Erdene Resource Development Corp./ ERD (TSX)

  • Endlich wieder ein Lebenszeichen von Erdene Resource Development Corp. mit sehr hochgradigen Bohrergebnissen aus Altan Nar in der Mongolei. Bisher liegt der Hauptaugenmerk von Erdene auf dem Bayan Khundii Deposit, das nur 16 km weiter nördlich liegt und schon weiter mit der Exploration vorangeschritten ist.



    Erdene Intersects 23 Metres of 17 g/t Gold at Altan Nar and Expands New Khar Mori Gold Prospect on Khundii License


    16:53 Uhr | GlobeNewswire
    https://www.goldseiten.de/mine…Resource-Development-Corp
    HALIFAX, Feb. 04, 2020 - Erdene Resource Development Corp. (TSX:ERD; MSE:ERDN) ("Erdene" or the "Company") is pleased to report results from the Q4-2019 exploration program on its Altan Nar, Khundii and Ulaan licenses.
    “We are very encouraged by the results of the December 2019 drilling at Altan Nar which returned multiple shallow intersections in excess of 50 g/t gold,” said Peter Akerley, Erdene’s President and CEO. “These results expand the high-grade core of the Discovery Zone deposit and open up new areas for future drilling that should positively impact Altan Nar resources.”
    “These results, combined with the expansion of the new Khar Mori gold prospect area and the extension of gold mineralization south of Bayan Khundii in Q3-2019, continue to demonstrate the prospectivety of Erdene’s Khundii Gold District,” stated Mr. Akerley. “We are maintaining a dual focus on advancing our high-grade, open-pit, 60,000 ounce per year Bayan Khundii Gold Project to production, while drilling targets on adjacent prospects to grow our resource base.”
    Highlights [see attached figures for reference]:


    • Altan Nar (Gold-Polymetallic Resource):

      • Drilling expands high-grade core of the Discovery Zone:

        • 45.7 g/t gold, 93.4 g/t silver, 1.54% lead and 3.40% zinc over 7 metres beginning at ~ 70 metres vertical depth, within 23 metres grading 17 g/t gold (TND-135)
        • 12.2 g/t gold over 10 metres (TND-134) including 2 metres of 52.9 g/t gold confirming high- grade gold mineralization south of the “Gap Zone”
        • 10 metres of 4.68g/t (TND-138) confirming high-grade gold mineralization north of the “Gap Zone”


      • TND-136 confirms continuity of mineralization now open to the south


    • Khar Mori (Gold):

      • Rock chip samples of 87.8 g/t gold, 18.2 g/t gold, 15.3 g/t gold and 12.1 g/t gold near the 32.9 g/t gold rock chip collected in early Q4-2019
      • Geochemical sampling and mapping expand prospect area to 1.5km X 2km


    • Ulaan (Copper-Gold):

      • Gold bearing tourmaline breccia pipe intersected



    Q42019 Exploration Program Summary
    As the Bayan Khundii gold deposit advances through studies and permitting, the exploration team shifted focus in late 2019 to expanding resources throughout the District with follow up work on three priority targets: Altan Nar (Golden Sun), Khar Mori (Dark Horse) and the area surrounding the Bayan Khundii (Rich Valley) Deposit.
    Following a detailed review and modelling of the Discovery Zone deposit at Altan Nar, 16 km north of the Bayan Khundii gold development, the exploration team developed a plan to test a concept for a preferred gold mineralized horizon believed to represent an epithermal boiling zone that could host continuity of the very high grades intersected during the most recent drilling campaign in 2017. Additionally, the Khar Mori prospect identified earlier in Q4-2019 was expanded to a 1.5km X 2km zone with multiple high grade grab samples of up 89g/t gold, bordering the Altan Arrow prospect to the north where shallow drilling previously intersected up to 2 metres of 70 g/t gold.
    The focus of the exploration team in 2020 will be on expanding resources within these three highest priority areas including incorporating today’s results into a comprehensive review and interpretation program in advance of fieldwork in Q2-2020 and further drilling in mid-2020.
    Altan Nar Deposit
    In late Q4-2019, the company drilled five holes totaling 667 metres in the Discovery Zone (“DZ”), one of 18 high-priority targets along a 5.6 kilometre mineralized trend on its 100% owned Altan Nar project. The Q4-2019 program successfully tested a concept of a preferred high gold mineralized horizon believed to represent an epithermal boiling zone. Four holes tested the high-grade core area of the Discovery Zone, over a 130 metre strike length, 70 metres of which remains untested by drilling (“Gap Zone”). The fifth hole tested the southern extension of the deposit.

