    Macro Update
    Mike Kozak Associate: Kate Nakagawa
    mike.kozak@cantor.com kate.nakagawa@cantor.com
    (416) 350-8152 (416) 849-5001
    Sales/Trading — Toronto: (416) 363-5757, (866) 442-4485
    See disclosure and a description of our recommendation structure at the end of this report.
    Equity Research
    URANIUM MACRO UPDATE
    2023 Uranium Outlook



    EVENT
    With U.S. conversion capacity set to come back on-
    line mid-year, in our view, this will create the
    dynamic of normalizing UF6 and SWU prices (both
    of which more than doubled last year) with the more
    substantial price gains finally cascading down the
    nuclear fuel cycle to mined uranium oxide (U3O8).
    BOTTOM LINE
    Positive – We expect the main uranium theme
    coming out of 2023 will be the transition from
    “underfeeding” to “overfeeding” at the enrichment
    level. By our estimation, this adds the equivalent of
    ~20 MMlb U3O8 in new demand at a minimum
    relative to a ~180 MMlb U3O8 steady-state market.
    FOCUS POINTS
    ▪ U3O8 Prices Set to Gain in 2023 – Conversion
    (UF6) was the bottleneck in the nuclear fuel
    cycle in 2022. With ConverDyn (Illinois) set to
    restart mid-year, the additional UF6 supply
    should then enable western-allied enrichment
    facilities to overfeed. We have already heard
    reports of new long-term enrichment contracts
    being signed by utilities with a higher specified
    tails assay, supportive of our thesis.
    ▪ Higher Prices May Come Fast – Against this
    positive backdrop (underfeeding → overfeeding
    enabled by new UF6 supply thereby driving
    greater U3O8 demand) we note the Sprott
    Physical Uranium Trust has regained its
    NAVPU premium. Spot market volumes
    remain exceedingly thin, and if/when U.U re-
    enters the market, we expect the U3O8 price
    action will likely be meaningfully higher and fast.
    ▪ Uranium Equities – The uranium equities
    underperformed the U3O8 price by ~35% in the
    last year. We believe this will revert in 2023,
    setting up an excellent “catch-up” trade.

    Dateien

    Dies irae | Money is made in the DELTA between PERCEPTION and REALITY


    Alle Mitteilungen in diesem Forum sind als
    reine private Meinungsäußerung zu sehen und keinesfalls als
    Tatsachenbehauptung. Hier gilt Artikel 5 GG und besonders Absatz 3
    Dieser Beitrag ist eine persönliche Meinung gem. Art.5 Abs.1 GG und Urteil des BVG 1 BvR 1384/16

