken und die Ressourcenumwandlung vor der Produktion anzupeilen. Die diesjährigen Bohrungen führten auch zur Entdeckung und Erweiterung von hochgradigen Adern und Zonen, auf die in dieser Pressemitteilung hingewiesen wird. Da das Infill-Programm 2021 abgeschlossen ist und die Minenkonstruktion ihren Höhepunkt erreicht hat, werden die Bohrungen bei Las Chispas bis zum [ersten Halbjahr] 2022 zurückgefahren. Wir konzentrieren uns weiterhin auf die Durchführung der Minenkonstruktion, die derzeit im Zeit- und Budgetrahmen liegt und im 2. Quartal 2022 abgeschlossen werden soll. ..."

    https://www.stockwatch.com/News/Item/Z-C!SIL-3183891/C/SIL
    Übersetzt mit http://www.DeepL.com/Translator (kostenlose Version)


    Grüsse
    Edel

    • Offizieller Beitrag

    "SilverCrest freut sich bekannt zu geben, dass die kanadische Tochtergesellschaft des Unternehmens wie geplant die dritte planmäßige Inanspruchnahme von 30 Millionen US$ im Rahmen der zuvor gemeldeten Projektfinanzierungsfazilität (Kreditfazilität") in Höhe von 120 Millionen US$ mit einer Tochtergesellschaft von RK Mine Finance (siehe Pressemitteilung vom 4. Januar 2021) abgeschlossen hat. Mit dieser Inanspruchnahme erhöht sich der Gesamtbetrag der bis dato aufgenommenen Schulden auf 90 Millionen US$. Die zusätzlichen Mittel werden für den weiteren Bau des unternehmenseigenen Projekts Las Chispas (Las Chispas" oder Projekt") in Sonora, Mexiko, verwendet, das im zweiten Quartal 2022 abgeschlossen werden soll.


    Um das Risiko zu begrenzen und die Flexibilität zu erhöhen, hat SilverCrest nun 75 % der Kreditfazilität in Übereinstimmung mit dem vereinbarten Zeitplan in Anspruch genommen. Durch den Abschluss dieser Inanspruchnahme stehen dem Unternehmen die verbleibenden 30 Millionen US$ bis zum 31. August 2022 zur Verfügung, also während des geplanten Produktionshochlaufs von Las Chispas im zweiten Halbjahr 2022. ...


    Das Unternehmen geht nach wie vor davon aus, dass die Bauarbeiten bis Ende 2021 zu 80 % abgeschlossen sein werden und die Anlagen bis zum zweiten Quartal 2022 volle Leistung erreichen....


    Zum 30. Dezember 2021 verfügt das Unternehmen über Barmittel und Barmitteläquivalente in Höhe von ca. 178 Mio. US$ [smilie_blume] und 30 Mio. US$, die im Rahmen seiner Kreditfazilität verbleiben."


    https://www.juniorminingnetwor…lion-credit-facility.html
    Übersetzt mit http://www.DeepL.com/Translator (kostenlose Version)


    Grüsse
    Edel


    "Die Märkte haben nie unrecht, die Menschen oft." Jesse Livermore, 20.Jh.


    "Die Demokratie ist das Paradies der Schreier und Schwätzer, Phraseure, Schmeichler und Schmarotzer, die jedem sachlichen Talent weit mehr den Weg verlegen, als dies in einer anderen Verfassungsform vorkommt." E.von Hartmann


    Dieser Beitrag ist eine persönliche Meinung gem. Art.5 Abs.1 GG und Urteil des BVG 1 BvR 1384/16

    • Offizieller Beitrag

    Und sie bewegt sich doch... SILV im Zickzack garade auf dem Niveau vor 2 Jahren. Jedenfalls finanziell gesund ausgestattet...