  • Erdene Resources mit der Veröffentlichung von oberflächennahen „Bonanza“ Bohrergebnissen
    aus der Zone Midfield Southeast in ihrem Goldprojekts Bayan Khundii, Mongolei.


    https://dltkyhzg7evud.cloudfro…ets/files/4202/epr_en.pdf



    5,5 Meter mit 126 g/t Gold, einschließlich 1 Meter mit 582 g/t Gold.


    15 Meter mit 26 g/t Gold, einschließlich 1 Meter mit 338 g/t Gold.



    Die Reaktion an der Börse in Toronto:


    0,5500+0,1150 (+26,44%)


    Ab 11:40AM EDT. Markt geöffnet.

  • Erdene mit der Veröffentlichung von sehr guten Bohrergebnissen mit oberflächennahem, hochgradigem Gold aus neu entdeckten Zonen in ihrer Goldlagerstätte Bayan Khundii in der Mongolei.


    https://dltkyhzg7evud.cloudfro…/bk_km_update_release.pdf


    Zusammengefasste Explorationsergebnisse:


    Striker Southwest Zone:


    BKD-290: 20 Meter mit 5,9 g/t Gold, einschließlich 1 Meter mit 91,2 g/t Gold.
    BKD-292: 15 Meter mit 29 g/t Gold, einschließlich 1 Meter von 353 g/t Gold
    BKD-297: 21 Meter mit 4 g/t Gold, beginnend an der Oberfläche, einschließlich 1 Meter-Abschnitten mit
    38,8 g/t Gold und 22,3 g/t Gold.


    Dark Horse Projekt (neues Projekt 3,5 km nördlich von Bayan Khundii):


    6 Meter mit 8,8 g/t Gold, einschließlich 1 Meter mit 50,8 g/t Gold.
    4 Meter mit 14 g/t Gold, einschließlich 1 Meter mit 45,3 g/t Gold.


    Übersetzt mit http://www.DeepL.com/Translator (kostenlose Version)

  • Eric Sprott beteiligt sich mit etwa 20 Millionen C$ an Erdene Resource Development.


    Erdene gehört damit auch zum illustren Kreis zahlreicher Beteiligungen von Eric Sprott im Minensektor.
    Mal sehen wer als nächster dazukommt. 8|


    https://dltkyhzg7evud.cloudfro…assets/files/4207/epr.pdf


    "Wir sind sehr erfreut, Herrn Sprott als einen bedeutenden Aktionär von Erdene zu haben", sagte Peter Akerley, Erdene's Präsident und CEO. "Mittel aus dieser Finanzierung wird dazu verwendet werden, frühe Bauarbeiten in Bayan Khundii einzuleiten und die Exploration fortzusetzen, um unsere hochgradigen Ressourcen zu erweitern".


    Übersetzt mit DeepL.com/Translator (kostenlose Version)

  • Die Finanzierung des Goldprojekts Bayan Khundii in der Mongolei scheint in greifbarer Nähe zu sein.
    Die erste Goldförderung ist für das Jahr 2022 vorgesehen. :rolleyes:


    https://dltkyhzg7evud.cloudfro…ets/files/4229/erd_pr.pdf


    Erdene Resource Development Corp. freut sich bekannt zu geben, dass es ein Mandatsschreiben mit Export Development Canada ("EDC") für eine vorrangig gesicherte Kreditfazilität von bis zu 55 Millionen US-Dollar zur Erschließung des Goldprojekts Bayan Khundii im Südwesten der Mongolei unterzeichnet hat.
    Die Finanzierung des Projekts durch EDC ist an den zufriedenstellenden Abschluss der Due-Diligence-Prüfung gebunden, die derzeit durchgeführt wird und voraussichtlich im zweiten Quartal 2021 abgeschlossen sein wird.