  • Anfield Energy bietet 2022 Corporate Review und Pläne für 2023


    9. Januar 2023
    VANCOUVER, British Columbia, 09. Januar 2023 - Anfield Energy Inc. (TSX.V: AEC; OTCQB: ANLDF; FRANKFURT: 0AD) ("Anfield" oder "das Unternehmen") freut sich, eine Unternehmensüberprüfung von 2022 vorzulegen und seine Pläne für 2023 zu besprechen. Anfield setzt seinen Fortschritt auf dem Weg zu einem kurzfristigen Uran- und Vanadiumproduzenten in den USA fort und wird durch die Marktentwicklungen von 2022 gefördert.
    Die folgende Liste hebt die Erfolge des Unternehmens im Jahr 2022 hervor:
    Verhandelt und abgeschlossene Aufhebung der von der Uranium Energy Corporation (UEC) gehaltenen Schulden
    Nach der Übernahme der 18-Millionen-Dollar-Schuldenverpflichtung von Anfield durch die UEC von Uranium One Americas - einer Tochtergesellschaft der russischen staatlichen Einheit Rosatom - verhandelte Anfield mit der UEC eine Schuldenregulierung, um die Schulden durch eine Kombination aus Bargeld und Eigenkapital zu löschen. Infolgedessen wurde die UEC der größte Einzelaktionär von Anfield - der 15% der Stammaktien von Anfield hielt - und erhielt etwa 9 Millionen US-Dollar in bar. Die Beseitigung des Schuldenüberhangs ermöglicht es Anfield, seine Vermögenswerte, einschließlich der Shootaring Canyon-Mühle, auf dem Weg zur Uran- und Vanadiumproduktion voranzutreiben.
    Über 22 Millionen Dollar Eigenkapital gesammelt - einschließlich eines gekauften Deals im Wert von 15 Millionen Dollar -, um sowohl die Schuldenregulierung als auch den Vermögensvorschuss zu finanzieren
    Im Rahmen der UEC-Transaktion sammelte Anfield etwa 15 Millionen Dollar durch einen Aktienkaufvertrag - die bisher größte Einzelaktienerhöhung von Anfield -, der dem Unternehmen ausreichende Mittel zur Verfügung stellte, um sowohl seine Abrechnungszahlung in Höhe von 9 Millionen US-Dollar an die UEC zu leisten als auch zusammen mit einer Anfang des Jahres abgeschlossenen Privatplatzierung in Höhe von 7,65 Millionen US-Dollar die Förderung seiner Uran- und Vanadiumanlagen zu finanzieren.
    Tauschte ISR-Vermögenswerte gegen einen konventionellen Uran/Vanadium-Vermögenswert, um das Portfolio an einer Hub-and-Spoke-Strategie auszurichten, die von der Shootaring Canyon-Mühle untermauert wird
    Neben der Schuldenregulierungstransaktion mit UEC schloss Anfield auch eine Swap-Vereinbarung mit UEC ab, um die in Wyoming ansässigen ISR-Immobilien des Unternehmens gegen den in Colorado ansässigen konventionellen Slick Rock-Asset der UEC auszutauschen. Dieser Vermögenswert verbessert in Kombination mit dem in Utah ansässigen Velvet-Wood-Projekt und dem in Colorado ansässigen West Slope-Projekt den robusten, langfristigen Hub-and-Spoke-Produktionsplan von Anfield, der von Anfields hundertprozentiger Shootaring Canyon-Mühle untermauert wird, erheblich.
    Begrüßte Herrn Kenneth Mushinski als Vorsitzender des Anfield Board
    Im September 2022 gab Anfield bekannt, dass es Herrn Kenneth Mushinski zu seinem Vorsitzenden ernannt hatte. Herr Mushinski bringt über seine 33-jährigen Führungspositionen bei der General Atomics Corporation und ihren verschiedenen Tochtergesellschaften eine Fülle von Erfahrungen aus der Kern- und Uranindustrie in den Vorstand ein. Zu seinen Aufgaben gehörten die Identifizierung, Verhandlung und Durchführung von Fusionen und Übernahmen, die operative und finanzielle Planung von Uranoperationen, einschließlich Verkauf, Marketing und Vertragsvergabe, Budgetierung und Terminplanung sowie regulatorische Angelegenheiten, einschließlich staatlicher Interaktionen, Lizenzierung, Genehmigung von Rückforderung und Stilllegung. Diese umfassende Erfahrung auf hohem Niveau wird Anfield gut dienen, da es sowohl die kurzfristige Uran- und Vanadiumproduktion als auch das weitere Wachstum des Vermögensportfolios weiter verfolgt.
    Erhielt eine Schätzung der Uran- und Vanadiumressourcen von NI 43-101 für vier von neun früher produzierenden Minen, die das West Slope Project umfassen
    Das Unternehmen beauftragte BRS, Inc., ein Ingenieurbüro, einen NI 43-101-Ressourcenbericht für vier der neun Minen zu erstellen, aus denen das West Slope-Projekt in Colorado besteht. Der Bericht skizzierte eine Uranressource von etwa 5 Millionen Pfund und eine Vanadiumressource von etwa 27 Millionen Pfund. Der nächste Schritt für das Unternehmen besteht darin, BRS eine vorläufige wirtschaftliche Bewertung des Projekts durchführen zu lassen, um seine wirtschaftliche Lebensfähigkeit zu bestätigen.
    Erworbener und erweiterter Artillery Peak mit Sitz in Arizona behauptet, die bestehenden Date Creek Basin-Bestände von Anfield zu ergänzen
    Das Unternehmen erwarb eine 100%ige Beteiligung an 50 nicht patentierten Bergbauansprüchen und stellte weitere 54 Ansprüche in das uranreiche Artillery Peak-Projektgebiet, die an Anfields aktuelle Immobilien im Date Creek Basin angrenzen. Anfield hat auch BRS, Inc. beauftragt, einen NI 43-101-Ressourcenbericht für seine kombinierten Date Creek Basin/Artillery Peak-Projekte zu erstellen. Dieses kombinierte Projekt wird Teil der zweifachen Strategie von Anfield sein, da es eine sekundäre Produktionspipeline darstellen wird, um die Kernproduktionspipeline von Anfield zu ergänzen, die aus den Projekten Velvet-Wood, West Slope und Slick Rock besteht.
    Engagierte Precision Systems Engineering, um einen Reaktivierungsplan für die Shootaring Canyon Mill bereitzustellen
    Im November 2022 gab Anfield bekannt, dass es Precision Systems Engineering (PSE), ein in Utah ansässiges Ingenieurbüro, beauftragt hatte, einen Reaktivierungsvorschlag für die Shootaring Canyon-Mühle abzuschließen. Der Vorschlag, der voraussichtlich im zweiten Quartal 2023 abgeschlossen sein wird, wird eine detaillierte Studie der bestehenden Anlage und des Urankreislaufs sowie einen vorläufigen Entwurf eines neuen Vanadiumkreislaufs und detaillierte Kostenschätzungen im Zusammenhang mit der vollständigen Reaktivierung der Mühle umfassen. PSE wird auch den Ausrüstungsbeschaffungsprozess im Auftrag des Unternehmens verwalten, um den Übergang zum Produktionsneustart zu erleichtern. Dies ist ein kritisches Unterfangen von Anfield, da diese Arbeit den letzten erforderlichen technischen Schritt vor der tatsächlichen physischen Sanierung der Mühle darstellt.
    Katalysatoren für 2023
    Aktualisierte vorläufige wirtschaftliche Bewertungen für Velvet-Wood-, West Slope- und Slick Rock-Projekte
    Anfield erwartet, eine aktualisierte vorläufige wirtschaftliche Bewertung (PEA) für Samtholz mit einer Vanadium-Ressource herauszugeben, die aufgenommen werden soll. Sein vorheriges PEA, das 2016 ausgegeben wurde, enthielt trotz der historischen Produktion von etwa 4 Millionen Pfund Uran und 5 Millionen Pfund Vanadium in der Mine keine Vanadium-Ressource. Darüber hinaus hat Anfield BRS, Inc. beauftragt, sowohl eine erste PEA für das West Slope-Projekt - im Zusammenhang mit dem 2022 veröffentlichten Ressourcenbericht - als auch eine PEA für das Slick Rock-Projekt abzuschließen. Diese PEAs sind entscheidend für die Hub-and-Spoke-Strategie von Anfield, da wir erwarten, dass sie den erheblichen inhärenten Wert und die Attraktivität der kurzfristigen Uran- und Vanadium-Produktionspipeline des Unternehmens unterstreichen.
    Abschluss des PSE-Reaktivierungsberichts
    Der PSE-Bericht wird voraussichtlich im zweiten Quartal 2023 abgeschlossen sein. Zu diesem Zeitpunkt sollte Anfield eine vollständige Buchhaltung über die Kosten und den Zeitpunkt im Zusammenhang mit der Reaktivierung der Shootaring Canyon-Mühle, einschließlich der neuen Vanadium-Schaltung, haben. Nachfolgende Schritte im Zusammenhang mit der Beschaffung von Ausrüstung werden ebenfalls nach der Berichterstattung stattfinden.
    Förderung von Sekundäranlagen zur NI 43-101-Ressource
    Anfield hat die Artillery Peak-Ansprüche in Arizona sowie die Marysvale- und Calf Mesa-Projekte in Utah erworben. Anfield wird mit den Arbeiten an beiden Anlagen beginnen, um eine NI 43-101-Ressource abzugrenzen, die neben der bestehenden Frank M-Mine des Unternehmens in Utah und dem Findlay Tank Breccia-Rohrprojekt in Arizona als potenzielle sekundäre Uranressource für seine Produktionspipeline dienen wird.
    Erwerb von Uran- und Vanadium-Vermögenswerten
    (gekürzt)