    Höhepunkte 2021


    Im ersten Quartal 2021 gab das Unternehmen positive Ergebnisse der Machbarkeitsstudie für das Projekt Las Chispas (die Machbarkeitsstudie") bekannt und begann mit dem Bau der Mine. Die Einzelheiten der Machbarkeitsstudie, einschließlich einer aktualisierten Mineralressourcenschätzung und einer ersten Mineralreservenschätzung, sind in einem technischen Bericht enthalten, der unter dem SEDAR-Profil des Unternehmens mit dem Titel "NI 43-101 Technical Report & Feasibility Study on the Las Chispas Project" mit einem Gültigkeitsdatum vom 4. Januar 2021 (der "technische Bericht") veröffentlicht wurde. Der technische Bericht wurde von Ausenco Engineering Canada Inc. und dessen Tochterunternehmen mit der Unterstützung mehrerer anderer unabhängiger Ingenieurbüros und Berater erstellt.


    Ende 2021 lag der allgemeine Baufortschritt bei Las Chispas mit 86,2 % über dem Zeitplan, verglichen mit einer geplanten Fertigstellung von 79,3 %. Im Jahr 2021 hat das Unternehmen 75,2 % (103,6 Mio. $) der in der Machbarkeitsstudie geschätzten Kapitalkosten in Höhe von 137,7 Mio. $ gebunden. Von den verbleibenden, im Jahr 2022 anfallenden Kapitalkosten entfallen 20,7 % (8,9 Mio. $) auf den Ausenco-Festpreisvertrag für Engineering, Beschaffung und Bau (EPC") für den Bau der Prozessanlage und 14,7 % (6,3 Mio. $) auf ungenutzte Eventualverbindlichkeiten....


    Finanzielle Ergebnisse


    Am 31. Dezember 2021 verfügte das Unternehmen über 176,5 Mio. $ (2020 - 135,1 Mio. $) an Barmitteln und Barmitteläquivalenten...."


    https://www.juniorminingnetwor…al-financial-results.html
    Übersetzt mit http://www.DeepL.com/Translator (kostenlose Version)


    Grüsse
    Edel

  • SilverCrest Announces Additional El Picacho Drill Results


    VANCOUVER, BC, April 13, 2022 /CNW/ - SilverCrest Metals Inc. ("SilverCrest" or the "Company") is pleased to announce additional results from its initial drill program at its El Picacho Property ("Picacho" or the "Property") located near Bacoachi, Sonora, Mexico. Picacho is located approximately 85 km by road northeast of the Company's Las Chispas project along a predominantly paved highway.


    Drill results reported in this release are from 56,780 metres (247 drill holes) targeting the Picacho Zone which now includes five adjacent and subparallel epithermal veins including; the Picacho Main Vein ("Picacho Main" with historic resource), Picacho Hanging Wall Vein ("Picacho HW", see news release dated February 24, 2021), Picacho Hanging Wall 2 Vein ("Picacho HW2", new discovery), Picacho Hanging Wall 3 Vein ("Picacho HW3", new discovery) and Picacho Footwall Vein ("Picacho FW", new discovery) (see Tables below and attached Figures).


    Highlights:

    • Initial Drilling of Historic Resource Completed, Expansion at Picacho Zone - A total of 68,200 metres (289 drill holes) at the Picacho Zone have been drilled to date including holes reported in a news release dated February 24, 2021. The focus of drilling was to better understand, redefine and potentially expand the Picacho Main Vein historic unverified resource1 of 7.8 million ounces silver equivalent ("AgEq"2) grading 8.50 grams per tonne ("gpt") gold ("Au") and 40.0 gpt silver ("Ag"), or 677 gpt AgEq. Overall, the Picacho Main and Picacho HW veins have expanded, and new vein discoveries are being reported within the Picacho Zone.
    • Picacho Main Vein Primary Focus of Drilling - Picacho Main Vein results, within a footprint of greater than 150 gpt AgEq ("Footprint"), are reported in this release. The average grade of these results is 5.42 gpt Au and 23.9 gpt Ag, or 431 gpt AgEq with an average estimated true width ("ETW") of 2.4 metres. Drilling in the Picacho Main Vein remains shallow with a maximum vertical drilled depth of approximately 300 metres and an approximate vein strike length of 550 metres. Drill spacing in the Footprint averages 35 metres.
    • New Vein Discoveries - While drilling the Picacho Main and Picacho HW veins, three new adjacent vein discoveries were intercepted. The cumulative strike length, within the defined Footprint for these veins, is approximately 400 metres. Overall, these veins average 7.47 gpt Au and 30.3 gpt Ag, or 591 gpt AgEq with an average true width of 0.9 metres.
    • Early-Stage Exploration, Drilling Continues - Currently less than 30% of the Property has had any mapping or sampling completed. Ongoing mapping, sampling, underground surveying of historical workings, target generation and geophysical interpretation continues as part of an early-stage exploration strategy. Two drills are expected to be active at Picacho throughout Q2, 2022.