    Zitate des Unternehmens:


    "Die Ausführung des Fremdfinanzierungsmandats mit EDC ist ein wichtiger Meilenstein bei der Erschließung unseres hochgradigen Goldprojekts Bayan Khundii", sagte Peter Akerley, Präsident und CEO von Erdene.
    "EDC hat viele Unternehmen bei der Entwicklung von Bergbauprojekten auf internationaler Ebene, einschließlich in der Mongolei, unterstützt.
    Die Beteiligung der EDC sowie unseres Hauptaktionärs, der Europäischen Bank für Wiederaufbau und Entwicklung, wird dazu beitragen, dass das Projekt nach den höchsten Umwelt- und Sozialstandards entwickelt wird und den mongolischen und internationalen Interessengruppen Vorteile bringt.
    Die Bauvorbereitungsarbeiten sind im Gange, da wir versuchen, rasch von der Konstruktion zur Produktion überzugehen, wobei die Detailkonstruktion, die Zeitplanung und die Beschaffungsabläufe gut vorangekommen sind", fuhr Herr Akerley fort. "Gleichzeitig konzentriert sich das Unternehmen auf die Erweiterung der Ressourcen in unserem gesamten Goldgebiet Khundii, da wir das erste Gold im Jahr 2022 anpeilen."


    Übersetzt mit http://www.DeepL.com/Translator (kostenlose Version)

  • Erdene Resource Development Corporation mit der Entdeckung mehrerer hochgradiger oberflächennaher Abschnitte, die an die geplante Open Pit Mine Bayan Khundii in der Mongolei angrenzen.


    https://dltkyhzg7evud.cloudfro…assets/files/4233/epr.pdf


    Hochgradige Goldabschnitte in einer neuen Zone bei Striker West, 200 Meter westlich von Bayan Khundii:


    BKD-334: 28 Meter mit 2,5 g/t Gold, einschließlich 1 Meter mit 36,9 g/t Gold innerhalb von 14 Metern mit 4,5 g/t Gold.


    BKD-338: 38 Meter mit 1,8 g/t Gold, einschließlich 1 Meter mit 23,3 g/t Gold innerhalb von 9 Metern mit 5,5 g/t Gold.


    BKD-339: 54 Meter mit 1,2 g/t Gold, einschließlich 1 Meter mit 13,1 g/t Gold.


    Eine tiefere Zone wurde südlich und unterhalb von Striker West durchschnitten, was die Kontinuität der früheren Entdeckung (BKD-266) unterstreicht:


    BKD-341: 4 Meter mit 4,7 g/t Gold, einschließlich 1 Meter mit 17,0 g/t Gold.


    Flache, hochgradige Erweiterungen südlich und östlich der Zone Striker South:


    BKD-315: 3 Meter mit 5,0 g/t Gold, einschließlich 1 Meter mit 14,0 g/t Gold, beginnend bei 37 Metern,


    BKD-316: 5 Meter mit 4,7 g/t Gold, einschließlich 1 Meter mit 21,7 g/t Gold, beginnend bei 13 Metern,


    Kontinuität der Goldmineralisierung entlang der 200-Meter-Struktur im südöstlichen Bereich:


    BKD-319: 18,2 Meter mit 2,9 g/t Gold, einschließlich 1-Meter-Abschnitten mit 14,5 g/t Gold und 28,9 g/t Gold, beginnend bei 2,8 Metern.


    BKD-322: 7 Meter mit 5,2 g/t Gold, einschließlich 1 Meter mit 23,5 g/t Gold, beginnend bei 3 Metern.