    https://anfieldenergy.com/2023…eview-and-plans-for-2023/

  • enCore Energy Corp. (TSXV:EU)




    10. Januar 2023


    enCore Energy Corp. (TSXV:EU, KAUFEN, 8,25 C$ Ziel, David A. Talbot)


    gab bekannt, dass die Übernahme des In-situ-Recovery-Projekts (ISR) von Alta Mesa bis zum 15./23. Februar abgeschlossen werden soll, vorbehaltlich der endgültigen Börsengenehmigung. Das Unternehmen hat eine endgültige Vereinbarung mit Energy Fuels Inc. unterzeichnet. (TSX:EFR, KAUFEN, 15,60 C$ Ziel, David A. Talbot) erwarb Alta Mesa für 120 Millionen US-Dollar, die 60 Millionen US-Dollar in bar und 60 Millionen US-Dollar über einen Schuldschein enthielten, mit einer zweijährigen Laufzeit von 8%. Wir sehen die Akquisition positiv, da sie eine dritte voll lizenzierte und gebaute ISR-Anlage mit einer Kapazität von 1,5 Millionen Pfund U3O8 p.a. zu ihren bestehenden Rosita- und Kingsville Dome-Anlagen hinzufügt, was die jährliche Gesamtverarbeitungskapazität in Texas auf 3,6 Millionen Pfund U3O8 erhöht. Nach dem Schließen erhöht enCore seine gesamte Mineralressource um ~20% und fügt ~20M lb U308 zu ~100M lb U308 hinzu (lesen Sie mehr). In der Zwischenzeit erwarten wir, dass der Fokus weiterhin auf die Weiterentwicklung seiner 100%igen 800ktpa U3O8 Rosita Central Uran ISR-Verarbeitungsanlage in Texas konzentrieren wird, die voraussichtlich im zweiten Quartal mit der Produktion beginnen wird. weiterlesen



