Pretium Resources / PVG (NYSE,TSX)

  • Man ist sehr bemüht, die angekündigten Maßnahmen schnell umsetzen zu können:



    Pretium Resources Inc.: Brucejack Mine Ramp-Up Advances


    02/26/2018




    VANCOUVER, British Columbia, Feb. 26, 2018 (GLOBE NEWSWIRE) -- Pretium Resources Inc. (TSX:PVG) (NYSE:PVG) (“Pretivm” or the “Company”) is pleased to report that the ramp-up continues to advance at the high-grade gold Brucejack Mine, and the mine remains on track to reach steady state production mid-to-late 2018. Additionally, an exploration drill program has been initiated underground to test for a porphyry source and evaluate the potential extension of the Valley of the Kings deposit to the east.


    Optimizing Operations


    To improve access and build stope inventory the rate of underground development has been increased to 700 meters per month, up from 420 meters originally envisioned in the Brucejack Feasibility Study. A third long-hole drill is now on site to serve as a back-up drill and will also be utilized to increase the rate of underground production to build stope inventory, which is expected to increase to 10 to 12 stopes with a range of grades by mid-year. The availability of stopes representing a range of grades, including multiple higher grade stopes, will allow mining operations to optimize stope blending and provide alternative stopes with comparable grades for mining in the event of operational issues with any stopes. The increased stope inventory is expected to improve the management of production grades as the ramp-up continues.


    Operational Grade Control


    The grade control program is underway and is currently being integrated into the mining process. The grade control program, which comprises sampling and drilling, is designed to refine stope dimensions, reduce dilution and optimize grade.


    Stope Ring Sampling


    As part of the grade control program, grade is estimated on a ring-by ring basis to refine the shape of the long-hole stope prior to mining. Long-hole drill cuttings are selectively collected from each ring within a stope and split to a smaller sample size. The reduced sample is then assayed. Assayed data from each of the rings is then fed back into the short-term mine planning cycle to refine stope dimensions.


    The upgraded and modified underground sample splitting station is now functional. The sample splitting station is used to further validate the sampling process.


    Reverse Circulation Drilling


    Another component of the grade control program, reverse circulation (RC) drilling to optimize stope definition, has commenced on a trial basis. The RC drill will cross-cut the stopes drilling 5-meter to 7.5-meter centers to refine stope location and dimensions prior to mining. The RC drilling will provide a larger sample per meter and is expected to be faster and more cost effective than core drilling, which has been used for infill drilling to date.


    Exploration Drilling for Porphyry Source


    An exploration drill program has been initiated to test for a porphyry source and evaluate the potential extension of the Valley of the Kings to the east. The drill program will follow-up on the success of the 2015 regional grass-roots exploration drill program. High-grade gold was intersected in the Flow Dome Zone, located approximately 500 meters east of the Brucejack Mine, confirming the presence of either a new stockwork zone or an extension of the Valley of the Kings deposit (see news release dated October 8, 2015). A drill has been set up underground on the eastern edge of the 1200-meter Level of the Valley of the Kings development. Two drill holes, each 1,600 meters long will serve to provide a continuum of information from the Valley of the Kings to the Flow Dome Zone. The drilling will also test below the Flow Dome Zone where structural geology combined with a geophysical anomaly suggests a potential porphyry source.


    Lyle Morgenthaler, B.A.Sc., P.Eng., Chief Mine Engineer, Pretium Resources Inc. is the Qualified Person (“QP”) responsible for Brucejack Mine development. Warwick Board, Ph.D., P.Geo, Pr.Sci.Nat., Vice President, Geology and Chief Geologist, Pretium Resources Inc. is the Qualified Person (“QP”) responsible for the Brucejack Mine exploration drilling.

  • Meinung des angry geologist: Pretium - everything is great
    Man sollte sich jedoch nicht von obigem wohlklingenden Titel täuschen lassen. ;)


    So, to do this, all they need to do is solve the grade control issues, improve mine scheduling,
    improve recovery, and increase the underground development. Nice and easy.
    If they don't manage this, at 3,800 tonnes per day each 1 g/t decrease in head-grade means
    a drop in production by 44,000 ounces, or $57M decrease in revenues.
    [...]