    https://www.silvercrestmetals.…/index.php?content_id=492

    • Offizieller Beitrag

    "SilverCrest Metals (TSX: SILV NYSE-AM: SILV) erklärte, dass es am Donnerstag mit der Inbetriebnahme der Verarbeitungsanlage in seinem Gold-Silber-Projekt Las Chispas in Sonora, Mexiko, begonnen hat, das voraussichtlich im vierten Quartal die kommerzielle Produktion erreichen wird.


    Das kanadische Edelmetall-Explorations- und Erschließungsunternehmen sagte, dass der Bau der Anlage vor dem Zeitplan der Machbarkeitsstudie abgeschlossen wurde.


    Außerdem erwartet sie eine maßvollere Anhebung des unterirdischen Bergbaus und eine erhöhte betriebliche Flexibilität in den ersten Jahren der Produktion dank einer beträchtlichen Menge an lagerhaltigem Erz.


    "Ich möchte dem kombinierten Team von Ausenco und SilverCrest für ihre kontinuierlichen Bemühungen in den letzten 17 Monaten danken", sagte Pierre Beaudoin, COO von SilverCrest, in einer Stellungnahme. "Die Fertigstellung der Bauarbeiten während der Covid-19 Pandemie hat die Widerstandsfähigkeit aller Menschen auf die Probe gestellt und ich gratuliere ihnen mit großer Genugtuung zu einem unglaublichen Trio von Erfolgen: Keine schweren Unfälle, unter dem Budget und vor dem Zeitplan."


    Das Unternehmen hob hervor, dass es erwartet, dass die Kapitalkosten von Las Chispas niedriger sein werden als die in der Machbarkeitsstudie veranschlagten 137,7 Millionen US-Dollar, sagte aber, dass die endgültigen Kosten des Projekts noch zu regeln sind.


    Las Chispas wird voraussichtlich 12,4 Millionen Unzen Silberäquivalent produzieren. jährlich zwischen 2023 und 2029 von einem Betrieb mit 1.250 Tonnen pro Tag mit einer All-in-Sustaining-Kosten im ersten Quartal, die auf 7,07 US-Dollar pro Unze geschätzt werden..." [smilie_blume]


    https://www.northernminer.com/…pas-in-mexico/1003842073/
    https://www.systran.net/en/translate/


    Grüsse
    Edel


    "Die Märkte haben nie unrecht, die Menschen oft." Jesse Livermore, 20.Jh.


    "Die Demokratie ist das Paradies der Schreier und Schwätzer, Phraseure, Schmeichler und Schmarotzer, die jedem sachlichen Talent weit mehr den Weg verlegen, als dies in einer anderen Verfassungsform vorkommt." E.von Hartmann


    Dieser Beitrag ist eine persönliche Meinung gem. Art.5 Abs.1 GG und Urteil des BVG 1 BvR 1384/16

    • Offizieller Beitrag


    "Die Märkte haben nie unrecht, die Menschen oft." Jesse Livermore, 20.Jh.