    https://redcloudresearch.com/e…p-tsxveu-notable-news-24/

  • 10-seitiger haywood uranium weekly market report
    UxJan122023.pdf



    16-seitiger eight capital report zu fuu
    FUU011223.pdf











    bg bh

    Dies irae | Money is made in the DELTA between PERCEPTION and REALITY


    Alle Mitteilungen in diesem Forum sind als
    reine private Meinungsäußerung zu sehen und keinesfalls als
    Tatsachenbehauptung. Hier gilt Artikel 5 GG und besonders Absatz 3
    Dieser Beitrag ist eine persönliche Meinung gem. Art.5 Abs.1 GG und Urteil des BVG 1 BvR 1384/16

    • Offizieller Beitrag

    10-seitiger haywood uranium weekly market report
    UxJan122023.pdf
    ...
    bg bh


    Daraus ein Scan. Wir sehen ja oft die Kursziele der Institute / Analysten, aber praktisch nie die Abweichungen von der Realität.


    Hier für 4 Uranaktien eine gute Übersicht: Die Kursziele wurden stets zu hoch angesetzt, aber die Tendenzen jeweils zutreffend.


    Grüsse
    Edel

  • https://www.prnewswire.com/new…pv-and-irr-301723039.html


    Fission Announces Tier 1 Economics for PLS with Feasibility Study: Lower Initial CAPEX, Increased Mine Life, NPV and IRR


    These impressive FS results further enhance the robust economics outlined in the 2019 pre-feasibility study (the "PFS"). Highlights include a longer mine life of 10 years, greatly increased after-tax NPV of $1.204B at 8% discount, higher after-tax IRR of 27.2% while still maintaining a very low OPEX of $13.02/lb. All currency figures are expressed in Canadian dollars unless denoted otherwise. The exchange rate used is 0.75 US$/C$1.00. Of additional note, initial CAPEX is marginally lower (~2%) than the PFS for a total of $1.155B – a remarkable achievement given current global inflation. The results confirm the economic strength of the PLS project as well as its minimal environmental footprint. With nuclear energy and the uranium sector strengthening year on year, Fission is ideally positioned to continue developing PLS through the environmental assessment and licensing phase. The FS has an effective date of January 17, 2023.
    Ross McElroy, President and CEO of Fission, commented, "With greatly enhanced economics, including an increase of 42% to the mine life, an incredible 71.5% increase in post-tax NPV and a 10.2% growth in post-tax IRR, this feasibility study confirms the Tier 1 PLS project as one of the most economically significant and elite uranium development projects in the world. Showing CAPEX to be lower than in the 2019 Prefeasibility report, particularly with the pressures of high global inflation, is a remarkable achievement and speaks volumes regarding the team's design and planning abilities. Beyond the economics, the shallow, high-grade nature of our deposit gives us a very small environmental footprint – an advantage that we have built on with comprehensive monitoring since the start of drilling in 2012 and increasing Indigenous engagement. Going forward, thanks to the strength of this feasibility study and the success of our ongoing social engagement, we will continue advancing through the Environmental Assessment and on towards a construction decision."
    Feasibility Study Highlights

    • Construction timeline of 3 years with an estimated initial capital cost of $1.155B
    • Increased mine life to ten years with LOM production of 90.9 million lbs of U3O8
    • Addition of R840W orebody into the FS mine plan contributing to increased Mineral Reserves
    • Average unit operating cost of $13.02/lb U3O8
    • Robust post-tax economics:

      • IRR of 27.2%
      • NPV of $1.204B at 8% discount
      • Payback period of 2.6 years

    Scope for Resource Growth
    While the FS only considers Indicated Resources from the R780E, R840W and R00E zones, the mine plan has been deliberately designed to easily accommodate additional material from the R1515W and R1620E zones based on the potential future conversion of Inferred Resources to Indicated Resources. The majority of mineralization at these two on-strike, high-grade zones is currently defined as Inferred Mineral Resource classification and thus not considered for inclusion in the FS mine plan. As proven by the Company's drilling at the Triple R deposit's R780E, R840W and R00E zones, Fission has an excellent track record of converting Inferred-category resources to Indicated-category. As a result, there is a clear path for growing the deposit, potentially leading to an increased resource as well as a longer mine life.