    "Die jüngsten Bohrungen haben die goldmineralisierten Zonen über die Gruben- und Ressourcengrenzen hinaus an mehreren Standorten erweitert und bestätigen das Potenzial zur Erweiterung der Ressourcen auf unserem Goldprojekt Bayan Khundii, vor allem in der Zone Striker West", sagte Peter Akerley, President und CEO von Erdene. "In Verbindung mit den bereits zuvor gemeldeten Bohrergebnissen für das Jahr 2020 aus den hochgradigen Zonen Midfield South East, Midfield North und in der Zone Striker South, die sich am Rande der bestehenden hochgradigen Reserven befinden, haben wir eine Mineralisierung durchschnitten, die die Gesamtmenge an Gold beträchtlich erhöhen sollte."


    Übersetzt mit http://www.DeepL.com/Translator (kostenlose Version)

  • Gute Neuigkeiten!



    Erdene Announces New Gold Discovery 3.5 km North of the Bayan Khundii Gold Deposit


    https://www.globenewswire.com/…Khundii-Gold-Deposit.html


    Highlights:

    • Neue hochgradige, oberflächliche Goldentdeckung, die in einer 4 Kilometer langen Struktur im westlichen Teil von Dark Horse beherbergt ist, zeigt das Potenzial für bedeutende Goldentdeckungen in der Nähe der Lagerstätte Bayan Khundii:

      • AAD-58 ergab 45 Meter mit 5,97 g/t Gold, beginnend in 10 Metern Bohrlochtiefe, einschließlich 1 Meter mit 82,5 g/t Gold innerhalb von 8 Metern mit 27,1 g/t Gold
      • AAD-57, 180 Meter nördlich von AAD-58 gelegen, ergab 16 Meter mit 0,6 g/t Gold, beginnend in 52 Metern Tiefe, und 48 Meter mit 1,2 g/t Gold, beginnend in 194 Metern Tiefe, einschließlich 30 Meter mit 1,7 g/t Gold
      • AAD-51, das einen Kilometer nördlich von AAD-57 niedergebracht wurde, ergab 3 Meter mit 5,6 g/t Gold, beginnend in 138 Metern Bohrlochtiefe, und 10 Meter mit 0,9 g/t Gold, beginnend in 222 Metern Bohrlochtiefe
      • Die Ergebnisse von AAD-61, das 500 Meter nördlich von AAD-57 entlang desselben Mineralisierungstrends gebohrt wurde, und von AAD-60, das 750 Meter nordöstlich (NE) entlang der nach NE verlaufenden Hauptstruktur Dark Horse gebohrt wurde, stehen noch aus.
    • Die Goldmineralisierung steht in Zusammenhang mit einer Nord-Süd (N-S) verlaufenden Struktur, die durch ihre geringe magnetische Signatur, lokale Aufschlüsse von epithermalen Brekzien und Stockwork-Adern sowie Goldanomalien im Boden gekennzeichnet ist

      • AAD-57 und 58 befinden sich am Schnittpunkt der N-S-Struktur und der nach Nordosten verlaufenden Dark-Horse-Strukturen mit damit verbundenen großen magnetischen Tiefstwerten und hohen IP-Aufladbarkeitsanomalien, ähnlich wie bei Bayan Khundii
      • Die Goldressource Bayan Khundii2 umfasst 521.000 Unzen mit 3,16 g/t Gold als gemessene und angezeigte ("M&I")3 und 103.000 Unzen abgeleitete Ressourcen mit 3,68 g/t Gold
    • Ein umfangreiches Explorationsprogramm ist für Q1 2021 geplant, um diese aufregende Entdeckung weiter zu verfolgen

    "Glück ist, was passiert, wenn Vorbereitung auf Gelegenheit trifft."
    Lucius Annaeus Seneca (1 - 65 n. Chr.)