    "Die Demokratie ist das Paradies der Schreier und Schwätzer, Phraseure, Schmeichler und Schmarotzer, die jedem sachlichen Talent weit mehr den Weg verlegen, als dies in einer anderen Verfassungsform vorkommt." E.von Hartmann


    Dieser Beitrag ist eine persönliche Meinung gem. Art.5 Abs.1 GG und Urteil des BVG 1 BvR 1384/16

  • SilverCrest Metals: One Of The Few Sound Options For Silver Exposure
    https://seekingalpha.com/artic…tions-for-silver-exposure
    Summary

    • SilverCrest Metals announced in May that it had completed construction on time and budget, an impressive feat.
    • In fact, it was one of the only producers to accomplish this despite wading through a global demand and multi-decade high inflation, a testament to the quality of this team.
    • Some investors might be anxious to put money to work with the silver producers down 50%, but there's important considerations to make before simply buying the most beaten-up names.
    • Given that we could see mineral reserve deletions and that many producers are operating at a loss on an all-in cost basis, I see SilverCrest as one of the only ways to get leverage to the silver price safely, given its industry-leading grades/margins.
    • Offizieller Beitrag

    Der Kurs dennoch wie so oft in dieser Phase sehr "verhalten"....


    "SilverCrest Metals Inc. („SilverCrest“ oder das „Unternehmen“) freut sich, ein Update zu den Inbetriebnahmeaktivitäten in der Mine Las Chispas („Las Chispas“ oder die „Mine“) des Unternehmens in Sonora, Mexiko, bereitzustellen. Alle Währungsbeträge hierin sind in US-Dollar angegeben, sofern nicht anders angegeben.


    Höhepunkte


    -- Die metallurgische Gewinnung und der tägliche Durchsatz der Verarbeitungsanlage liegen im Trend über den Hochlaufprognosen der Machbarkeitsstudie*;
    -- Für August 2022 wurde eine tatsächliche durchschnittliche Gewinnung von 96,2 % Gold („Au“) und 85,6 % Silber („Ag“) oder 90,7 % Silberäquivalent („AgÄq“)** und ein durchschnittlicher Tonnendurchsatz von 784 Tonnen pro Tag („tpd ") wurden erreicht
    -- Projekt vollständig mit Netzstrom versorgt;
    -- Zuverlässigkeit nicht im stabilen Zustand, aber Verbesserung im 4. Quartal 2022 erwartet Erschließung der unterirdischen Erzgang- und Abfallerschließung folgt weiterhin den Prognosen der Machbarkeitsstudie, Produktionseinstellung im Gange und Hochfahren der Untertagemine, die bis Ende 2022 auf 600 bis 700 tpd erhöht wird, verglichen mit 750 tpd in der Machbarkeitsstudie;
    -- Kontinuierlicher Fokus auf Aufmischung und Erzgewinnung
    -- Erster Metallverkauf im 3. Quartal 2022 erwartet, kommerzielle Produktion im Zeitplan für das 4. Quartal 2022...


    N. Eric Fier, CPG, P.Eng und CEO, erklärte: „Wir sind sehr stolz darauf, wie unser Team und unsere Auftragnehmer den Bauprozess und den Übergang zur Inbetriebnahme gesteuert haben, die in Las Chispas auf Kurs bleiben. Wir konzentrieren uns weiterhin auf das Management Risiko und freuen uns über die finanzielle Flexibilität, um die Herausforderungen und Chancen anzugehen, die auf uns zukommen werden"...."


    https://investingnews.com/silv…nearing-first-metal-sale/
    https://www.babelfish.de/


    Grüsse
    Edel


    [Blockierte Grafik: https://api.wsj.net/api/kaavio/charts/big.chart?nosettings=1&symb=silv&uf=8&type=2&size=2&sid=21105813&style=320&freq=1&entitlementtoken=0c33378313484ba9b46b8e24ded87dd6&time=8&rand=873440356&compidx=aaaaa%3a0&ma=3&maval=100&lf=512&lf2=4&lf3=0&height=444&width=579&mocktick=1]


    "Die Märkte haben nie unrecht, die Menschen oft." Jesse Livermore, 20.Jh.