    • Mine Life and Zone Expansion: The FS mine plan has increased the mine life to 10 years. Both the R780E and R840W zones are open at depth and along the plunge to the east. Further opportunity exists to grow the resource in those directions, potentially extending the underground mine life even further.
    • Additional Zones: The FS mine plan has a future opportunity to accommodate the potential conversion of Inferred Resources to Indicated Resources at two high-grade, on-strike zones - R1515W and R1620E – that are not yet part of Mineral Reserves.
    • Mineralization Upgrade: The FS mine plan does not include areas of Inferred Mineral Resources in the R00E, R840W and R780E zones. An opportunity exists to upgrade to Indicated Mineral Resource with future planned drilling.

    Reduced Environmental Impact

    • The underground mine plan eliminates direct physical impacts on Patterson Lake and the Clearwater River drainage. Other than a dock, freshwater intake and treated effluent diffuser, all other infrastructure related to mining and processing at PLS is set back to maintain an acceptable riparian buffer to the shoreline of Patterson Lake.
    • The revised Project layout maintains a compact footprint, and facilities have been placed to avoid local areas of old-growth jack pine forest and heritage resource sites.
    • In the absence of hydro utilities, using LNG for site power generation instead of diesel, while only marginally reducing the greenhouse gases, significantly decreases emissions of particulates and sulphur and nitrogen compounds.
    • Metallurgical test work indicates that the Project will be able to meet the water quality ranges for treated effluent discharges found at other uranium mining operations in Saskatchewan.
    • Modelling of the Tailings Management Facility (TMF) interactions with groundwater indicates that the current design will be protective of groundwater quality in the long term and thus protective of the Patterson Lake drainage.
    • At year-end 2022, Fission had engagement agreements with all the Indigenous groups with the potential for impacts to their traditional land use and treaty rights due to the Project.
    • Fission responded to local concerns over the proposed bypass of Highway 955 around the site by leaving the road route as it is.

    ...


    bg bh

    Dies irae | Money is made in the DELTA between PERCEPTION and REALITY


    Alle Mitteilungen in diesem Forum sind als
    reine private Meinungsäußerung zu sehen und keinesfalls als
    Tatsachenbehauptung. Hier gilt Artikel 5 GG und besonders Absatz 3
    Dieser Beitrag ist eine persönliche Meinung gem. Art.5 Abs.1 GG und Urteil des BVG 1 BvR 1384/16

  • https://www.newsfilecorp.com/release/151457
    Fission 3.0 Announces Appointment of Sprott Capital Partners

    Kelowna, British Columbia--(Newsfile Corp. - January 17, 2023) - Fission 3.0 Corp. (TSV: FUU) (OTCQB: FISOF) ("Fission 3" or "the Company") is pleased to welcome Sprott Capital Partners ("SCP"), Peter Grosskopf, David Wargo, and Leslie Yang, as financial advisors on strategic matters, including the procurement of potential strategic investors. SCP will assist Fission 3.0 with the advancement of its 100% owned Patterson Lake North ("PLN") project.
    Dev Randhawa, Chairman & CEO of Fission 3, commented: "We are delighted to partner with SCP as we continue to explore the parameters of our new world-class discovery. We note that Mr. Grosskopf, Mr. Wargo and Mr. Yang of the SCP team were closely involved with the formation of Uranium Participation Corp. (now Sprott Physical Uranium Trust) and have unparalleled experience in the financing of global uranium projects."
    SCP, a global leader in precious metals and energy transition investments, is a Toronto & London based independent financial boutique providing a comprehensive suite of capital raising and advisory solutions to natural resource companies. The team consists of experienced finance professionals with major multinational, banking and emerging markets experience that is complemented by geological and engineering expertise.