    saludos

  • Es ist ganz einfach so: Wer vor einem Jahr (als die Stimmung gut war) investiert hat, hat prozyklisch eingekauft.
    Wer heute (die Stimmung ist schlecht) investiert, kauft antizyklisch.
    ...
    Ein anderes aktuelles Beispiel für schwächere Kurse war in den letzten Tagen Pretium. Die hatte ich im Spätsommer 2016 verkauft, weil (wie oben beschrieben) wahnsinnig oft etwas schiefgeht, besonders auch beim Produktionsstart. Hier warte ich mit einem Rückkauf jetzt aber ab, weil ich erst sehen möchte, wie und auf welche Weise der Markt sich auskotzt (bitte entschuldigt die Wortwahl); man weiß nie, wie weit eine Korrektur bei den Standardaktien läuft und wie sehr dadurch - unabhängig vom Goldpreis - die Minenaktien unter die Räder kommen.

    Das oben Zitierte hatte ich am 5.2. in der Klondex-Diskussion geschrieben.


    Die Stimmung dürfte mittlerweile vollends im Eimer sein, und die Entwicklung des Pretium-Kurses in den vergangenen Tagen steht im Einklang mit den Minenaktien allgemein. Deshalb habe ich nun ein Limit in den Markt gegeben: 6,22 USD; das ist genau die Hälfte des in den vergangenen 52 Wochen erreichten Höchstkurses.


    Augen zu und durch. Wann soll man denn kaufen, wenn nicht jetzt und bei dieser Stimmung?!

    • Offizieller Beitrag

    Glenn Chan über die finanzielle Gemengelage bei Pretium und ein Dr. Dominy über den geologischen Aspekt.
    Pretium part 1: Free cash flow analysis
    Pretium part 2: Dr. Simon Dominy describes Brucejack’s geology


    Habe mich heute von meiner kleinen noch verbliebenen Freiläuferposition verabschiedet. :(
    Das Geld kann man derzeit besser anlegen.


    So sah ich das auch, obwohl PVG sehr hoher FL ist / war, Was nützen derartige Positionen, wenn sie träger sind als andere.
    Sehr informative Infos zur Geologie, erinnert ja an den alten Streit mit Strathcona.


    Alles in allem ist gegenüber früheren Erwartungen, daß Pretium DIE Goldmine sei, die Realität ernüchternder...


    Grüsse
    Edel


    "Die Märkte haben nie unrecht, die Menschen oft." Jesse Livermore, 20.Jh.


    "Die Demokratie ist das Paradies der Schreier und Schwätzer, Phraseure, Schmeichler und Schmarotzer, die jedem sachlichen Talent weit mehr den Weg verlegen, als dies in einer anderen Verfassungsform vorkommt." E.von Hartmann


    Dieser Beitrag ist eine persönliche Meinung gem. Art.5 Abs.1 GG und Urteil des BVG 1 BvR 1384/16

  • Moin moin,


    die Ergebnisse für Q 1 2018 werden leider nicht mit 2017 verglichen und die Prognose zur Jahresproduktion lässt einen großen Spielraum. - Man weiß es nicht so genau, sagt uns das. Immerhin werden die Ergebnisse von Januar bis März stetig besser.

    LG Vatapitta

  • Es scheint so, als könne man die Probleme in den Griff bekommen ?)
    Mal abwarten, ob sich die positive Entwicklung im 2. Quartal fortsetzt - dann wäre eine erste Position denkbar 8)

  • Moin moin,


    PVG notiert ca. 10% über dem Jahrestief und wird bei CapitalCube mit einem fundamentalen Score von 65 und
    als undervalued eingestuft. Im Januar und Februar gab es Insiderkäufe über dem aktuellen Niveau.


    Die Präsentation aus dem April zeigt Upside Potential.


    Wie sehen die Chartfreunde die Kursentwicklung?



    LG Vatapitta

  • Moin @vatapitta!


    Vielleicht ist folgender Artikel für Dich auch von Interesse...


    https://seekingalpha.com/artic…-production-cost-guidance


    Charttechnisch sieht es m.E. gut aus. Ich stehe zwar selbst auch noch an der Seitenlinie, gehe hier aber - abgesehen von kleineren Rücksetzern - auch wieder von künftig steigenden Kursen aus. Ausgehend vom Hoch Anfang 2017 haben wir bis Ende Februar 2018 fast exakt 61,8 % ( Fibo-Retracement) des Anstiegs seit dem Tief Ende 2013 korrigiert. Hinsichtlich einer ABC-Korrektur ausgehend vom o.g. Hoch würde 1,27 A = C in etwa passen. Zudem bewegt sich der Kurs im Bereich der langfristigen Aufwärtstrendlinie und scheint sich im Moment an dieser entlangzuschlängeln. Ich vermute, dass sich der Kurs bald nach oben absetzen könnte, natürlich abhängig vom POG und News.