  • Erdene Resource expects construction decision for Bayan Khundii by mid-2021

    Editor's Note: With so much market volatility, stay on top of daily news! Get caught up in minutes with our speedy summary of today's must-read news and expert opinions. Sign up here!
    [Blockierte Grafik: https://www.kitco.com/news/2021-03-15/images/Mining_Trucks.png](Kitco News) - Erdene Resource Development (TSX:ERD; MSE:ERDN) announced today that the company recorded a net loss of $13,116,358 for the year ended December 31, 2020, compared to a net loss of $2,683,292 for the year ended December 31, 2019.
    Exploration and evaluation expenditures, including capitalized expenditures, totaled $9,276,028 for the year ended December 31, 2020, compared to $6,694,914 for the year ended December 31, 2019, largely due to increased exploration work as the company drilled over 15,000 metres in the current year, compared to approximately 5,000 metres in the prior year. Additionally, expenditures on the Bayan Khundii Feasibility Study, Detailed Engineering and Design and Construction Readiness activities exceeded those on the Prefeasibility Study in the prior year.
    "Despite the impact of COVID-19 on the global economy over the past year, our company made significant progress executing on our two-pronged strategy of advancing the Bayan Khundii gold project towards development while expanding high-grade gold resources in our Khundii Gold District," said Peter Akerley, Erdene's President and CEO.
    "Based on the strong economics of the high-grade, open-pit, BK gold project, outlined in the Feasibility Study delivered in August, we have commenced project finance and construction readiness," continued Mr. Akerley. "In October we signed a mandate letter with Export Development Canada to provide the majority of the capital required to build the mine and due diligence is progressing well. Construction readiness activities including detailed engineering continues as we seek to fast track this foundational project. A construction decision is expected in mid-2021, contingent upon the impact of the COVID-19 pandemic."
    Erdene Resource Development's deposits are located in southwestern Mongolia's Edren Terrane, within the Central Asian Orogenic Belt, host to some of the world's largest gold and copper-gold deposits. The company has been the leader in exploration in the region over the past decade and is responsible for the discovery of the Khundii Gold District with interests in three mining licenses and two exploration licenses hosting multiple high-grade gold and gold/base metal prospects.


    https://www.kitco.com/news/202…-Khundii-by-mid-2021.html

  • ERD ist vorgestern mit einer ersten Position ins Depot gewandert. Wenn Sprott für 0,45$ einsteigt, bereitet es mir ein besonderes Vergnügen dies für 0,395$ getan zu haben. Die Zahlen aus der BFS sind sehr schön und die CAPEX niedrig......für Open Pit hohe Grades....Konstuktionsbeginn dieses Jahr ........Produktionsbeginn in 2022....Explorationspotential open Sky als First Mover......die Mongolei sehe ich nicht kritischer wie Südamerika....


    BG

  • Kleiner Tip: das Ganze würde es auch als Investment in einen Producer - nämlich STEPPE GOLD - geben !!.... wie man sieht sind die Marktkapitalisierungen gleich, jedoch hat man bei Steppe Gold ein deutliches De-Risking, da eine fertige Mine mit 50-60 kOZ p.a. nette Gewinne und cash-flows von 12,5m$/Quartal produziert.


    Dazu einen Wachstumsplan der mit diesem Cash-Flow die Produktion ab 2022 auf 150kOZ hochfährt.


    Das Ganze übrigens zu AISC unter 800 US$. Schaut euch auch mal die Präsentation mit den Bildern in der Verarbeitungsanlage an... feinste Geräte, aufgeräumte Halle, klare Laufwege usw. sieht aus wie feinster Schweizer oder Deutscher Anlagenbau - aber Hallo !


    Ehrlich gesagt ist mir deren Marktkapitalisierung völlig schleierhaft - die produzieren in wenigen Jahren mehr free-cash flow p.a. als deren Börsenwert. Wird vermutlich nicht mehr lange so bleiben.

  • Das sehe ich genauso. Von Steppe Gold erwarte ich mir auch noch sehr viel. Darum habe ich sie auch bei den Minenperlen.