    Dies irae | Money is made in the DELTA between PERCEPTION and REALITY


    Alle Mitteilungen in diesem Forum sind als
    reine private Meinungsäußerung zu sehen und keinesfalls als
    Tatsachenbehauptung. Hier gilt Artikel 5 GG und besonders Absatz 3
    Dieser Beitrag ist eine persönliche Meinung gem. Art.5 Abs.1 GG und Urteil des BVG 1 BvR 1384/16

  • Fission Uranium gibt Tier-1-Wirtschaftlichkeit für PLS mit Machbarkeitsstudie bekannt: Niedrigere Anfangsinvestitionen, längere Minenlebensdauer, NPV und IRR


    PEAs & Machbarkeitsstudien Uran Athabasca-Becken


    https://www.juniorminingnetwor…ng-brief-for-date-l-b-j-y


    Die Ergebnisse bestätigen, dass PLS eines der besten Uranprojekte der Welt ist


    KELOWNA, BC , 17. Januar 2023 /PRNewswire/ - FISSION URANIUM CORP. ("Fission" oder "das Unternehmen") freut sich, die Ergebnisse einer von Tetra Tech Canada Inc. ("Tetra Tech") durchgeführten Machbarkeitsstudie bekannt zu geben. und mit dem Titel „Machbarkeitsstudie für das Konzessionsgebiet Patterson Lake South“ (das „FS“) für sein Konzessionsgebiet PLS in der kanadischen Region Athabasca Basin.


    Diese beeindruckenden FS-Ergebnisse verbessern die robuste Wirtschaftlichkeit, die in der Vormachbarkeitsstudie 2019 (die „PFS“) skizziert wurde, weiter. Zu den Höhepunkten gehören eine längere Minenlebensdauer von 10 Jahren, ein stark gestiegener Kapitalwert nach Steuern von 1,204 Mrd. $ bei 8 % Rabatt, ein höherer IRR nach Steuern von 27,2 % bei gleichzeitig sehr niedrigen Betriebskosten von 13,02 $ /Pfund. Alle Währungsangaben sind in kanadischen Dollar ausgedrückt, sofern nicht anders angegeben. Der verwendete Wechselkurs beträgt 0,75 US$ / 1,00 CAD . Zusätzlich ist anzumerken, dass die anfänglichen CAPEX mit insgesamt 1,155 Mrd. USD geringfügig niedriger (~2 %) als die PFS sind – eine bemerkenswerte Leistung angesichts der aktuellen globalen Inflation.Die Ergebnisse bestätigen die wirtschaftliche Stärke des PLS-Projekts sowie seinen minimalen ökologischen Fußabdruck. Da die Kernenergie und der Uransektor von Jahr zu Jahr stärker werden, ist Fission ideal positioniert, um PLS während der Umweltprüfungs- und Lizenzierungsphase weiterzuentwickeln. Das FS tritt am 17. Januar 2023 in Kraft .


    Ross McElroy, Präsident und CEO von Fission, kommentierte: „Diese Machbarkeitsstudie basiert auf erheblich verbesserter Wirtschaftlichkeit, einschließlich einer Steigerung der Minenlebensdauer um 42 %, einer unglaublichen Steigerung des Kapitalwerts nach Steuern um 71,5 % und einer Steigerung des IRR nach Steuern um 10,2 % bestätigt das Tier-1-PLS-Projekt als eines der wirtschaftlich bedeutendsten und elitärsten Uranentwicklungsprojekte der Welt.Der Nachweis, dass die CAPEX niedriger sind als im Vormachbarkeitsbericht 2019, insbesondere angesichts des Drucks der hohen globalen Inflation, ist eine bemerkenswerte Leistung und spricht Bände in Bezug auf die Design- und Planungsfähigkeiten des Teams.Abgesehen von der Wirtschaftlichkeit beschert uns die oberflächennahe, hochgradige Natur unserer Lagerstätte einen sehr geringen ökologischen Fußabdruck – ein Vorteil, auf dem wir seit Beginn der Bohrungen im Jahr 2012 mit umfassender Überwachung und zunehmender Indigenität aufgebaut haben Engagement.Dank der Stärke dieser Machbarkeitsstudie und dem Erfolg unseres kontinuierlichen sozialen Engagements werden wir die Umweltverträglichkeitsprüfung bis hin zu einer Bauentscheidung weiter vorantreiben."


    Höhepunkte der Machbarkeitsstudie


    Bauzeitplan von 3 Jahren mit geschätzten Anfangskapitalkosten von 1,155 Mrd. $


    Verlängerung der Lebensdauer der Mine auf zehn Jahre mit einer LOM-Produktion von 90,9 Millionen Pfund U 3 O 8


    Hinzufügung des R840W-Erzkörpers zum FS-Minenplan, der zu erhöhten Mineralreserven beiträgt


    Durchschnittliche Betriebskosten je Einheit von 13,02 $ /lb U 3 O 8


    Robuste Wirtschaftlichkeit nach Steuern:


    IRR von 27,2 %


    NPV von 1,204 Mrd. $ bei 8 % Rabatt


    Amortisationszeit von 2,6 Jahren


    Bitte selbst lesen, Artikel mit Überlänge.