    "Die Demokratie ist das Paradies der Schreier und Schwätzer, Phraseure, Schmeichler und Schmarotzer, die jedem sachlichen Talent weit mehr den Weg verlegen, als dies in einer anderen Verfassungsform vorkommt." E.von Hartmann


    Dieser Beitrag ist eine persönliche Meinung gem. Art.5 Abs.1 GG und Urteil des BVG 1 BvR 1384/16

  • SilverCrest gibt kommerzielle Produktion in Las Chispas bekannt



    TSX: SIL Mit Kursplus von 8,14 CAD…..+12,43 %....... +0,90

    https://finance.yahoo.com/news…uction-las-120000728.html

    VANCOUVER, BC , 7. November 2022 /PRNewswire/ - SilverCrest Metals Inc. („SilverCrest“ oder das „Unternehmen“) freut sich, die Erklärung der kommerziellen Produktion in der unternehmenseigenen Mine Las Chispas („Las Chispas“) bekannt zu geben Sonora, Mexiko , gültig ab 1. November 2022 .


    Die Erklärung der kommerziellen Produktion basiert auf dem Erreichen eines ununterbrochenen zweimonatigen Betriebs der Verarbeitungsanlage mit einer Kapazität von mindestens 80 % für das Typenschilddesign von 1.250 Tonnen pro Tag ("tpd") oder 1.000 tpd und dem Nachweis eines kombinierten Goldgehalts ("Au ") und eine Silberausbeute ("Ag") oder eine Silberäquivalentausbeute ("AgEq"**) von mehr als 85 %. Die Inbetriebnahme dauerte vom 1. September 2022 bis zum 31. Oktober 2022 , wo die Anlage 62.146 Tonnen Erz für durchschnittlich 1.019 tpd verarbeitete. Im gleichen Zeitraum betrug die metallurgische Gewinnung durchschnittlich 96,7 % Gold und 96,8 % Silber oder 96,7 % AgÄq.


    - ANZEIGE -


    Pierre Beaudoin , COO, erklärte: „Wir möchten unserem Standortteam in Las Chispas und unseren Auftragnehmern gratulieren, die maßgeblich dazu beigetragen haben, diesen Meilenstein innerhalb des geplanten Zeitplans zu erreichen. Wir waren von der frühen Leistung der Verarbeitungsanlage in Las Chispas beeindruckt und werden weitermachen um an der Feinabstimmung und dem Abschluss des Hochlaufs zu arbeiten. Unser Untertage-Bergbauteam fährt auch damit fort, den Betrieb hochzufahren, wobei der Schwerpunkt auf der Verfeinerung der Abbaumethoden und der Implementierung von Verfahren zur Gehaltskontrolle liegt."


    N. Eric Fier , CEO, kommentierte: „Der Umzug von Las Chispas von der Entdeckung in die Produktion in weniger als sieben Jahren ist eine monumentale Leistung. Wir sind sehr stolz auf das Engagement und die Ausführung aller Beteiligten. Wir freuen uns nun darauf, unseren Hochlauf abzuschließen entworfenen Niveaus, Generierung von Einnahmen mit anschließendem freien Cashflow und Veröffentlichung eines aktualisierten technischen Berichts im ersten Halbjahr 2023".


    Der Bau der Verarbeitungsanlage in Las Chispas wurde im Februar 2021 begonnen und im Mai 2022 pünktlich und im Rahmen des Budgets abgeschlossen, mit dem Ziel, die kommerzielle Produktion im vierten Quartal 2022 zu deklarieren. Während der gesamten Inbetriebnahme arbeitete die Verarbeitungsanlage im Einklang oder vor allen anderen Metriken der Machbarkeitsstudie* während der Verarbeitung von Erz, das hauptsächlich aus Halden stammt, einschließlich kürzlich abgebautem Untertageerz. Die Untertagemine treibt auch ihren Hochlauf mit dem Ziel voran, 2022 mit einer Rate von 600 bis 700 Tonnen pro Tag zu beenden, wie zuvor bekannt gegeben. Im Monat Oktober 2022 übertraf das Unternehmen das untere Ende dieses Abbauziels.