    Aber Erdene mit diesen sehr hohen Open-Pit Graden ist ebenfalls ein Investment wert. Ich denke dass es da jede Menge Upside-Potenzial in Sachen Produktionsausweitung über die nächsten Jahre geben wird.

    Nun fingen einige an, ihn anzuspeien, ihm das Gesicht zu verhüllen, ihn dann mit der Faust zu schlagen und zu ihm zu sagen: »Weissage uns!« Auch die Gerichtsdiener versetzten ihm bei der Übernahme Schläge ins Gesicht.


    Markus-Evangelium Kapitel 14, Vers 65


    https://t.me/EnergiekriseMitochondrien


  • Moin moin,


    Erdene gehört mit 8% auch zu den großen Positionen in meinem Depot.
    Bei 0,32/0,33 C$ dürfte das Tief gewesen sein. Jetzt schleppt sich der Kurs langsam nordwärts.
    Dabei gab es gelegentlich Sprünge bis auf 0,39 C$. Kurs 0,36 C$, Marktkap. knapp 97 Mio. C$.


    Der CEO von Erdene Res. sieht die Entwicklung wie von @Nebelparder in Beitrag 33 beschrieben.



    Mr. Peter Akerley, Developing the high-grade Khundii Gold District “PDAC 2021”


    Externer Inhalt youtu.be
    Inhalte von externen Seiten werden ohne Ihre Zustimmung nicht automatisch geladen und angezeigt.
    Durch die Aktivierung der externen Inhalte erklären Sie sich damit einverstanden, dass personenbezogene Daten an Drittplattformen übermittelt werden. Mehr Informationen dazu haben wir in unserer Datenschutzerklärung zur Verfügung gestellt.


    Das Video ist vom 07.04.21
    Er weist in dem Video auf die Multimillionen Funde in der Region hin. Niedrige Kapex von 59 Mio. US$. Start Bau ab Q3/2021 und erste Goldproduktion Ende 2022.


    Problem ist die Wasserknappheit. Deshalb soll 85% des Wassers recycelt werden. Neben einem Dieselaggregat sollen auch Solarzellen die Mine mit Strom versorgen. Das muss zur Zeit wohl so sein. Die Mongolei ist dünn besiedelt und die Rohstoffgewinnung der wichtigste Wirtschaftszweig. Der Ausbildungsstand der Bevölkerung ist hoch. Da viele Rohstoffe nach China geliefert werden ist die Infrastruktur sehr viel besser geworden. Man ist seit 15 Jahren in dem Land und pflegt gute Beziehungen zu Behörden und Bevölkerung.


    Am 20.05. ist die nächste Investorenkonferenz "Metals Investor Forum"
    Vermutlich gibt es dann auch eine neue Präsentation.


    Erdene ist seit langem unter dem Radar und es ging trotz guter Nachrichten abwärts. Das könnte sich mit dem steigenden Goldpreis ändern.
    Risiko ist eine deutlich höhere Kapex wegen der Preissteigerungen bei den Rohstoffen und Baumaterialien.



    LG Vatapitta

    • Offizieller Beitrag

    Erwähnenswert wären noch die tiefen AISC von 733 $ / oz, wohl dank der hohen open-pit Grade von 3.5 g/t und mehr! Im Lichte der grossen noch unerforschten Gebiete kann man wirklich sagen, dass die unter dem Radar der EM-Investoren fliegen...


    Und Kupfer sowie Molybdän liegt auch im Boden.


    Zusammen mit STEPPE bin nur mit 3 % Depotwert investiert, aber ich denke an aufstocken bei ERD.


    LF

    "Das einzige Geld, auf das ich mich verlassen kann, ist das Gold, das ich besitze" J.Sinclair
    "Omikron ist die Impfung, die herzustellen man verpasst hat" Lungenfacharzt in Uganda
    "The whole game is rigged" Gerald Celente

  • Moin moin,


    Erdene war eine meiner größten Positionen und hat sich relativ zu anderen gut gehalten. Dadurch ist der Depotanteil von 8 auf 9% gestiegen.