    gruss RS :thumbup:

  • deep yellow
    CRITICAL MINERALS ASSESSMENT OF MULGA ROCK PROJECT
    HIGHLIGHTS
    • Completion of 63-hole, 4,099m aircore drilling program to support a geo-metallurgical study
    at the Mulga Rock Project (MRP).
    • Geo-metallurgical test work will commence in Q1 2023 and inform an updated assessment
    of critical minerals and recovery options.
    • Test work results will form the basis for the planned revised MRP Definitive Feasibility Study
    (DFS), to include potential uplift in project value due to recovery of critical minerals.
    • A 600 to 800-hole aircore drill program is planned for H1 2023, to:
    o Better define reserve/resource variability and distribution of critical minerals
    o Upgrade resource classification for uranium and critical minerals
    o Provide additional material for metallurgical analysis
    https://deepyellow.com.au/wp-c…lgaRockProject20Jan23.pdf



    haywood uranium weekly 19.01
    SMR Traction Growing as Frequency of New Initiatives Increases – Fission Publishes FS on PLS
    https://clients.haywood.com/up…d_reports/UxJan192023.pdf



    bg bh

    Dies irae | Money is made in the DELTA between PERCEPTION and REALITY


    Alle Mitteilungen in diesem Forum sind als
    reine private Meinungsäußerung zu sehen und keinesfalls als
    Tatsachenbehauptung. Hier gilt Artikel 5 GG und besonders Absatz 3
    Dieser Beitrag ist eine persönliche Meinung gem. Art.5 Abs.1 GG und Urteil des BVG 1 BvR 1384/16

    Einmal editiert, zuletzt von Blue Horseshoe ()

  • die story um sanktionswürdiges verhalten rosatomprom´s sorgt heute wohl
    für eine schöne allgemeine kursentwicklung...
    https://www.washingtonpost.com…aine-war-effort-sanctions


    im falle von sanktionen letztendlich nur mehr "freie" kapazitäten für den globalen süden.



    Dies irae | Money is made in the DELTA between PERCEPTION and REALITY


    Alle Mitteilungen in diesem Forum sind als
    reine private Meinungsäußerung zu sehen und keinesfalls als
    Tatsachenbehauptung. Hier gilt Artikel 5 GG und besonders Absatz 3
    Dieser Beitrag ist eine persönliche Meinung gem. Art.5 Abs.1 GG und Urteil des BVG 1 BvR 1384/16

  • Ordinary Rebalance | Solactive Global Uranium & Nuclear Components Total Return Index | Effective Date 1st February 2023



    https://www.solactive.com/ordi…e-date-1st-february-2023/

    western uranium raus, fission 3 rein....

    Dies irae | Money is made in the DELTA between PERCEPTION and REALITY


    Alle Mitteilungen in diesem Forum sind als
    reine private Meinungsäußerung zu sehen und keinesfalls als
    Tatsachenbehauptung. Hier gilt Artikel 5 GG und besonders Absatz 3
    Dieser Beitrag ist eine persönliche Meinung gem. Art.5 Abs.1 GG und Urteil des BVG 1 BvR 1384/16

  • western uranium raus, fission 3 rein....

    beim kaffe nochmal angeschaut, wenn ich nichts übersehen habe, also keine garantie...
    https://www.solactive.com/ordi…e-date-1st-february-2023/


    sind neu ab 01.02. vertreten aee, nuscale, sput
    appia und fmc fallen raus

    Dies irae | Money is made in the DELTA between PERCEPTION and REALITY


    Alle Mitteilungen in diesem Forum sind als
    reine private Meinungsäußerung zu sehen und keinesfalls als
    Tatsachenbehauptung. Hier gilt Artikel 5 GG und besonders Absatz 3
    Dieser Beitrag ist eine persönliche Meinung gem. Art.5 Abs.1 GG und Urteil des BVG 1 BvR 1384/16

  • Uran-ETFs welcher ist besser ?


    Ich bin in beiden investiert, aber stärker in Hanetf-Sprot: 0,85% Mangementgebühr bei 35Mill Volumen


    . Der andere hat den Vorteil von nur 0,65% Mangementgebühr bei 28Mill Volumen.
    Da ich mich hauptsächlich um Edelmetalle kümmere wollte ich nicht auch noch tiefer in Uran einsteigen, daher ETFs. Wenn einer von euch sich damit schon eingehender befaßt hat, wäre ich dankbar um eine persönliche Einschätzung.