    Gruß, Jones

  • Wird vom Markt positiv aufgenommen.




    VANCOUVER, British Columbia, July 09, 2018 -- Pretium Resources Inc. (TSX:PVG) (NYSE:PVG) ("Pretivm" or the "Company") is pleased to report second quarter gold production results and provide guidance for the second half of 2018 for the Brucejack Mine.
    Second Quarter 2018 Production Summary


    • 111,340 ounces of gold produced
    • 14.9 grams per tonne gold mill feed grade
    • 97.7% gold recovery rate
    • 236,990 tonnes of ore milled
    • 2,604 tonnes per day ore milled


    "With more than 187,000 ounces produced in the first half of 2018, we have delivered on our first half 2018 guidance of 150,000 to 200,000 ounces of gold," said Pretivm President & CEO Joseph Ovsenek. "The successful integration of our grade control program into our mining process has resulted in increased grade to the mill with production exceeding grade control estimates for the quarter. Brucejack has now achieved steady-state production, and we expect to deliver 200,000 to 220,000 ounces of gold for the second half of 2018."
    Second Quarter 2018 Monthly Production


    Gold
    Production
    (oz)
    Gold
    Grade
    (g/t)
    Recovery
    (%)
    Ore
    Milled
    (t)
    April 35,89116.697.873,222
    May 36,97814.297.481,611
    June 38,47114.197.982,157
    Q2 2018 111,34014.997.7236,990



    Grade control integration and steady state gold production
    Gold production from March throughout the second quarter has reflected the full integration of the operational grade control program which comprises drilling, sampling and local modelling. Grade control is critical for grade prediction and the refinement of stope shapes, which results in reduced dilution and optimized grade to the mill.
    Operational grade control: Infill drilling
    A reverse circulation ("RC") drill was introduced as part of a trial program to improve the efficiency and productivity of infill drilling. The RC drill has now been demobilized as it did not deliver the expected cost savings or productivity gains. Going forward, the infill drill program will be carried out with diamond drills.
    Mining
    To improve access and build stope inventory, the rate of underground development was increased to 700 meters per month, up from the 420 meters contemplated in the 2014 Brucejack Feasibility Study. The development rate increase began in January and is expected to remain at an average of 700 meters per month during the duration of stope inventory build-up in 2018.
    With the results of the infill drill program now available for the benefit of short-term stope design, the stope inventory build-up is expected to increase to 10 to 12 stopes during the third quarter. The increased stope inventory will improve the management of production grades.
    Steady State Production - Second Half 2018 Guidance
    Production Guidance
    Gold production at Brucejack for the second half of 2018 is expected in the range of 200,000 ounces to 220,000 ounces, for total 2018 gold production of 387,000 ounces to 407,000 ounces.
    Financial Guidance
    All in sustaining costs1 for the second half of 2018 are expected to range from US$710 per ounce gold sold to US$770 per ounce gold sold. As production has now reached steady state at the Brucejack Mine, an increased focus will be placed on operational efficiency to reduce costs.

  • Der Markt regiert positiv drauf. [Blockierte Grafik: http://www.goldseiten-forum.com/wcf/images/smilies/smile.png] bsi



    Pretium Resources: Finanz- und Produktionszahlen für Q2 und das erste Halbjahr
    10:45 Uhr | Minenportal.de
    [Blockierte Grafik: https://www.goldseiten.de/bilder/minen/logos/1961.png]
    Pretium Resources Inc.
    informierte gestern über die finanziellen und operativen Ergebnisse des
    zweiten Quartals und des ersten Halbjahres 2018. Die Goldproduktion lag
    in den drei Monaten demnach bei rund 111.300 oz, die Silberproduktion
    bei 118.200 oz. Im der ersten Jahreshälfte förderte das Unternehmen
    insgesamt 187.000 oz Gold und 212.900 oz Silber. Vergleichszahlen aus
    dem Vorjahr liegen nicht vor, da die Goldmine Brucejack die kommerzielle
    Produktionsphase erst am 1. Juli 2017 erreicht hatte.



