Erste Ergebnisse des neuen Bohrprogramms - die Zuverlässigkeit setzt sich fort:
Marathon Gold Reports First 2021 Exploration Drill Results from the Valentine Gold Project, NL
TORONTO, March 11, 2021 (GLOBE NEWSWIRE) -- Marathon Gold Corporation (“Marathon” or the “Company”; TSX: MOZ) is pleased to report results from the first drill holes completed under the 2021 exploration program at the Valentine Gold Project, central Newfoundland (the “Project”). These latest results represent fire assay data from seven drill holes located within the 1.5 kilometre long Berry Zone. Highlights include:
- VL-20-956 intersected 6.57 g/t Au over 22 metres including 29.68 g/t Au over 3 metres;
- VL-20-957 intersected 3.93 g/t Au over 21 metres including 37.90 g/t Au over 1 metre, and 12.35 g/t Au over 1 metre and 11.54 g/t Au over 1 metre, and 9.21 g/t Au over 7 metres including 29.17 g/t Au over 2 metres, and 8.65 g/t Au over 2 metres including 11.61 g/t Au over 1 metre;
- VL-20-955 intersected 14.93 g/t Au over 3 metres including 43.70 g/t Au over 1 metre;
- VL-20-958 intersected 1.75 g/t Au over 12 metres including 15.48 g/t Au over 1 metre; and
- VL-20-953 intersected 0.92 g/t Au over 24 metres;
Gruß
KPO