    GL.X-URANIUM DLA


    11,253 €12,266 $+0,52%


    24.01.23 00:00:00 KAG aktualisieren | Mehr Kurse »


    WKN: A3DC8S



    HANETF-SPROT.URAN.MNG.DLA


    6,9719 €7,597 $+0,34%


    24.01.23 00:00:00 KAG aktualisieren | Mehr Kurse »
    WKN: A3DJZY

  • warum kaufst du nicht einfach den urnm/urnmx, auch über nyse arca/toronto?
    https://sprottetfs.com/urnm-sprott-uranium-miners-etf/

    Dies irae | Money is made in the DELTA between PERCEPTION and REALITY


    Alle Mitteilungen in diesem Forum sind als
    reine private Meinungsäußerung zu sehen und keinesfalls als
    Tatsachenbehauptung. Hier gilt Artikel 5 GG und besonders Absatz 3
    Dieser Beitrag ist eine persönliche Meinung gem. Art.5 Abs.1 GG und Urteil des BVG 1 BvR 1384/16

  • @Blue Horseshoe: Dies liegt daran, dass wir (=Privatanleger/Kleinanleger) keine US-ETFs handeln dürfen. Darunter die Erklärung und es geht hier um den Schutz der Privatanleger oder Kleinanleger. Was ich aber nicht verstehe, wieso hier im Forum so viele Foristen von dieser Einschränkung nicht betroffen sind.


    ***
    LYNX
    Über LYNX ist für Privatanleger kein Handel mit US-ETFs möglich. Auch ETFs aus Kanada, Mexiko, Hongkong und Australien sind aktuell nicht für den Handel zugelassen. Jedoch ist das Halten und Verkaufen von bestehenden Positionen weiterhin gestattet.


    Die Gesetze und Verordnungen in Bezug auf PRIIP erfordern, dass die Emittenten dieser Produkte für jedes Produkt ein so genanntes Key Information Document (KID) bereitstellen. Da die Herausgeber dieser Produkte keine deutschsprachigen KIDs anbieten, ist es nicht möglich, diese Produkte zu kaufen.


    Bitte beachten Sie: Kunden, die als Professionell (nach MiFID-Kategorisierung) eingestuft werden, können US-ETFs über LYNX auch weiterhin handeln.
    Quelle: https://hilfe.lynxbroker.de/wi…-etfs-handeln-ueber-lynx/


    ***
    INTERACTIVE BROKER
    Die Gesetzkundgebungsakte der Europäischen Union, auch bekannt als Richtlinie über Märkte für Finanzinstrumente, oder MiFID, geändert durch MiFID II, verpflichtet Interactive Brokers (U.K.) Limited (IBUK) dazu, jeden Kunden entsprechend ihres Wissens, ihrer Erfahrung und Expertise als „Kleinanleger”, „professioneller Anleger” oder „geeignete Gegenpartei” einzustufen.
    Quelle: https://ibkr.info/de/article/3298

  • es sieht gut aus für URAN-Aktienwerte, denn


    inzwischen hat auch der letzte Staatsmann erkannt, dass er sich die Amis lediglich mit Atomwaffen, die bis ins feindliche Zielgebiet fliegen können, ohne zuvor abgeschossen zu werden, und treffen, vom Leib halten kann.


    Jedes noch so kleine Land wird deshalb nach Atomkraft für zivile Zwecke ersuchen um mittels ziviler Reaktoren genug Plutonium zu erzeugen, um damit vor US sicher zu sein.


    Der kleine Dicke in Nordkorea hat das schon vor Jahren verstanden und praktiziert das inzwischen erfolgreich.


    Nicht dass ich diesen Trend begrüßen würde, aber nur mit einer überzeugend dicken Wumme hält man sich potenzielle Räuber vom Hals.

  • Jedes noch so kleine Land wird deshalb nach Atomkraft für zivile Zwecke ersuchen um mittels ziviler Reaktoren genug Plutonium zu erzeugen, um damit vor US sicher zu sein.

    ein reaktor ist für die herstellung von nuklearwaffen nicht nötig.. nicht in zeiten von zentrifugen und laser enrichment.


    bg bh

    Dies irae | Money is made in the DELTA between PERCEPTION and REALITY


    Alle Mitteilungen in diesem Forum sind als
    reine private Meinungsäußerung zu sehen und keinesfalls als
    Tatsachenbehauptung. Hier gilt Artikel 5 GG und besonders Absatz 3
    Dieser Beitrag ist eine persönliche Meinung gem. Art.5 Abs.1 GG und Urteil des BVG 1 BvR 1384/16

Schriftgröße:  A A A A A