    Das Unternehmen wird in seinen Finanzdaten für das dritte Quartal 2022 sowie den MD&A und Finanzdaten weitere Einzelheiten zur Inbetriebnahme der Anlage, zum Untertagebau und zum Hochlauf der Produktion für das dritte Quartal 2022 und das bisherige Jahr bekannt geben.


    * Technischer Bericht und Machbarkeitsstudie gemäß NI 43-101 zum Projekt Las Chispas vom 4. Januar 2021 ("Machbarkeitsstudie")


    ** AgÄq basiert auf dem Gold-Silber-Verhältnis der Mineralressource und -reserve der Machbarkeitsstudie von 2021 von 86,9:1, berechnet unter Verwendung von 1.410 US$ /oz Au und 16,60 US$ /oz Ag


    Die qualifizierte Person gemäß National Instrument 43-101 Standards of Disclosure for Mineral Projects für diese Pressemitteilung ist N. Eric Fier , CPG, P.Eng und CEO von SilverCrest, der den Inhalt geprüft und genehmigt hat.


    ÜBER SILVERCREST METALS INC.


    SilverCrest ist ein kanadisches Edelmetallexplorations- und -produktionsunternehmen mit Hauptsitz in Vancouver, BC , das sich auf Neuentdeckungen, wertsteigernde Akquisitionen und Produktionsanlagen in den historischen Edelmetallgebieten Mexikos konzentriert. Das Hauptaugenmerk des Unternehmens liegt auf dem Betrieb seiner Mine Las Chispas in Sonora, Mexiko . Die laufende Initiative von SilverCrest besteht darin, seine Vermögensbasis zu erweitern, indem es die derzeitigen Ressourcen und Reserven erweitert, hochwertige Edelmetallprojekte erwirbt und erschließt und schließlich mehrere Silber-Gold-Minen in Amerika betreibt. Das Unternehmen wird von einem bewährten Managementteam in allen Aspekten des Edelmetallbergbausektors geleitet, einschließlich der Führung von Projekten durch Entdeckung, Finanzierung, termin- und budgetgerechte Errichtung und Produktion.


    Ich bin investiert und werde bei Überschreitung von ca. 8,80 CAN über Nachkauf/ Teilverkauf nachdenken


    Gruss RS

  • SilverCrest Metals Inc. (SILV) zum Kauf hochgestuft: Folgendes sollten Sie wissen
    Zacks Equity Research 02. Dezember 2022


    https://www.zacks.com/stock/news/2025004/silvercrest-metals-inc-silv-upgraded-to-buy-heres-what-you-should-know?cid=CS-NASDAQ-FT-tale_of_the_tape|yseop_template_12_zacks_rank_upgrade-2025004


    SilverCrest Metals Inc. (SILV SchnellangebotSILVkönnte eine solide Wahl für Investoren sein, da es kürzlich auf einen Zacks-Rang Nr. 2 (Kaufen) hochgestuft wurde. Diese Anhebung spiegelt im Wesentlichen einen Aufwärtstrend bei den Gewinnschätzungen wider – eine der stärksten Kräfte, die sich auf die Aktienkurse auswirken.


    Das Zacks-Rating stützt sich ausschließlich auf das sich ändernde Ertragsbild eines Unternehmens. Es verfolgt die EPS-Schätzungen für das laufende und die folgenden Jahre von den Sell-Side-Analysten, die die Aktie durch ein Konsensmaß abdecken – die Zacks-Konsensschätzung.


    Da ein sich änderndes Ertragsbild ein starker Faktor ist, der kurzfristige Aktienkursbewegungen beeinflusst, ist das Zacks-Ratingsystem für einzelne Anleger sehr nützlich. Sie finden es möglicherweise schwierig, Entscheidungen auf der Grundlage von Rating-Upgrades durch Wall-Street-Analysten zu treffen, da diese meist von subjektiven Faktoren bestimmt werden, die in Echtzeit schwer zu sehen und zu messen sind.


    Daher spiegelt die Heraufstufung des Zacks-Ratings für SilverCrest Metals Inc. im Grunde eine positive Einstellung zu den Gewinnaussichten wider, die sich in Kaufdruck und einem Anstieg des Aktienkurses niederschlagen könnten.