    Die
    Einnahmen beliefen sich im Juniquartal auf 146,5 Mio. $ und im ersten
    Halbjahr auf 235,9 Mio. $. Bei seinen Goldverkäufen erzielte das
    Unternehmen im Quartal einen Durchschnittspreis von 1.278 $, verglichen
    mit einem durchschnittlichen Marktpreis von 1.306 $. Die All-in
    Sustaining Costs betrugen 648 $/oz im Quartal und 783 $/oz im Halbjahr.



    In
    den drei Monaten ergab sich ein operativer Cashflow von 77,3 Mio. $; im
    Zeitraum von Januar bis Juni belief er sich auf 102,0 Mio. $.



    Unterm
    Strich konnte Pretium im zweiten Quartal einen Nettogewinn 31,1 Mio. $
    bzw. 0,17 $ je Aktie verbuchen. Im gesamten ersten Halbjahr wurde ein
    Gewinn von 23,0 Mio. $ bzw. 0,13 $ je Aktie erzielt.




    © Redaktion MinenPortal.de

  • Wirklich schöne Zahlen. Leider bin ich hier nicht investiert, sondern hatte den Junior bislang nur auf der WL.
    Hat das Unternehmen eigentlich weitere Planzahlen (Gesamt '18, 2019 ...) veröffentlicht?


    Grüße
    GS

  • Öfter mal was neues, shortseller Viceroy attackiert Pretium Resources.
    Ähnlich geartete Anschuldigungen gegen Pretium gab es in der Vergangenheit ja bereits.


    Viceroy Says It's Shorting Canadian Miner Pretium Resources

    Zitat

    The New York-based short seller -- which rose to prominence last year with research into financial irregularities at South African retail giant Steinhoff International Holdings NV -- released a report Thursday saying Vancouver-based Pretium has distorted results from its Brucejack gold mine in the northwest province of British Columbia.


    “Our mine valuation – coupled with Pretium’s overleveraged balance sheet – lead us to believe Pretium equity is effectively worthless ...

    Viceroy mit Stellungnahme: Pretium Resources – digging up dirt


    saludos

  • Pretium´s falsche Prognosen hinsichtlich ihrer Brucejack-Mine und damit im Zusammenhang stehende Informationspolitik wird in den Staaten von einigen Anwaltskanzleien aufgegriffen.
    S.G. "Class-Action" / Sammelklagen sind geplant, Einladungen an diesen teilzunehmen sind ausgesprochen.


    https://www.goldseiten.de/minen/1961--Pretium-Resources-Inc
    s. unter: Nachrichten, Englisch


    U.A. z.B.
    https://www.bernlieb.com/cases…ss-action-fraud-stock-80/
    Zitat: According to the lawsuit, throughout the Class Period Defendants made false and/or misleading statements and/or failed to disclose that: (1) the Brucejack Project is not a high-grade, high-output mine; and (2) as a result of the foregoing, Defendants’ positive statements about the Company’s business, operations, and prospects were materially false and/or misleading and/or lacked a reasonable basis. When the true details entered the market, the lawsuit claims that investors suffered damages.


    Kennt sich jemand mit Beteiligung an US-Sammelklagen aus?
    Sinn- oder Widersinn, Beteiligungsrisiko / Kosten?


    Wie ich dem Thread entnehme, sollte es -ausser mir- einige "Betroffene" auch unter Euch hier geben ...



    Grüße
    Magor

    • Offizieller Beitrag

    US-Sammelklagen im Anlagebereich:


    1. Kaufe dir eine Lupe, damit du den Feindruck auf der Postkarte lesen kannst
    2. Suche die Kaufs- und Verkaufsunterlagen der Aktie heraus-
    3. Wenn es passt mit den Daten, kannst du ja mitmachen. Als Sammelkläger bezahlst du nichts.
    4. Danach vergiss die Angelegenheit. Es schaut bei ein paar lumpigen Mio USD idR nichts raus (falls die Klage überhaupt zugelassen wird)-


    Da müsste schon ein Betrug "Madoff-Style" vorliegen (und auch da schwierig, wenn kein Geld mehr da ist....)


    Also meist verlorene Liebesmühe. Ausserdem sind die Gerichte überlastet...



    Es gilt das alte "Caveat emptor!" (Schau vorher, was du kaufst).