    Gestern habe ich den Anstieg genutzt, um den Bestand auf 22% der ursprünglichen Positionsgröße zu reduzieren.
    Der Verkauf in Toronto war problemlos möglich. Der Ausstieg war etwa zum Kaufkurs.



    Begründung: Die Timeline des Projektes verschiebt sich immer weiter in die Zukunft. Anstelle 2022 steht jetzt dort 2023 oder eventuell 2024.


    Ich erwarte, das ein Management tut, was es sagt und bei Abweichungen davon stichhaltige Begründungen liefert. Die von mir gewünschte Transparenz ist nicht ausreichend gegeben.



    Der Teufel scheißt immer auf den größten Haufen. - Die großen Kapitalgeber sind eher bereit große Projekte zu finanzieren, so dass ich mich in die Richtung orientieren möchte. (OSK, SBB, MOZ, GBR, NFG - mal schauen)


    Es kommen auch die starken Royaltys FNV oder WPM (OR?) in Frage, die sich gut gehalten haben.
    Als eine Alternative außerhalb des Euro/Dollarraumes sehe ich die Sberbank, die für große Investitionen in den russischen Rohstoffsektor und die russische Wirtschaft steht und eine hohe Dividendenrendite hat.


    Explorer und Developer werden in Zukunft eine kleinere Positionsgröße im Depot haben - bis ca. 2%.



    LG Vatapitta

  • Moin moin,


    aus den Q2 Zahlen kann man entnehmen, dass ERD am 30.06.21 noch ca. 7,5 Mio.$ Cash hat.


    Ab Q4/2021 soll sich in Sachen Entwicklung der Mine etwas tun.


    Im ersten Halbjahr wurden ca. 5,3 Mio. $ Cash verbraucht.
    Cash am 10.08.21 - 6,1 Mio. C$
    Erd hat fleißig weiter und erfolgreich explodiert


    Präsentation Q3/21
    Die Bauzeit für die Mine soll 1,5 Jahre betragen und der erste Goldguss in Q1/2023 sein.


    Wenn man im zweiten HJ 2021 5 Mio. $ ausgibt, ist die Kassenlage sehr angespannt.
    Ich vermute deshalb, dass demnächst eine Kapitalerhöhung kommt.
    Aktuell gibt es geringe Insiderkäufe, aber keine Verkäufe.


    Mit den neuen Funden, sollte der Minenplan besser aussehen.
    Die Zahlen sind vermutlich sowohl bei den Assets als auch bei den Kosten veraltet.


    Es gibt schon länger eine Kreditzusage für den Minenbau.


    Kurs 0,385 C$, Marktkap. 106 Mio. C$, Shares 275,2 Mio., Options und Warrants 62 Mio.



    Meine Einschätzung:
    Ich vermute, dass in Kürze eine Kapitalerhöhung für den laufenden Betrieb kommt.
    Wenn sie geschickt sind, gibt es vorher neue Feability Studie.


    Das Projekt könnte auf Grund gestiegener Preise und langer Lieferzeiten nicht mehr rentabel sein.
    Der Aufwand für den Minenbau für eine durchschnittliche Produktionsmenge von ca. 64.000 oz/Jahr ist beträchtlich.
    Für die Bauzeit rechne ich mit zwei Jahren. Bei Beginn in Q1/2022 gäbe es das erste Gold in Q1/2024.


    Das Risiko des aktuellen Marktumfeldes übersteigt m. E. die Chancen.
    Das ändert sich mit deutlich steigendem Goldpreis.
    Lohnt sich ein Halten von ERD im Vergleich mit einer produzierenden Mine?
    Nein!