    Stärkste Kraft, die die Aktienkurse beeinflusst


    Die Veränderung des zukünftigen Ertragspotenzials eines Unternehmens, das sich in den Revisionen der Gewinn-schätzungen widerspiegelt, und die kurzfristige Kursbewegung seiner Aktie sind nachweislich stark korreliert. Das liegt zum Teil am Einfluss institutioneller Investoren, die Gewinne und Gewinnschätzungen für die Berechnung des fairen Wertes der Aktien eines Unternehmens verwenden. Eine Erhöhung oder Verringerung der Gewinnschätzungen in ihren Bewertungsmodellen führt einfach zu einem höheren oder niedrigeren beizulegenden Zeitwert für eine Aktie, und institutionelle Anleger kaufen oder verkaufen sie normalerweise. Ihre Transaktion großer Aktienmengen führt dann zu Kursbewegungen für die Aktie.


    Für SilverCrest Metals Inc. bedeuten steigende Gewinnschätzungen und die daraus resultierende Rating-Anhebung grundsätzlich eine Verbesserung des zugrunde liegenden Geschäfts des Unternehmens. Und die Wertschätzung der Anleger für diesen sich verbessernden Geschäftstrend sollte die Aktie nach oben treiben.


    Nutzung der Macht der Revisionen von Gewinnschätzungen


    Da empirische Untersuchungen eine starke Korrelation zwischen Trends bei Revisionen von Gewinnschätzungen und kurzfristigen Aktienbewegungen zeigen, könnte die Verfolgung solcher Revisionen für eine Anlageentscheidung wirklich lohnend sein. Hier spielt das bewährte Zacks Rank-Aktienbewertungssystem eine wichtige Rolle, da es die Macht der Gewinnschätzungsrevisionen effektiv nutzt.


    Das Aktienbewertungssystem Zacks Rank, das vier Faktoren im Zusammenhang mit Gewinnschätzungen verwendet, um Aktien in fünf Gruppen einzuteilen, die von Zacks Rank #1 (Strong Buy) bis Zacks Rank #5 (Strong Sell) reichen, hat eine beeindruckende, extern geprüfte Erfolgsbilanz Rekord, mit Zacks Rank #1-Aktien, die seit 1988 eine durchschnittliche jährliche Rendite von +25 % erwirtschaften.


    Überarbeitung der Gewinnschätzung für SilverCrest Metals Inc.


    Es wird erwartet, dass dieses Unternehmen für das im Dezember 2022 endende Geschäftsjahr einen ausgeglichenen Gewinn pro Aktie ausweisen wird, was einer Veränderung von 100 % gegenüber dem Vorjahr entspricht.


    Analysten haben ihre Schätzungen für SilverCrest Metals Inc. stetig angehoben. In den letzten drei Monaten ist die Zacks Consensus-Schätzung für das Unternehmen um 105,4 % gestiegen.


    Endeffekt


    Im Gegensatz zu den allzu optimistischen Wall-Street-Analysten, deren Bewertungssysteme tendenziell auf günstige Empfehlungen ausgerichtet sind, behält das Zacks-Ratingsystem für sein gesamtes Universum von mehr als 4000 Aktien zu jedem Zeitpunkt ein gleiches Verhältnis von „Kauf“- und „Verkauf“-Ratings bei. Unabhängig von den Marktbedingungen erhalten nur die besten 5 % der von Zacks gedeckten Aktien ein „Strong Buy“-Rating und die nächsten 15 % ein „Buy“-Rating. Die Platzierung einer Aktie in den oberen 20 % der von Zacks gedeckten Aktien weist also auf ihre überlegene Revisionsfunktion für Gewinnschätzungen hin, was sie zu einem soliden Kandidaten für kurzfristige Renditen macht, die den Markt übertreffen.


    Kommt im allgemeinen Silberanstiegt endlich die Aktie zum Laufen und vollbringt die Erwartungen?


    Gruss RS

Schriftgröße:  A A A A A