    Gruss,
    Lucky

  • Aktuell -11%


    Pretium Resources Inc.: Brucejack Mine Q3 2018 Production Update
    11:00 Uhr | GlobeNewswire
    [Blockierte Grafik: https://www.goldseiten.de/bilder/minen/logos/1961.png]
    VANCOUVER, Oct. 09, 2018 - Pretium Resources Inc. (TSX/NYSE:PVG) (“Pretivm” or the “Company”) is pleased to report third quarter gold production results for the Brucejack Mine.
    Third Quarter 2018 Summary


    • 92,641 ounces of gold produced
    • 12.4 grams per tonne gold mill feed grade
    • 97.4% gold recovery rate
    • 240,122 tonnes of ore milled
    • 2,610 tonnes per day ore milled
    • Over $190 million cash position as of September 30, 2018


    “We added $48 million to our cash on hand during the third quarter, and are focused on sustaining long-term profitability,” said Pretivm President & CEO Joseph Ovsenek. “We are on our way to meeting our gold production guidance of 200,000 to 220,000 ounces of gold for the second half of 2018.”
    Third Quarter and Nine Months 2018 and Third Quarter 2017 Production Summary


    3Q 2018 3Q 2017 (1)Nine Months, Sept 30, 2018
    Ore Milledtonnes240,122261,262728,555
    Head Gradeg/t12.410.512.0
    Recovery%97.496.597.4
    Gold Ounces Producedoz.92,64182,203279,670


    1. 3Q 2017 represents the Company’s first quarter of commercial production.


    Third Quarter 2018 Operational and Financial Results – Webcast and Conference Call
    Pretivm plans to release its third quarter 2018 operational and financial results after market close on Thursday, November 8, 2018. The webcast and conference call to discuss these results will take place Friday, November 9, 2018 at 8:00 am PT (11:00 am ET).

  • Die detaillierten Ergebnisse zum Ende des 3. Quartals - es sieht gut aus, fast alle maßgeblichen Parameter nehmen eine positive Entwicklung! :thumbup:


    Meldung




    Pretivm Reports Third Quarter 2018 Results


    01:55 Uhr | GlobeNewswire
    [Blockierte Grafik: https://www.goldseiten.de/bilder/minen/logos/1961.png]
    Brucejack Mine delivers profitability; significant cash build
    VANCOUVER, Nov. 08, 2018 - Pretium Resources Inc. (TSX/NYSE:PVG) (“Pretivm” or the “Company”) is pleased to report financial and operating results for the third quarter and first nine months of 2018.
    All amounts are in US dollars unless otherwise noted. This release should be read in conjunction with the Company’s Financial Statements and Management’s Discussion and Analysis (“MD&A”) available on the Company’s website and on SEDAR and EDGAR.
    “Brucejack delivered another profitable quarter in a declining gold price environment, which speaks to the robust economics of the mine,” said Joseph Ovsenek, President & CEO of Pretivm. “We have generated significant earnings from mine operations every quarter since achieving commercial production, and have built a cash balance of over $190 million. We remain on track to refinance our construction debt facility and repurchase the precious metals stream by year-end without issuing equity.”
    Third Quarter 2018 Summary


    • Production of 92,641 ounces of gold at a mill feed grade of 12.4 grams per tonne gold.
    • Revenue of $110.1 million on 94,458 ounces of gold sold.
    • Total cost of sales $72.5 million or $767 per ounce of gold sold1.
    • All-in Sustaining Cost (“AISC”)1 of $709 per ounce of gold sold.
    • Net earnings of $10.7 million ($0.06 per share).
    • Adjusted earnings1 of $26.3 million ($0.14 per share).
    • Generated $52.4 million cash from operating activities.
    • Cash and cash equivalents balance of $190.3 million as at September 30, 2018.
    • Notice was delivered to repurchase 100% of the gold and silver stream that was sold as part of the construction financing package.
    • Subsequent to the end of the quarter, a commitment letter for a fully underwritten $480.0 million debt facility to refinance the existing construction credit facility was executed.
  • Heute Absturz, momentan -1,02 USD entsprechend 11,63 %. Was ist da los?


    Zweifel an der Geologie hat es schon früher gegeben, bestätigen die sich jetzt? Oder ist es nur ein Börsenphänomen?


    Hatte sie früher mal, derzeit auf der watchlist.


    Gruß! Fritz

    Pressefreiheit ist die Freiheit von zweihundert reichen Leuten, ihre Meinung zu verbreiten.“ — Paul Sethe. Leserbrief SPIEGEL, 5. Mai 1965.

Schriftgröße:  A A A A A