    Ich denke noch mal darüber nach, ob ich die restliche Miniposition lieber verkaufe. [smilie_denk]


    LG Vatapitta

  • Moin, Dank an Vatapitta für die Einschätzung.
    Tja, das Prob...sinkende EM Preise und steigende Kosten/Lieferzeiten dürfte speziell bei den Developern zu Tage treten. Wenn sich hier nicht bald bei EM was nach oben tut - dürfte es die ersten Ausfälle geben.
    Q3 dürfte aber auch für den Rest nicht der Überflieger werden. Hoffen wir mal alle auf steigende EM Preise (mehr als Kosten) für Q4 ff.
    Hier das letzte Video von Crux mit Erdene.
    Selbst noch nicht gesehen, aber was ich aus vielen Vids gelernt habe - da scheint immer nur die Sonne für die CEO´s. Zwischen den Zeilen hören - hab ich noch nicht so richtig gelernt. (bin selbst mit ner Minipos. dabei)


    [Blockierte Grafik: https://invst.ly/w8l5g]
    https://invst.ly/w8l5g


    Nachtrag 1: in Sachen C drehen die in Mogolei auch ziemlich am Rad/durch...na ja, kein Wunder bei der hohen Bev.dicht.
    Steppe Gold (bin auch drinne) hats ja auch ziemlich zerrissen, TRQ (Kupfer) ist auch nicht der Burner

    Faktenfrei ist Absurdistan spätestens seit 2011 - dann wurde es bekloppt und nun geisteskrank. Und nein, Klopapier ist nicht erst seit kurzem Mangelware. Denn wie jeder weiss und sieht, wischt sich die ReGIERung spätestens seit 2015 mit dem GG den Arsch ab.
    Grenzen zu - Regale leer - Willkommen in der DDR. [Ruinen schaffen ohne Waffen]

    2 Mal editiert, zuletzt von HansE () aus folgendem Grund: typos

  • Selbst noch nicht gesehen, aber was ich aus vielen Vids gelernt habe - da scheint immer nur die Sonne für die CEO´s. Zwischen den Zeilen hören - hab ich noch nicht so richtig gelernt. (bin selbst mit ner Minipos. dabei)

    Oh danke, @HansE!


    ein schöner Chart. Die Position handelt immer noch um meinen Einstand. Da habe ich Glück gehabt. Und Erdene ist sicher kein schlechtes Unternehmen.


    Die Aufgabe eines CEO oder beliebigen anderen Unternehmenschefs ist es "die Sonne scheinen zu lassen". Das dient bei Developern/Explorern der ohnehin schwierigen Finanzierung. Vor allem ist es auch notwendig bei der Motivation der Mannschaft:innen. :D
    Es geht ja auch durchaus voran, z.B. bei der Exploration und es macht Null Sinn über die Probleme = Aufgaben die zu lösen sind, zu lamentieren. Die Probleme hat Erdene nicht selber zu vertreten. Insoweit ist mein Posting Nr. 37 nicht richtig.


    Der Vergleich mit Steppe zeigt welches Unternehmen besser positioniert ist. Dort steht die Verarbeitungsanlage. Man produziert seit 2020 Gold, ca. 50.000 oz/im Jahr und möchte die Menge verdreifachen. Der Cashflow soll in die Erweiterung gesteckt werden. Man benötigt dafür nur etwas (?) zusätzliches Kapital.
    Steppe hatte Glück rechtzeitig vor C und Teuerung und Problemen mit derLieferkette mit dem Bau der Mine fertig zu werden. Zu alledem ist die Marktkap. von Steppe niedriger - wie Grades - als bei Erdene.
    Deshalb sind sowohl Steppe als auch z. B. DPM oder eine Royaltie m. E. die bessere Wahl.
    Nur darum ging es mir bei der Betrachtung von Erdene. Vor allem kurzfristig sehe ich wegen der anstehenden Finanzierung Probleme, die andere eben nicht haben.


    Meine wichtigste Frage bei der Betrachtung von Erdene war, was noch in der Kasse ist.


    Und da gibt es Besseres. Also werde ich konsequent sein.



    LG Vatapitta